FA568217R0021_0001.pdf
PDF 41 KB Posted
- Solicitation number
- FA568217R0021
About this file
FA568217R0021 AMENDMENT 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UUUY_16-1059_Rev_1_SUSTAIN_PERIMETER_FENCE_SAN_VITO.pdf | ||
| GENERAL_LAYOUT_Rev1.pdf | ||
| UUUY_16-1059_Blank_Cost_Estimate_SAN_VITO_REV_1.xlsx | XLSX spreadsheet | |
| UUUY_16-1059_Blank_Cost_Estimate_SAN_VITO.xls | XLS spreadsheet | |
| Attachment_A_ExperienceOverviewSheet.docx | DOCX document | |
| ADDITIONAL_REQUIREMENTS_May_2017.pdf | ||
| Attachment_B_ExperienceInformationSheet.docx | DOCX document | |
| FA568217R0021.pdf | ||
| UUUY_16-1059_Tech_Specs._SUSTAIN_PERIMETER_FENCE,_SAN_VITO.pdf | ||
| GENERAL_LAYOUT.pdf | ||
| Applicable_Sections_of_Master_Specifications.pdf | ||
| FENCE_AND_GATES_DETAILS.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1F3A27086A001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make changes as indicated below and in the follow ing pages:
Section A/SF1442 Block 13A: change closing date for receipt of offers;
Section A/SF1442 Block 13D: change the number of days for Government acceptance of offers;
Section B/extended description of Item 0001 and Section J/Attachment 1: Replace Technical Specif ications w ith Technical Specif ications Rev 1 dated June 2017 and replace Draw ing C-1 w ith C-1 Rev 1 Section L, Provisions 52.215-20 & L-01 Proposal Preparation Instructions, paragraphs (b) and (d): replace Construction Cost Estimate Breakdow n
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568217R0021
X 9B. DATED (SEE ITEM 11)
25-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jun-2017
CODE
31 CONS LGC - FA5682
VIA PORDENONE 89/B, AREA "E" EDIF. 600
BASE AEREA DI AVIANO
AVIANO (PN) 33081
FA5682 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA568217R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 26-Jun-2017 04:00 PM to 28-Jun-2017 04:00 PM.
The offeror acceptance period has decreased by 2 from 96 to 94.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,
SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN
LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND
CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED
IN SECTION J HEREIN: A. TECHNICAL SPECIFICATIONS FOR UUUY 16-1059 SUSTAIN PERIMETER FENCE, SAN VITO DEI NORMANNI, BRINDISI, ITALYB. ADDITIONAL REQUIREMENTS DATED MAY
To:
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,
SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN
LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND
CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED
IN SECTION J HEREIN: A. TECHNICAL SPECIFICATIONS FOR UUUY 16-1059 SUSTAIN PERIMETER FENCE, SAN VITO DEI NORMANNI, BRINDISI, ITALY - REVISION #1B. ADDITIONAL REQUIREMENTS
DATED MAY 2017
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS
The following documents are an integral part of this contract:
a. Attachment 1:
Technical Specifications for Project UUUY 16-1059 SUSTAIN PERIMETER FENCE, SAN VITO DEI NORMANNI, BRINDISI, ITALY – Revision#1
- 68 pages including cover page and applicable sections of the Master Technical Specifications
b. Attachment 2:
Drawings C-1 Rev 1 and C-2
- 2 sheets
c. Attachment 3:
Additional Requirements, dated May 2017
- 3 pages
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
L-01. PROPOSAL PREPARATION INSTRUCTIONS
A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.
Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors.
Failure to meet a requirement may result in an offer being ineligible for award.
In order to be determined responsive an offeror must submit all documentation to demonstrate the following:
1. Acknowledgement of compliance with all solicitation terms and conditions.
2. Acknowledgement of all solicitation amendments
3. Current Societa’ Organismi di Attestazione (SOA) certification for category OG01 as well as classification adequate to cover offeror’s proposed amount for project performance.
4. Current Documento Unico di Regolarita’ Contributiva (DURC) certifying the payment of host social security benefits. This document must not be older than 120 days from date of proposal.
