| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| PAINT EXTERIOR WALLS, FAC. 1409 | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 17-1029 | B. 1409, AREA F | |||||||||||
| MATERIAL and LABOR COSTS | LABOR COSTS | |||||||||||
| LINE ITEM NO. | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | MANHOUR MANDAYS (6) | AVERAGE RATE (7) | TOTAL (8) | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | ||
| ALLOWANCE FOR HEIGHT | ||||||||||||
| 1 | USE OF SCAFFOLD / AERIAL PLATFORM | IT. No. | 4.a | L.S. | 1 | € 0.00 | € - 0 | € - 0 | ||||
| MOULD / MUSK PROOF TREATMENT | ||||||||||||
| 2 | INSTALL ONE COAT OF MOULD / MUSK PROOF TREATMENT | IT. No. | 4.b | Sq. Mt. | 530 | € 0.00 | € - 0 | 0.0 | € - 0 | € - 0 | € - 0 | |
| SURFACE CLEANING | ||||||||||||
| 3 | HYDRO JETBLAST / CLEANING WALLS TO BE PAINTED | IT. No. | 4.c | Sq. Mt. | 530 | € 0.00 | € - 0 | 0.0 | € - 0 | € - 0 | € - 0 | |
| SURFACE PREPARATION, PLASTER / CRACKS REPAIR | ||||||||||||
| 3 | WALL SURFACES: DEMOLITION, PLASTER, REPAIR | IT. No. | 4.d | L.S. | 1 | € 0.00 | € - 0 | 0.0 | € - 0 | € - 0 | € - 0 | |
| HUMIDITY PROOF PLASTER (DEUMIDIFICANTE) | ||||||||||||
| 4 | DEMOLISH PLASTER UP TO 85 CM ALONG PERIMETER | IT. No. | 4.e.1 | Sq. Mt. | 160 | € 0.00 | € - 0 | 0.0 | € - 0 | € - 0 | € - 0 | |
| 5 | INSTALL PLASTER UP TO 85 CM ALONG PERIMETER | IT. No. | 4.e.2 | Sq. Mt. | 160 | € 0.00 | € - 0 | 0.0 | € - 0 | € - 0 | € - 0 | |
| COVER EXISTING ARCHITECTURAL JOINTS | ||||||||||||
| 6 | REMOVE OLD SEALANT, CLEAN, FILL WITH MORTAR | IT. No. | 4.f | Mt. | 530 | € 0.00 | € - 0 | 0.0 | € - 0 | € - 0 | € - 0 | |
| REINFORCED PLASTERING CYCLE (RASATURA ARMATA) | ||||||||||||
| 7 | INSTALLATION OF THIN PLASTERING CYCLE (COLORED) | IT. No. | 4.g | Sq. Mt. | 530 | € 0.00 | € - 0 | 0.0 | € - 0 | € - 0 | € - 0 | |
| FINISHING PLASTERING CYCLE (RASATURA FINITURA) | ||||||||||||
| 8 | INSTALLATION OF THIN PLASTER (COLORED ) | IT. No. | 4.h | Sq. Mt. | 530 | € 0.00 | € - 0 | 0.0 | € - 0 | € - 0 | € - 0 | |
| PAINT EXTERIOR WALLS | ||||||||||||
| 9 | PRIMER, TWO COATS PAINT | IT. No. | 4.i | Sq. Mt. | 530 | € 0.00 | € - 0 | 0.0 | € - 0 | € - 0 | € - 0 | |
| TOTAL | € - 0 |