COST ESTIMATE BREAKDOWN

View the file

Other files

File Type Posted
ASJD_18-1015_Technical_Specifications.pdf PDF
FA5682-17-R-0039_SOLICITATION.pdf PDF
172_Roof_Plan.pdf PDF
ADDITIONAL_REQUIREMENTS_June17.pdf PDF
MasterSpecifications.pdf PDF
ASJD_18-1015_PHOTO_ALBUM.pdf PDF
ASJD_18-1015_Submittals.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

ASJD 18-1015

CONSTRUCTION COST ESTIMATE BREAKDOWNPAGE 1 OF1
SUSTAIN ROOF, FACILITY 172
PURCHASE REQ. NO.Project ASJD 18-1015WORK LOCATION : AREA A1, AVIANO AIR BASE
LineITEMUnitQuant.Material cost
no.ofUnitTotalManAverageTotalLine total
me.Hoursrate
5.1Removal and disposal of existing clay tiles and membrane on the pitched roof, including metal flashingSM/MQ
5.2Removal and re-installation of lightning protection system, including new support and insulators for the pitched roofLS/AC
5.3Furnish and installation of new insulating panels, 8 cm thick, type ISOTEC XL PLUS, including vapor barrier and accessoriesSM/MQ
5.4Furnish and installation of new metal flashing, 8/10 thickness, development 60 cm and perimeter wooden joist 10x10 cm dim.LM/ML
5.5Furnish and installation of new "PORTOGHESE" clay tiles roofSM/MQ
5.6Furnish and installation of bituminous membrane, 4 mm thick,SM/MQ
5.7Furnish and installation of fluoropolymer based paint to create "cool roof effect ", primer and two coats of 0.200 Kg/mq for coatSM/MQ
5.8Furnish and installation of two vertical steel fixed ladders with cages and landing platformsLS/AC
5.9Furnish and installation of fall protection life lines for flat and pitched roofsLS/AC
5.10Anti-fall protection and lifting equipmentLS/AC
Total Cost€ 0.00

Sheet1

FOR GOVERNMENT USE ONLY
SABER PROJECT GOVERNMENT CONSTRUCTION COST ESTIMATE BREAKDOWNPAGE 1 OF
CONTRACT FOR
PURCHASE REQ. NO.SABER PROJECT #WORK LOCATION
LineUPBITEMUnitQuant.Material cost
no.CODEofUnitc.TotalManAveragec.TotalLine total
me.Hoursrate
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000

Sheet3

File details come from the government source that posted it. Updated .