B. In addition to the requirements outlined above required to determine responsiveness of prospective offerors, the proposal shall consist of two additional separate parts;
Part I - Price Part II – Technical Experience
C. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional data will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit cost data to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
D. Specific Instructions:
1. PART I – PRICE PROPOSAL
The offeror shall provide a price breakdown for the project in accordance with the Construction Cost Estimate Breakdown form sample provided. Proposed amounts shall be limited to 2 digits after the decimal. All prices shall be submitted in EURO currency. Offers not submitted in EURO currency will not be considered for award. Offers shall be complete, accurate, and sufficiently detailed to demonstrate a clear understanding of the requirement, and be consistent with the offeror’s technical proposal. The burden of proof for credibility of proposed pricing rests with the offeror.
1.1. Contract Documents.
In addition, the offeror’s proposal shall include the following sections from the solicitation in the Price factor:
https://cs.eis.af.mil/airforcecontracting/knowledge_center/Documents/AFFARS_Library/5315/templates/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/Content.Outlook/far/FAR15.DOC#b154062
(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the RFP Section A, SF1442. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.
(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate breakdown Revision #1 form. The extended amount must equal the whole Euro unit price multiplied by the number of units.
(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J Attachment 4 “Additional Requirements”.
(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate breakdown Revision #1 shall be returned in their entirety.
2. PART II – TECHNICAL EXPERIENCE - Limited to no more than 12 pages (excluding Government released documents which are not subject to any page limitation restriction). Submit original only.
Offerors shall submit two (2) attachments:
Experience Overview Sheet, Attachment A and Experience Information Sheet, Attachment B, detailing previous work experience (projects) meeting the requirements of this solicitation. Information for completing Attachment A and B are as follows:
a. Offerors shall complete an Experience Overview Sheet, Attachment A, with a total listing of at least two (2), but not-to-exceed five (5) projects performed within the last five (5) years or currently being performed and at least 50% complete, that best represent the Offeror’s work experience required on this solicitation. If more than five (5) projects are submitted, only the first five (5) projects will be evaluated.
b. Offerors shall provide an Experience Information Sheet, Attachment B, for each project listed on Experience Overview Sheet, Attachment A. All Experience Overview and Information Sheets must be filled out completely.
The information provided in the Experience Information Sheets will be used to evaluate each Offeror’s experience to this requirement. Offerors are responsible for providing project descriptions in sufficient detail to demonstrate a level of experience in efforts involving requirements that are similar or greater in scope, magnitude and complexity as the effort described in this solicitation.
Projects provided for experience must demonstrate experience in performance in Italy or the EU.
Each project submitted shall have a value similar or greater than offeror’s proposed amount, and be of similar complexity/scope of the project in this solicitation. Offerors may submit larger scope contracts if there is a scope of work within the larger project that is similar to this procurement with a separately measurable performance period and measureable monetary value. Offerors shall clearly describe the project and how it related to the overall contract.
E. Documents submitted in response to this RFP must be fully responsive to and consistent with the following:
1. Requirements of the RFP (CLINs & PWS) and government standards and regulations pertaining to the PWS.
2. Evaluation Factors for Award in Section M of this RFP.
3. Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this
Section L will not be read or evaluated, and will be removed from the proposal.
4. Format for proposal Parts I and III shall be as follows:
(a) The proposals will be no bigger than A4 size paper except for fold-outs used for charts, tables, or diagrams, which may not exceed A3 size paper.
(b) A page is defined as one face of a sheet of paper containing information.
(c) Typing shall not be less than 12 pitch.
(d) Elaborate formats, bindings or color presentations are not desired or required.
52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR INFORMATION OTHER
http://www.gsa.gov/Portal/gsa/ep/formslibrary.do?viewType=DETAIL&formId=4E179AB32AF6652285256A260054D101
THAN CERTIFIED COST OR PRICING DATA (OCT 2010)—ALTERNATE IV (OCT 2010)
(a) Submission of certified cost or pricing data is not required.
(b) Provide data described below:
COMPLETED CONSTRUCTION COST ESTIMATE BREAKDOWN – Revision #1
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .