ASHE 18-1040 TECHNICAL SPECIFICATIONS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Additional_Requirements.pdf | ||
| FA568218R0027.pdf | ||
| ASHE_18-1040_DWGS_REV1.pdf | ||
| ASHE_18-1040_Specs_100__rev_01.pdf | ||
| ASHE_18-1040_Cons_Cost_Estimate_100_.xls | XLS spreadsheet | |
| Master_Technical_Specs_Nov_2005_English.zip | ZIP file | |
| ASHE_18-1040_PdS_100_.pdf | ||
| ASHE_18-1040_Dwgs_100_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared and Submitted by:
Architecture, Engineering and Consulting Services
SO.IN.CI. S.r.l.
Via di Sacco Pastore n. 4 - Rome, Italy
Tel. +39.06.97848041 fax +39.06.97848175 E-mail: design@soinci.it
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
PROJECT ASHE 18-1040
RENOVATE HANGAR 3, BLDG. 933 FOR HMU
AREA F - AVIANO AB, ITALY
TECHNICAL SPECIFICATIONS
FINAL SUBMITTAL (100%)
Date: March 2018
A/E CONTRACT No.: FA5682-17-D-0002 D.O.: F0037
Prepared and Submitted by:
Architecture, Engineering and Consulting Services
SO.IN.CI. S.r.l.
Via di Sacco Pastore n. 4 - Rome, Italy
Tel. +39.06.97848041 fax +39.06.97848175 E-mail: design@soinci.it
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
PROJECT ASHE 18-1040
RENOVATE HANGAR 3, BLDG. 933 FOR HMU
AREA F - AVIANO AB, ITALY
HAVING REVIEWED THE DEFINITIVE AND DETAILED PROJECT, I DECLARE THAT I HAVE ASCERTAINED THAT
THE STRUCTURES AND THE TECHNOLOGICAL SYSTEMS INCLUDED THEREIN COMPLY WITH THE APPLICABLE
ITALIAN NORMS.
Date: March 2018
Architectural and Civil
Arch. M. Cantagallo
Ordine degli Architetti della Provincia di Frosinone
No.338
Mechanical Systems:
Ing. Pierluigi Chiarello Ordine degli Ingegneri della Provincia di Roma
No.24166, sez. A
Electrical Systems:
Ing. M. Ferrigno Ordine degli Ingegneri della Provincia di Roma
No.36957, sez. A
ASHE 18-1040
INDEX
SECTION PAGE No.
AC1 - SCOPE OF PROJECT AND APPLICABLE CONDITIONS 1-15
AF FORM 66 - SCHEDULE OF MATERIAL SUBMITTALS 16-22
REVISED MASTER SPECIFICATIONS 23-76
SCHEDULE OF WORK ITEMS 77-122
ASHE 18-1040 1
SECTION AC1
SCOPE OF PROJECT AND APPLICABLE CONDITIONS
AC1-01 SCOPE OF PROJECT: The Scope of this project is “RENOVATE HANGAR, BLDG 933, FOR HMU, AREA F, AVIANO AIR BASE, ITALY.
General: Building No. 933, Hangar 3, is located in Area "F" of the Aviano
Air Base. The architectural ensemble includes the main Hangar Bay, with sloped roof and annexes spaces with different slopes, heights, shapes and finishes as result of works performed in different periods to satisfy the various Users' needs during the years. Annexes spaces include the Old Civil
Terminal area and a Military Equipment Distribution Center, located in two warehouses in the west side of facility. The facility has a rectangular shape, overall dimensions are approximately 195.00 meters x 44.00 meters.
Hangar Bay has a steel metal structure and metal sloped roof, Civil
Terminal Area has a mixed structure of 30 cm thick masonry bearing walls, reinforced concrete and steel metal structure with flat and sloped roofs finished with sandwich panel covering.
Plans and sections of the building are shown on Project Drawings.
Scope of Work: The scope of work is the partial renovation of old Civil
Terminal area to allocate new offices, kitchen, breakroom, restrooms with lockers areas and storage areas for HMU Squadron and provide the west side annexes of the facility of a new sprinkler system in accordance with applicable norms. A relocation of the spaces will be provided including the construction of a 2m wide hallway to connect Hangar Bay with renovated areas.
Scope of work includes the upgrading of all the utilities (Electric/Fire
Alarm/HVAC/Communication) as necessary for the new layout of renovated areas.
Work to be performed includes but are not limited to the following items:
a. Architectural Work
Demolition and Removals:
- Demolition and removal of ceramic and rubber tile flooring and baseboard including removal of the setting bed, 5 centimeters minimum thickness;
- Demolition and removal of masonry and gypsum board partitions as necessary for the new layout of renovated areas;
- Demolition and removal of ceramic tile wall lining.
- Surveyed demolition of existing masonry/concrete wall for new passageway and doors opening.
- Partial demolition of existing reinforced concrete curb for door enlargement at hangar bay.
- Removal of interior doors including frame and all accessories, including patch-up wall of opening areas for new door installation;
- Removal of mineral fiber panel suspended ceilings, it includes the removal and store for subsequent reinstallation of suspended ceilings panels in areas involved in new sprinkler system installation.
ASHE 18-1040 2
- Removal of existing steel ladder for attic access;
- Demolition and removal of existing bathroom, including fixtures and plumbing system;
- Removal of existing kitchen furniture including all electrical equipment and fixtures;
- Removal of roof waterproofing membrane and thermal insulation panel installed over concrete flat roof including demolition and removal of existing sloping bed up to upper slab level.
- Sampling of rock wool batt installed over existing suspended ceiling panels.
New Works:
- Construction of hollow brick and gypsum board partition for new layout of renovated areas;
- Furnishing and installation of 30x30 cm ceramic tile floor finish.
Tiles shall be non-slip type.
- Furnishing and installation of 20x20 cm ceramic tile floor finish in toilet area. Tiles shall be non-slip type;
- Furnishing and installation of 15x15 cm high strength ceramic tile floor in new technical room at attic floor;
- Furnishing and installation of wall lining in toilet area with 20x20 cm ceramic tiles, height of wall finish shall be 220 cm;
- Furnishing and installation of new 600x600 mm, 15-17 mm thick mineral fiber panel, fireproof Class 1, soundproof suspended ceiling, complete with galvanized factory painted steel supporting frame.
- Reinstallation of previusly removed 60x60cm mineral fiber suspended ceiling panels to allow new sprinkler system installation, fire alarm and hvac system upgrading. Tt is estimated that 30% of the existing panels shall be replaced because damaged.
- Application of three coats of plaster finish, 1.5 cm minimum thickness to restore interior walls.
- Painting of interior wall surfaces with one coat of primer and two coats of latex paint including scraping of existing paint and sandpapering.
- Painting of exposed ceiling surfaces with one coat of primer and two coats of latex paint, including scraping of existing paint, and sandpapering.
- Furnishing and installation of steel/wood interior doors with scratch-proof plastic laminate finish, galvanized factory painted steel frame and sub-frame, same color as doors. Doors shall be complete with fixing hardware, sealing gaskets, accessories, lockset and cipher lock, where needed.
ASHE 18-1040 3
- Furnishing and installation of new kitchen furniture including appliances and exhaust hood.
- Furnishing and installation of new plastic laminate bathroom partition.
- Furnishing and installation of a new glvd steel ladder for access to new technical room at attic floor;
- Renovation of existing external doors and windows by replacing, where necessary, of gaskets, closing devices and framework put back.
- Upgrading of existing internal doors, by means the installation of ventilation grates.
- Civil prearrangement works for the installation of a new prefabricated sprinkler room. It includes the partial demolition of concrete curb and concrete paver and the construction of new concrete pad with sloped ramp and galvanized steel rail.
- Furnishing and installation of a new glvd steel canopy with sandwich panel roofing;
- Furnishing and installation of new roofing on flat roof area composed by new slooping bed, thermal insulation boards and waterproofing membrane;
- Construction of a fire resistant filter room between renovated areas and hangar bay.
- CPI (Fire Prevention Certificate) renewal to Pordenone Fire
Department;
b. Mechanical Work
Demolitions and Removals
Removal of existing boiler located on the roof level, piping, electrical connections and fittings
Removal of existing roof-top unit located on the roof level, ductwork, electrical connections and fittings
Removal of existing exhaust fan of ex-terminal area located on the roof level, ductwork, electrical connections and fittings
Removal of existing radiators supply pipework, valves and fittings at the ground floor
Removal of existing radiators and fittings
Removal of existing direct expansion units and fittings
Removal of existing roof-top ductwork at ground floor level, supply/return diffusers, grilles, exhaust air valves and fittings
ASHE 18-1040 4
Demolition and removal of existing plumbing system in existing toilets and kitchen at ground floor
Removal of parts of existing ductworks of AHU-1 at the roof level;
Remove of existing sprinkler system in Room 102, 103, 104 and 150.
New works - Hvac System
New heat pump unit (HPU-1 air source) complete of pump module and inertial tank including fittings. Heat rate 74.5 kW, cooling rate 59.8 kW.
New twin high efficiency circulators, No.1 (EP-1) fixed-speed for connection to existing hot manifold in fire suppression room, No.2 (EP-2, EP-3) variable frequency driven for new hydronic distribution system.
New mechanical room hot and chilled water distribution including piping, valves, control valves and fittings.
New DDC control system open BACnet protocol in accordance with UFGS 23 09
23.13 20-R, including controlled points, wiring, sensors, actuators, touch screen panel, DDC programming and graphics.
New HVAC pipework for new FCU, radiators and ERU.
New hot water main line from existing hot manifold in fire suppression room.
No.20 4-way cassette Fan coil units FCU-C including multilayer piping terminal connection to new main distribution pipework
No.1 wall mounted Fan coil unit FCU-W including multilayer piping terminal connection to new main distribution pipework
New fan coil control system including ambient temperature sensor, 2/3way modulating pressure independent control valves, shutoff valves, connection to control system of the building and fittings
New wall type direct expansion monosplit system
New aluminum radiators with thermostatic control valves and fittings
Reconnection of existing radiator located in bathroom close to entrance area to new hot pipework
No.2 new energy recovery ventilation units ErP2018 with EC Fans including
DDC controller, sensors, anti-freeze coils, heating/cooling coils, electrical connections, seismic bracing, supports and anchors and fittings.
New fresh/exhaust ductwork from ventilation units complete of ducts, insulation, silencers, supply grilles, return grilles, ventilation valves, mechanical flow regulators, transfer grilles, seismic bracing supports, anchors and fittings.
ASHE 18-1040 5
New stainless steel kitchenette hood
New PVC condensate drain pipework including supports and fittings
Modification of existing AHU-1 ductwork in order to install No.2 silencers
Testing and balancing of HVAC system.
New works - Plumbing system
New water softener WS1 and fittings
No.2 new chemical dosing pumps for DHW and make-up and fittings
New domestic hot water recirculation pump
New HVAC water make-up device and fittings
New domestic water treatment pipeline devices including self-cleaning micrometric filter, back flow preventers, pressure regulator valve, valves, pressure gauges, anchors bracing and fittings.
New Domestic hot water heat pump system DHWS-1.
New electronic 1-1/4” mixing valve.
New 2” galvanized steel water supply connection to existing building main water distribution
New plumbing system in male bathroom
New plumbing system in female bathroom
New plumbing system in male locker
New plumbing system in female locker
New plumbing system in kitchen
New plumbing system for janitor
Furnishing and installation of new emergency eyewash and shower
New toilet washbasins with faucet and fittings
New kitchen washbasin with faucet and fittings
New janitor sink with faucet and fittings
New toilet bowls with recessed water tank and fittings
New shower with faucet and fittings
ASHE 18-1040 6
New urinals and fittings
New HDPE sewage system connection for new toilets, lockers and other new fixtures including vent pipe, inspection manholes, connection to existing sewage water manhole.
Final test, cleaning and sanitizing of the entire domestic water system
New works - Sprinkler system
New fire cabinet including thermostat, temperature sensor, electric heater, sprinkler manifold, new 4” and 6” sprinkler control stations (wet pipe), OS&Y gate valves with tamper switch, connected to fire alarm system, and each other fittings and accessories required by UNI EN 12845 and NFPA 13;
New sprinkler system inside the building for warehouse area, office area and Rooms 102, 103, 104 and 105
Connection of new sprinkler systems to existing fire suppression manifold in hangar fire room including OS&Y gate valve
Seismic joints for sprinkler pipes at crossing entrance to the building and building seismic joints
Test and certification of new fire suppression systems
c. Electrical Work
Demolitions and Removals
Removal of the electrical, Telecomm and F/A system, and disposal to public dump, as indicated on the project drawings.
New Works
Furnishing and installation of new main distribution panel ground fault circuit breaker equipped (MDP). New MDP Panel will be feed by means of new cables from substation;
Furnishing and installation of new power outlets, and lighting system and removal and relocations of power and lighting systems, telecomm, only in the areas under structural/architectural repairs in the areas to be restored;
Furnishing and installation of new wiring system, TN-S type in accordance with CEI 64-8, feeding new distribution panel from MDP, with fire proof cables CPR type;
Furnishing and installation of new wiring system feeding new lighting fixtures, with fire proof cables CPR type;
Furnishing and installation of new wiring system feeding new outlets, with fire proof cables CPR type;
ASHE 18-1040 7
Furnishing and installation of new telecomm system, feed by the existing
Main Telecomm Rack, floor base mounted, for telecomm and data system telecomm outlets RJ 45 cat. 6 and UTP cat. 6 cables. The data cables will terminate in separate RJ45 type patch panels. New cat 6 telecomm cables will run in metal cable tray above suspended ceiling and in PVC conduits, only in the areas under structural/architectural repairs. The new system shall be connect from the existing, that shall be left in place;
Furnishing and installation of new smoke detectors. F/A detectors shall be provided only in the areas under structural/architectural repairs. The new system shall be connect to the existing F/A panel,that shall be left in place.
At the end of the electrical works, the entire system shall be tested in accordance with the CEI 64/8 and UNI 9795 and the “Dichiarazione di
Conformità” in accordance with the Decree No. 37/08 shall be provided.
AC1-02 TECHNICAL SPECIFICATION: The following Sections of the Master
Specifications for construction projects of the Air Base in Aviano (PN), Italy, dated November 2005 and applicable modifications, shall be applicable to the present project, together with the List of Work Items to be performed:
02579 PRECAST CONCRETE PAVING BLOCKS FOR SIDEWALKS
07214 BOARD INSULATION
08210 WOOD DOORS
10153 TOILET AND PARTITIONS
10800 TOILET AND BATH ACCESSORIES
15050 BASIC MECHANICAL MATERIALS AND METHODS
15080 INSULATION FOR MECHANICAL EQUIPMENT
15810 DUCTWORK AND DUCTWORK ACCESSORIES
15901 SPACE TEMPERATURE CONTROL SYSTEM
15950 HVAC TESTING/ADJUSTING/BALANCING
See Paragraphs AC1-23 and AC1-24 for the applicable specifications.
AC1-03 SUBMITTAL OF MATERIALS: In accordance with Paragraph 2.5 of the technical specification No. 01100/R, entitled “GENERAL CONDITIONS” of the
Master Specifications, the materials listed in AF Form 66 shall be submitted as required by the time schedule indicated, for the approval by the Contracting Officer’s Technical Representative.
The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials.
The number of copies will be as required on AF Form 66.
AC1-04 CONSTRUCTION AREA SCREENING: All construction sites and material storage areas shall be securely fenced around the entire perimeter within an area defined by the Contracting Officer’s Technical Representative.
Bilingual signs, "VIETATO L'INGRESSO - LAVORI IN CORSO / WORK AREA - NO
ENTRY" shall be placed at the work area entry and along each side of the fencing. Fence type, height, and screening color should also be specified by the Base Civil Engineering (BCE). Fencing shall be completely secured at top and bottom to prevent access. Fences shall be screened with opaque screening material to prevent visibility inside the fenced area. Fences and screens shall be adequately staked and/or anchored to prevent blowing over during high wind conditions. Contractor shall not start installation of area screening until approved, in writing, by BCE. Contractor shall submit photos or samples of the screening material for approval by BCE.
ASHE 18-1040 8
The Contractor shall replace or repair in a timely manner, as determined by
BCE, all fences and screening sections that have damage or develop unsightly rips or holes. At the end of the work or when exterior work requires it, temporary fencing shall be removed.
Night warning lights shall be installed to illuminate the work area, from sunset to dawn.
AC1-05 PROJECT SIGN: The Contractor shall furnish a project sign on site in accordance with Section 01101/R. The sign shall be made of a durable material and maintained in good condition. Lettering is to be white gloss, exterior-type enamel. The sign and posts shall be given one prime coat and two finish coats of dark brown gloss exterior enamel paint.
The sign shall be erected at the designated location and shall be maintained in good condition by the Contractor until completion of the contract. The sign shall remain the property of the Contractor and shall be removed from the site upon final inspection and acceptance of the facility. Contractor identification and logo shall be allowed only on this sign and nowhere else on the exterior of the job site, with the exception of company vehicles. There should be no signs for the purpose of advertising anywhere on the site. Contractors shall submit sign proposal to CE for approval.
AC1-06 JOB SITE MOBILIZATION: The Contractor shall submit a proposal to
BCE diagramming their construction site and all material storage areas in locations separate from a construction site. The Contractor shall submit this plan 14 calendar days prior to the start of construction. Material mobilization and construction execution can not begin until the plan has been approved by the base. Jobsite utility connections are the responsibility of the Contractor and shall be coordinated through BCE.
Temporary overhead utility runs are prohibited. Contractor shall include a plan for supplying required utilities to their site in their proposal.
AC1-07 SAFETY: Contractor shall provide barricades, traffic control signs and construction safety signs that meet installation standards and comply with all applicable laws. Actual location, size and final arrangement of these items shall be discussed and approved by the BCE prior to installation. Such approved items shall be of uniform size, design and color. All cones, barricades, warning lights, temporary signs and protective devices shall conform to the current host nation requirements and the U.S. Army Corps of Engineers Safety and Health Requirements Manual
EM 385-1-1.
AC1-08 HAZMAT/HAZWASTE HOUSEKEEPING: Prior to bringing any hazardous material into the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.
a. Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.
Contractor shall provide Sampling of rock-wool batt installed over existing suspended ceiling panels in order to ascertain their bio-persistence and breathability and the consequent dangerousness level and coordinate its removal and disposal in the appropriate manner in compliance with all applicable Italian norms.
b. Material Safety Data Sheets: The Contractor shall furnish English language versions of the Material Safety Data Sheets (MSDS) of
ASHE 18-1040 9
hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st CES/CEV for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the MSDS form to the Contractor.
c. Hazardous Waste Management Plan: The Contractor shall provide an hazardous waste management plan.
d. Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEV office.
e. Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers.
Relative data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEV through the Director of
Works.
f. Asbestos Containing Materials: There is no evidence of Asbestos containing materials.
Contractor shall notify immediately to the Contracting Officer if during demolition works asbestos containing materials will be encountered to coordinate its removal and disposal in the appropriate manner in compliance with all applicable Italian norms.
AC1-09 PRESERVATION OF EXISTING CONDITIONS: The Contractor shall preserve and protect all structures, equipment, and, where applicable, vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized by BCE to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound.
The Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the base.
AC1-10 WORK SITE CONDITIONS: The work areas shall be made available to the Contractor as follows:
a. Building interior area: Government personnel will remove furniture items prior commencement of the work.
b. Building Location: building 933 is located in area F and doesn’t require special access procedures, anyway Contractor shall strictly comply with the Contracting Officer’s instructions. The government will not be held liable for unproductive time and other related costs due to delays for unannounced suspension of work due to military operations and/or exercises or safety reasons. The government will only negotiate an equitable extension of the performance period based on documented delays and unannounced suspensions of work.
c. Administrative Containers: Containers required on site for administrative reasons (office space, conference space, break
ASHE 18-1040 10
room) must be in like new condition and painted a color which coordinates with the base architectural plan and is approved by
BCE, unless it is hidden by the opaque fencing material.
Administrative containers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the project site. A nameplate, no greater than 0.5 meters X 0.5 meters in size, shall be displayed on the exterior of all trailers which lists the name of the Contractor’s company, 24-hour
Contractor’s point(s) of contact (POC) and telephone number where they can be reached.
d. Material Storage: Storage containers will be in like new condition, and painted a color which coordinates with the base architectural plan and is approved by BCE, if it is not hidden by the opaque fencing material. Contractor shall display a nameplate on the exterior of all storage units with the name of the
Contractor’s company, the Contractor’s point(s) of contact (POC) and telephone number where they can be reached. Storage of materials at the work site is at the Contractor’s risk. The use of private security guards on a job site shall be coordinated with base Security Forces and approved by the installation commander.
The Contractor shall not use any area(s) for material or equipment storage that has not been approved by BCE.
e. Loading and Unloading of Construction Materials and Equipment:
Unloading of materials will be allowed within the fenced work area.
Contractor's personnel, vehicles and equipment must not obstruct access roads to other buildings.
Temporary parking of vehicles, for loading or unloading materials and equipment is permitted in the proximity of the work area;
unless such operations will obstruct traffic flow.
f. Housekeeping and Site Cleanup: At the end of each working day, the Contractor shall be responsible for cleaning the area inside and surrounding the building involved in the work.
Since the adjacent buildings are used every day, the Contractor shall provide that the surrounding areas are kept constantly clean and accessible, completely safe, and that the facilities are not in any way aesthetically damaged, even temporarily.
Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. Grass within the construction sites and material storage areas shall never exceed 10 cm in height. All rubbish and waste materials shall be placed in Contractor furnished containers. Contractors shall ensure all light weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield. During the laying of asphalt roads, streets and/or parking surfaces, areas soiled by residual asphalt shall be cleaned the same day.
AC1-11 AIRFIELD SAFETY TRAINING: Not Applicable
AC1-12 PARKING: Contractor or Contractor’s employees, including subcontractors, shall obey all traffic laws on installation.
The Contractor shall park all vehicles, including heavy equipment vehicles, only in unobtrusive locations within the fence line of the construction
ASHE 18-1040 11
site or laydown areas. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily observed by the public.
The Contractor shall not park outside the construction zone unless approved through BCE.
The Contractor shall clearly identify their vehicles through the use of company logos or signs on their vehicles.
AC1-13 ACCESS ROUTES: The Contractor shall provide a haul route plan for approval by BCE.
For road detour/closures the Contractor shall submit a written request to the Contracting Officer or his authorized representative for approval four weeks prior to his scheduled starting of work.
AC1-14 TRUCKING AND ROADS: Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered.
Fasten suitable cover, such as tarpaulin, over the load before entering surrounding streets. The Contractor is solely responsible for spillage from their vehicles and such spillage shall be cleaned up immediately. All roads shall be maintained free of debris at all times. The Contractor is responsible for ensuring all haul routes and site access areas are maintained in a clean and orderly fashion, free from mud, debris and clutter at all times. Special consideration must be given to haul routes that cross active taxiways. No amount of debris at these locations shall be tolerated. The Contractor shall sweep these areas continuously as long as material deliveries are being made.
AC1-15 NOISE CONTROL: The Contractor shall comply with all applicable country, local, and installation laws, ordinances, and regulations relative to noise control, to include applicable base quiet hours.
AC1-16 EXCAVATIONS: Every trench/excavation shall be returned to its original condition within ten days of the original excavation; this may be extended to 30 days if approved by the BCE. Contractor shall phase trenching and excavation operations in order to comply. At minimum, Contractor shall restore the site to pre-excavation conditions. All soil stockpiles shall be hidden from view to the maximum extent possible. Prior approval by BCE is required if soil stockpiles are to remain exposed for long periods of time. Dust control measures are the responsibility of the
Contractor and shall be implemented as directed by BCE. All road cuts must be approved by BCE prior to execution.
AC1-17 LAWN MAINTENANCE: If applicable, grassy areas disturbed by any type of construction work including storage, equipment staging, and material delivery areas shall be sodded, or hydro-seeded, where required by
BCE. Sodding, or seeding, damaged areas should be accomplished at the earliest planting season possible. Contractor shall be responsible for the successful growth and maintenance of all sodded, or seeded, areas under this contract for a period of thirty (30) days or three mowing after final acceptance of the work. All grass, shrubbery, and ornamental plants fenced by the construction site shall be maintained to base standards by the
Contractor.
AC1-18 LAWN ESTABLISHMENT:If applicable, within seven (7) workdays of actual completion of work at contract site, the Contractor shall prepare all disturbed areas inside and outside of the fenced site for sodding, or hydro-seeding, as provided in contract specifications. Contractor shall restore the site to a condition and appearance equal to or better than existing before the work occurred. Such restoration work will not be considered complete, and the facility not accepted, until approved by BCE.
ASHE 18-1040 12
Additionally, no seeding shall be authorized for lawn establishment, whether new, or for restoration purposes unless specifically authorized by
BCE.
AC1-19 CONSTRUCTION SITE RESTORATION: All Contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences, that are erected during construction, shall be removed entirely after completion of project and within five (5) days of
Government acceptance of the project site. The Contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equipment/storage units, residual construction materials shall be removed also within five
(5) days of Government acceptance of the project site.
AC1-20 PROCEDURES AND WORK PHASES: Prior to starting any work the contractor shall submit a Work Plan for approval by the Contracting Officer and user, in order to avoid interferences with user activities.
Renovation works shall start from room 102 in order to have tools storage/management availability as soon as possible.
AC1-21 SALVAGEABLE MATERIALS: In this contract are indicated materials and equipment to be removed, stored and subsequently reinstalled. It shall be the responsibility of the Contractor to remove salvageable items with maximum care to avoid any damages; and to transport them to the storage areas as indicated by the Contracting Officer’s Technical Representative.
It shall be the responsibility of the Contractor to provide containers for material disposal and/or transportation of the salvageable items. All discarded materials shall be transported to an authorized public dump site by the Regional and National Regulation according to the typology of the related material. Transportation of discarded materials shall be extended, to an authorized dump site, even if the dump site is located outside the authority limits of the Aviano City Council Territory.
AC1-22 CONSTRUCTION DRAWINGS: The following Construction Drawings complement this Technical Specification and are an integral part of the project documents:
DRAWING # SHEET # DESCRIPTION
GENERAL
1 of 50 T-1 PROJECT TITLE SHEET AND MAPS
2 of 50 T-2 LIST OF DRAWINGS & LEGENDS
ARCHITECTURAL
3 of 50 A-1 EXISTING CONDITION – GROUND FLOOR PLAN
4 of 50 A-2 EXISTING CONDITION – FIRST AND ROOF PLAN
5 of 50 A-3 EXISTING CONDITION – DEMOLITION PLAN
6 of 50 A-4 EXISTING CONDITION - ATTIC AND ROOF DEMOLITION PLAN
7 of 50 A-5 EXISTING CONDITION – SUSPENDED CEILING PLAN
8 of 50 A-6 NEW CONDITION - GROUND FLOOR PLAN AND SCHEDULES
9 of 50 A-7 NEW CONDITION – SECTION AND DETAILS
10 of 50 A-8 NEW CONDITION - SUSPENDED CEILING PLAN
11 of 50 A-9 NEW CONDITION - DOOR SCHEDULE AND DETAILS
12 of 50 A-10 NEW CONDITION - WALL SCHEDULE AND DETAILS
13 of 50 A-11 NEW CONDITION - TOILET ENLARGED PLAN 1/2
14 of 50 A-12 NEW CONDITION - TOILET ENLARGED PLAN 2/2
15 of 50 A-13 NEW CONDITION - DETAILS
ASHE 18-1040 13
16 of 50 A-14 NEW CONDITION - DETAILS
17 of 50 A-15 NEW CONDITION - DETAILS
MECHANICAL
18 of 50 M-1 EXISTING CONDITIONS - MECH. SYST. - GROUND FLOOR PLAN
19 of 50 M-2 EXISTING CONDITIONS - MECH. SYST. - FIRST FLOOR AND
ROOF PLAN
20 of 50 M-3 NEW CONDITIONS - HVAC - GROUND FLOOR PLAN DUCTWORK
21 of 50 M-4 NEW CONDITIONS - HVAC - MECH ROOM, PLANS & SECTIONS
22 of 50 M-5 NEW CONDITIONS - HVAC - GROUND FLOOR PLAN PIPEWORK
23 of 50 M-6 NEW CONDITIONS - HVAC - MEC ROOM & ROOF PLAN PIPEWORK
24 of 50 M-7 NEW CONDITIONS - MECHANICAL SYSTEMS - DIAGRAMS
25 of 50 M-8 NEW CONDITIONS - PLUMBING - GROUND FLOOR PLAN
26 of 50 M-9 NEW CONDITIONS - SPRINKLER – ROOF CEILING LEVEL
27 of 50 M-10 NEW CONDITIONS - SPRINKLER - OFFICES PROTECTION
28 of 50 M-11 NEW CONDITIONS - SPRINKLER - SCHEDULES & DETAILS
29 of 50 M-12 NEW CONDITIONS - MECHANICAL SYSTEMS - SCHEDULES
30 of 50 M-13 NEW CONDITIONS - MECHANICAL SYSTEMS - FCU SCHEDULES
ELECTRICAL
31 of 50 E-1 ELECTRICAL SYSTEM LEGEND
32 of 50 E-2 EXISTING CONDITIONS - POWER PLANS
33 of 50 E-3 EXISTING CONDITIONS - LIGHTING PLANS
34 of 50 E-4 EXISTING CONDITION - COMMUNICATION PLAN
35 of 50 E-5 EXISTING CONDITION - FIRE ALARM PLANS
36 of 50 E-6 EXISTING CONDITION - MDP PANEL SCHEMATIC DIAGRAM 1/2
37 of 50 E-7 EXISTING CONDITION - MDP PANEL SCHEMATIC DIAGRAM 1/2
38 of 50 E-8 EXISTING CONDITION - FIRE ALARM BLOCK DIAGRAM
39 of 50 E-9 NEW CONDITIONS - CABLE TRAYS LAYOUT
40 of 50 E-10 NEW CONDITIONS - POWER PLANS
41 of 50 E-11 NEW CONDITIONS - POWER PLANS FOR MECHANICAL EQUIPMENT
42 of 50 E-12 NEW CONDITIONS - LIGHTING SYSTEM PLANS
43 of 50 E-13 NEW CONDITIONS - COMMUNICATION SYSTEM PLANS
44 of 50 E-14 NEW CONDITIONS - FIRE ALARM PLANS
45 of 50 E-15 NEW CONDITION - MDP PANEL SCHEMATIC DIAGRAM 1/2
46 of 50 E-16 NEW CONDITION - MDP PANEL SCHEMATIC DIAGRAM 2/2
47 of 50 E-17 NEW CONDITION - MECHANICAL AND SPRINKER PANEL
SCHEMATIC DIAGRAMS
48 of 50 E-18 NEW CONDITION - FIRE ALARM BLOCK DIAGRAM
49 of 50 E-19 ELECTRICAL DETAILS
45 of 50 E-20 ELECTRICAL DETAILS
AC1-23 ADDITIONAL SPECIFICATIONS: In addition to the Norms and
Specifications contained in the Master Specifications as noted in Section
AC1-02 of these Technical Specifications, the following Additional
Specifications shall apply to this project:
UFGS-23 09 23.13 20 BACNET DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
AC1-24 REVISED MASTER SPECIFICATIONS: In addition to the Norms and
Specifications contained in the Master Specifications as noted in Section
AC1-02 of these Technical Specifications, the following Revised Master
Specifications shall apply to this project
01100/R GENERAL CONDITIONS
01101/R PROJECT SIGN
03300/R CAST IN PLACE CONCRETE
ASHE 18-1040 14
04200/R MASONRY
05120/R STRUCTURAL STEEL
07231/R WALL INSULATION
08110/R STEEL DOORS AND STEEL FRAMES
08120/R ALUMINUM DOORS AND FRAMES
09220/R INTERIOR PLASTER
09250/R GYPSUM AND CEMENT BOARD
09310/R CERAMIC AND STONE COMPOSITE TILE
09510/R ACOUSTICAL CEILING
09900/R PAINTS AND COATINGS
13855/R ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM
13930/R WET PIPE FIRE SUPPRESSION SPRINKLER
15070/R MECHANICAL SOUND, VIBRATION AND SEISMIC CONTROL
15400/R PLUMBING
15601/R CENTRAL REFRIGERATION EQUIPMENT FOR AIR CONDITIONING
15720/R AIR HANDLING AND DISTRIBUTION EQUIPMENT
16050/R BASIC ELECTRICAL MATERIALS AND METHODS
16316/R SWITCHBOARDS
16402/R INTERIOR DISTRIBUTION SYSTEM
16510/R INTERIOR LIGHTING
16710/R STRUCTURED TELECOMMUNICATIONS CABLING AND PATHWAY SYSTEM
AC1-25 ADDITIONAL NORMS AND STANDARDS: Furthermore the works included in this project shall be in accordance, when applicable, with the NFPA, ASTM, UL, HANDBOOKS, Norms and Standards, whose manuals and regulations are available for review at the Contracting Officer.
AC1-26 FINAL ACCEPTANCE TEST & CERTIFICATIONS AND OTHER REQUIREMENTS:
a. Once issued NTP, Contractor is required to contact CEAOR (phone
0434-305691) and schedule a meeting to fill Form DD1354 with appropriate project data for real property capitalization (DD1354 and category codes list CATCODE_LIST_2010 are available in engineering office during normal hour of operations). Contractor is required to provide final Form DD1354 for 31CES/CD signature before contract close out;
b. All installed new mechanical and electrical equipment, components and machines shall have the required Italian Mark of Quality and shall conform to Machines Directive no. 2006/42 CE dated 17 May
2006 and provided with "C.E." mark; and three copies of relevant certificates shall be furnished to the Contracting Officer for each item of equipment installed. Furthermore the electric equipment shall be in compliance with the Legislative Decree No.
81/08 and subsequent modifications which apply the Directive
93/68/CEE. Electrical tests shall comply with Low 37/08 and CEI
64/8 Norm.
c. At the end of the work, the Contractor shall provide the
Government with three paper and digital copies of the following documents:
1. Certificate of Compliance with Law No. 37/08, for the installation of the electrical and mechanical systems in a workmanlike manner, signed by the Contractor.
2. Final Acceptance Test Certifications for electrical and mechanical systems signed by a Registered Engineer to be selected from three candidates proposed by the Contractor to
ASHE 18-1040 15
the Contracting Officer.
3. Operation and Maintenance Manuals according to UFGS 01 78 00, “Closeout Submittals”, para. 3.7.
4. Warranty: a detailed list of all parts installed shall be provided. As minimum the following information shall be included:
Brief description of the part/piece of equipment;
Manufacturer and model;
Serial number or ID;
Building-Floor-Room where the item is installed;
Point of Contact for Warranty call (Name, phone, mail);
Alternatively, the Warranty Management Plan as per UFGS 01 78
00 “Closeout Submittals”, para. 1.7.1 shall be provided
5. System Booklet as per DPR 74/2013 to be provided after system installation/modification.
AFForm 66, OCT 89
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
PROJECT TITLE
RENOVATE HANGAR 3, BLDG 933 FOR HMU – AREA F
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
D A
T E
R E
C E
IV
E
IN
C
O N
T R
A C
T
G
T E
T O
C
IV
IL
N
G
IN
E E
R
T U
R N
S U
S P
E N
S
U
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
L
LI
E
N U
M B
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
F
M
P
LI
A N
H
O P
D R
A W
M P
LE
LO
R
S E
LE
C
T
IO
M
N U
F A
C T
U R
E
’S
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
W
R R
A N
Y
T A
LO
G
D A
P
E R
A T
IN
G
I N
S T
R U
C T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
DATE CONTRACTOR
NOTIFIED REMARKS
APPROVED DIS-
APPROVED
PART II a
ARCHITECTURAL WORK
Material Safety Data Sheets (MSDS)
1 Gypsum Board partitions Part IIa Item 1
3 3 3 30
3 Floor Ceramic Tile Part IIa Item 3, 4, 5
1 3 3 3 30
Wall Ceramic Tile
Part IIa Item 6
1 3 3 3 30
5 Mineral Fiber Suspended Ceiling Part IIa Item 8, 9
1 3 3 30
6 Interior Doors Part IIa Item 11, 12, 13
3 3 3 3 30
7 Latex Paint for Interior Surfaces Part IIa Item 14, 15
3 3 30
8 Kitchen Furniture Part IIa Item 16
3 3 3 3 3 30
9 Toilet Partitions
Part IIa Item 19
3 3 3 3 3 30
9 Metal Canopy Part IIa Item 21
3 1 3 3 30
10 Metal Stair
Part IIa Item 22
3 1
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N
T R
A C
T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
E
N U
M B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M
P
LI
A N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
I N
S T
R U
C T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
11 Roof waterproofing Part IIa Item 23
3 3 3 3 30
12 Filter Room Part IIa Item 25, a, b, c ,d, e
3 1 3 3 3 30
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N
T R
A C
T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
E
N U
M B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M
P
LI
A N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
I N
S T
R U
C T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
PART III – MECHANICAL WORKS
1 ERU ventilation unit Part IIIa Item 14
3 3 3 3 3 3 30
2 Air ducts and fittings Part IIIa Items 15,18
3 3 3 3 30
3 Chiller / Heat pump unit
Part IIIa Item 1
3 3 3 3 3 3 30
4 Electric pumps Part IIIa Item 2, 3
3 3 3 3 3 3 30
5 Air insulation with aluminium jacket where needed Part IIIa Items 15,18
3 3 3 3 30
6 Silencers
Part IIIa Items 15
3 3 3 3 30
7 Air regulators Part IIIa Items 15
3 3 3 3 3 30
8 Grilles and diffusers Part IIIa Items 15
3 3 3 30
9 DX monosplit unit Part IIIa Item 11
3 3 3 3 3 30
10 Fancoils Part IIIa Item 8, 9
3 3 3 3 3 30
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N
T R
A C
T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
E
N U
M B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M
P
LI
A N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
I N
S T
R U
C T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
11 Condensate piping & fittings Part IIIa Items 17
3 3 3 3 3 30
12 DDC control system, inverter ed accessory Part IIIa Items 5, 10
3 3 3 3 3 3 30
13 Hot/chilled water piping Part IIIa Items 4, 6, 7, 13
3 3 3 30
14 Pipe insulation Part IIIa Items 4, 6, 7, 13
3 3 3 30
15 Pipe aluminum jacket or equivalent
Part IIIa Items 4, 6, 7
3 3 3 30
16 Seismic bracing and support Part IIIa Items 1, 2, 3, 4, 6, 7, 13, 15
3 3 3 3 3 3 3 30
17 Valves: ball, butterfly. Check, filter, joint, vent Part IIIa Items 4, 6, 7, 10, 12, 13
3 3 3 30
18 Heating radiator
Part IIIa Items 12
3 3 3 3 3 30
19 Kitchen hood Part IIIa Items 16
3 3 3 3 30
20 Water softener and accessories Part IIIb Item 1
3 3 3 3 3 30
21 Chemical dosing pump Part IIIb Item 2
3 3 3 3 3 30
22 Domestic water heater Part IIIb Item 6
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N
T R
A C
T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
E
N U
M B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M
P
LI
A N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
I N
S T
R U
C T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
23 Electronic mixing valve Part IIIb Item 7
3 3 3 3 3 30
24 Domestic water piping Part IIIb Items 3, 4, 5, 8, 9, 10, 11, 12, 13, 14, 15
3 3 3 30
25 Pipe insulation
Part IIIb Items 4, 5, 8, 9, 10, 11, 12, 13, 14, 15
3 3 3 30
26 Pipe aluminum jacket or equivalent
Part IIIb Items 4, 5, 8, 9, 10, 11, 12, 13, 14, 15
3 3 3 30
27 Sanitary fixture, faucet and fittings Part IIIb Item 16, 17, 18, 19, 20, 21
3 3 3 3 3 30
28 Emergency eyewash/shower Part IIIb Item 15
3 3 3 3 3 30
29 Electric Domestic hot water pump
Part IIIb Item 3
30 Valves: ball, butterfly. Check, filter, joint, Part IIIb Items 4, 5, 7, 9, 10, 11, 12, 13,14, 3 3 3 30
31 Drain / sewer piping & fittings Part IIIb Items 9,10, 11, 12, 13, 14, 15, 22
3 3 3 3 3 30
32 Seismic bracing and support
Part IIIb Item 3, 4, 5, 8, 9, 10, 11, 12, 13, 14, 15
3 3 3 3 3 3 3 3 30
33 Sprinkler cabinet, valves, bfp, filter etc Part IIIc Item 1
3 3 3 3 3 3 3 30
34 Pipe UNI EN10255 / UNI EN 10216 Part IIIc Item 1, 2, 3
3 3 3 30
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N
T R
A C
T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
E
N U
M B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M
P
LI
A N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
I N
S T
R U
C T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
35 Wet pipe sprinkler valve Part IIIc Item 1
3 3 3 3 3 3 30
36 Sprinkler head and system Part IIIb Item 2
3 3 3 3 3 3 3 30
37 Seismic bracing and support Part IIIc Item 1,2,3
3 3 3 3 3 3 3 3 30
38 Seismic joints Part IIIc Item 4
3 3 3 3 3 3 3 3 30
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N
T R
A C
T
T E
T O
C
G
IN
E E
R
T U
R N
S U
S P
E N
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
E
N U
M B
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M
P
LI
A N
O P
D R
A W
M P
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
R R
A N
T A
LO
G
D A
E R
A T
IN
G
I N
S T
R U
C T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
PART IV – ELECTRICAL WORKS
1 Electrical Panel Part IVa Item 1
3 3 3 3 3 30
2 Electrical Lines Part IVa Item 2, 7, 8
3 3 3 3 3 30
3 Power Outlets
Part IVa Items 3, 4, 5, 6
3 3 3 3 3 30 3 3 3 3 30
4 Electrical system tests Part IV Item 9
3 30
5 Lighting System Part IVb Items 10, 11, 12, 13, 14, 15
3 3 3 3 3 30
6 Telecomm System Part IVc Items 16, 17, 18,19,20
3 3 3 3 3 30
7 Fire Alarm System Part IVd Item 21, 22, 23 , 24
REVISED SPECIFICATIONS
SPECIFICATIONS INDEX
SECTION 01100/R GENERAL CONDITIONS
SECTION 01101/R PROJECT SIGN
SECTION 03300/R CAST-IN-PLACE CONCRETE
SECTION 04200/R MASONRY
SECTION 05120/R STRUCTURAL STEEL
SECTION 07231/R WALL INSULATION
SECTION 08110/R STEEL DOORS AND STEEL FRAMES
SECTION 08120/R ALUMINUM DOORS, FRAMES AND SIDELIGHTS
SECTION 09220/R INTERIOR PLASTER
SECTION 09250/R GYPSUM AND CEMENT BOARD
SECTION 09310/R CERAMIC AND STONE COMPOSITE TILE
SECTION 09510/R ACOUSTICAL CEILING
SECTION 09900/R PAINTS AND COATINGS
SECTION 13855/R ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM
SECTION 13930/R WET PIPE FIRE SUPPRESSION SPRINKLERS
SECTION 15070/R MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
SECTION 15400/R PLUMBING
SECTION 15601/R CENTRAL REFRIGERATION EQUIPMENT FOR AIR CONDITIONING
SECTION 15720/R AIR HANDLING AND DISTRIBUTION EQUIPMENT
SECTION 16050/R BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 16316/R SWITCHBOARDS
SECTION 16402/R INTERIOR DISTRIBUTION SYSTEMS
SECTION 16510/R INTERIOR LIGHTING
SECTION 16710/R STRUCTURED TELECOMMUNICATIONS CABLING AND PATHWAY SYSTEM . 75
Section 01100/R 25
SECTION 01100/R
GENERAL CONDITIONS
PART 1 – APPLICABLE NORMS
Paragraph 1.1:
Delete:
a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system and electrical system.
Add:
a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system, fire protection system and electrical system.
c. Legislative Decree No. 494 dated 14 August 1996.
d. Legislative Decree No. 528 dated 19 November 1999.
c. Legislative Decree No. 81 dated 9 April 2008.
Paragraph 1.2.2
Replace “Law No. 46 dated 5 March 1990” with “Ministerial Decree 37/2007
Paragraph 1.2.3
a. Certificate of compliance for electrical systems in accordance with
CEI regulations and with D.P.R. No.547 dated 27 April 1955 on accident prevention.
a. Certificate of approval of the grounding and lightning protection systems, in accordance to CEI Norms and D.P.R. No. 462/01.
Revise Paragraph "3.2 UTILITY CUT-OFF" as follows:
Delete "ten (10) days" and insert "three (3) weeks".
-- End of Section --
Section 01101/R 26
SECTION 01101/R
PROJECT SIGN
PART 1 - PROJECT SIGN
1.1 Scope
Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.
PART 2 - GENERAL
The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the
Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site.
The sign shall contain the following information in English:
a. Project No.
b. Project description
c. Constructed under Supervision of Base Civil Engineering
d. Contracted by 31st Contracting Squadron
e. Contractor
f. Design Engineer
g. Inspector
h. Contract Management: 31 CONS Construction Flight
i. ERP Coordinates
Lettering of the sign will be as shown on the following sketch, and may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.
Section 01101/R 27
-- End of Section –-
Section 03300/R 28
SECTION 03300/R
CAST-IN-PLACE CONCRETE
Ministerial Decree dated 9 Jan 1996 Technical Norms for the Calculations, Execution and Testing of Normal and
Prestressed Reinforced Concrete Structures and Metal Structures.
dated 16 Jan 1996 Technical Norms for Constructions in
Seismic Zone.
dated 14 Feb 1992 Technical Norms for the Calculations, Execution and testing of Normal and
Prestressed Reinforced Concrete Structures and metal Structures.
dated 16 Jan 1996 Technical Norms for Safety Test of the
Constructions, Load, and Live Loads.
Ministerial Circular No.65 dated 10 Apr 1997 Instruction for the application of
“Technical Norms for Constructions in
Seismic Zones” dated 16 Jan 1996”.
National Research Council
(CNR-UNI)Publication No.
10011/88 Steel structures; instruction for calculation, execution, testing, and maintenance.
dated 20 March 2003, No. 3274 “First Elements in Matter of General
Criteria for Seismic Classification of
National Territory and of Technical
Regulations for Construction in Seismic
Zone”.
dated 14 January 2008: “Technical Norms for Constructions”.
UNI EN 10002-1 (1992)Metallic Materials. Tensile Testing.
Method of Test (At Ambient Temperature).
Section 03300/R 29
UNI ENV 10080 (1997) Steel for the Reinforcement of
Concrete. Weldable Ribbed Reinforcing
Steel B500. Technical Delivery Conditions for Bars, Coils and Welded Fabric.
UNI EN 934-2 (2002) Admixtures for Concrete, Mortar and
Grout. Concrete Admixtures. Definitions, Requirements, Conformity, Marking and
Labeling.
UNI EN 206-1 (2001) Concrete. Specification, Performance, Production and Conformity.
UNI 8520 (1999)Aggregates for Concrete Mixes.
Definition, Classification and Properties.
UNI EN 10002-1 (2004)Metallic Materials. Tensile Testing.
Part 1: Method of Test at Ambient
Temperature.
UNI ENV 10080 (2005) Steel for the Reinforcement of
Concrete. Weldable Ribbed Reinforcing
UNI EN 934-2 (2007) Admixtures for Concrete, Mortar and
Grout. Part 2: Concrete Admixtures.
Definitions, Requirements, Conformity, Marking and Labeling.
UNI EN 206-1 (2006) Concrete. Part 1: Specification, Performance, Production and Conformity.
UNI 8520-1 (2005)Aggregates for Concrete.
Additional…