Construction Cost Estimate Breakdown Revision 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5682-16-R-0018_ADDITIONAL_REQUIREMENTS.pdf | ||
| 04_1602_Technical_Specifications_Revision_1.pdf | ||
| 01_1602_Drawing_A1_Revision_1.pdf | ||
| solicitation.pdf | ||
| ASHE_16-1036_DWGS_A1.pdf | ||
| 2_1602_Const_CostEstimate_100__MDT.xls | XLS spreadsheet | |
| ASHE_16-1036_Tech_Specs_MDT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A - New Construction
| CONSTRUCTION COST ESTIMATE BREAKDOWN - Revision 1 | |||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||
| RENOVATE FAC. 1379 FOR 606 ACS BED DOWN | |||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||||
| ASHE 16-1036 | AREA F, AVIANO AIR BASE, ITALY | ||||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||||
| A. | NEW CONSTRUCTION WORKS / Lavori di Nuova Costruzione | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||||||||||||
| Ia Architectural - Ia Architettura | 0.00 | 0.00 | 0.00 | ||||||||||
| 1 | DEMOLITION OF GYPSUM BOARD PARTITIONS | ||||||||||||
| Demolizione di tramezzi in cartongesso | IT. No. Art. n. | 1 | SM/MQ | 0.00 | 0 | 0 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 2 | REMOVAL OF OF 60x60cm SUSPENDED CEILING | ||||||||||||
| Rimozione controsoffitto in pannelli 60X60cm | IT. No. Art. n. | 2 | SM/MQ | 0.00 | 0 | 0 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| Total Architectural - Totale Architettonici | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||
| TOTAL PART I - Totale Parte I | 0.00 | 0.00 | 0.00 | ||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | |||||||||||||
| IIa Architectural - IIa Architettonico | |||||||||||||
| 1 | CONSTRUCTION OF INSULATED GYPSUM BOARD PARTITIONS | ||||||||||||
| Costruzione di tramezzi in cartongesso isolati | IT. No. Art. n. | 1 | SM/MQ | ||||||||||
| 2 | BLOCK-UP OF EXISTING DOOR SPACING | ||||||||||||
| Chiusura di vani porta esistenti | IT. No. Art. n. | 2 | SM/MQ | ||||||||||
| 3 | 90x210 INTERIOR WOOD DOOR, D1 Type | ||||||||||||
| Porte interne in legno 90x210, tipo D1 | IT. No. Art. n. | 3 | EA/NO | ||||||||||
| 4 | MINERAL FIBER PANEL SUSPENDED CEILING | ||||||||||||
| Controsoffitto in pannelli di fibra minerale | IT. No. Art. n. | 4 | SM/MQ | ||||||||||
| 5 | GRANITE CERAMIC COVE BASE | ||||||||||||
| Zoccolino in granito ceramico | IT. No. Art. n. | 5 | LM/ML | ||||||||||
| Total Architectural - Totale Architettura | |||||||||||||
| TOTAL PART II / Totale Parte II | |||||||||||||
| NEW CONSTRUCTION WORKS SUMMARY / Riepilogo Lavori di Nuova Costruzione | |||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | |||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | |||||||||||||
| PART III - MECHANICAL WORK | |||||||||||||
| PART IV - ELECTRICAL WORK | |||||||||||||
| TOTAL PRICE / Costo Totale |
B - Repair Works
| CONSTRUCTION COST ESTIMATE BREAKDOWN - Revision 1 | |||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||
| RENOVATE FAC. 1379 FOR 606 ACS BED DOWN | |||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||||
| ASHE 16-1036 | AREA F, AVIANO AIR BASE, ITALY | ||||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||||
| B. | REPAIR WORK / Lavori di Ristrutturazione | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||||||||||||
| Ia Architectural - Ia Architettura | |||||||||||||
| 1 | REMOVAL OF WOOD DOORS | ||||||||||||
| Rimozione di porte in legno | IT. No. Art. n. | 1 | EA/NO | ||||||||||
| 2 | PARTIAL DEMOLITION OF 20cm THICK REINFORCED CONCRETE WALL | ||||||||||||
| Demolizione parziale parete in c.a., spessore 20cm | IT. No. Art. n. | 2 | SM/MQ | ||||||||||
| 3 | PARTIAL DEMOLITION OF GYPSUM BOARD PARTITIONS | ||||||||||||
| Demolizione parziale di tramezzo in pannelli di cartongesso | IT. No. Art. n. | 3 | SM/MQ | ||||||||||
| 4 | REMOVAL AND STORE OF SUSPENDED CEILING PANELS | ||||||||||||
| Rimozione ed accantonamento di pannelli cotrosoffitto | IT. No. Art. n. | 4 | SM/MQ | ||||||||||
| Total Architectural - Totale Architettura | |||||||||||||
| Ib Electrical - Ib Elettrico | |||||||||||||
| 1 | REMOVAL 4P-32A CIRCUIT BREAKERS | ||||||||||||
| Rimozione interruttori 4P-32A | IT. No. Art. n. | 5 | LS/AC | ||||||||||
| 2 | REMOVAL ITALIAN/USA TYPE OUTLETS INCLUDING WIRING SYSTEM | ||||||||||||
| Rimozione prese tipo italiano/USA compresi i collegamenti | IT. No. Art. n. | 6 | LS/AC | ||||||||||
| 3 | REMOVAL AND REISTALL LIGHTING FIXTURES | ||||||||||||
| Rimozione e reinstallazione dei corpi illuminanti esistenti | IT. No. Art. n. | 7 | LS/AC | ||||||||||
| 4 | REMOVAL OF TELECOMM OUTLETS INCLUDING WIRING SYSTEM | ||||||||||||
| Rimozione di prese telefoniche compresi i collegamenti | IT. No. Art. n. | 8 | LS/AC | ||||||||||
| 5 | REMOVAL OF TELECOMM RACK Rimozione armdi telefonici | IT. No. Art. n. | 9 | LS/AC | |||||||||
| Total Electrical - Totale Elettrico | |||||||||||||
| TOTAL PART I / Totale Parte I | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | |||||||||||||
| IIa Architectural - IIa Architettonico | |||||||||||||
| 1 | 30x30 CM GRANITE CERAMIC TILE FLOOR, INCL SETT. BED FOR FLOOR PATCHING | ||||||||||||
| Pavimento in piastrelle di granito ceramico 30x30, incl. Massetto per la riprersa della pavimentazione | IT. No. Art. n. | 1 | SM/MQ | ||||||||||
| 2 | ALLUMINUM COVER AT NEW DOOR OPENING FLOOR | ||||||||||||
| Profilo in alluminio al pavimento dei nuovi vani porta | IT. No. Art. n. | 2 | LS/AC | ||||||||||
| 3 | 260x260cm RUBBER ENTRY MAT | ||||||||||||
| Zerbino in gomma 260x200cm | IT. No. Art. n. | 3 | EA/NO | ||||||||||
| 4 | REINSTALLATION OF SUSPENDED CEILING PANEL | ||||||||||||
| Reinstallazione di pannelli del controsoffitto | IT. No. Art. n. | 4 | SM/MQ | ||||||||||
| 5 | NEW SUSPENDED CEILING PANELS | ||||||||||||
| Nuovi pannelli del controsoffitto | IT. No. Art. n. | 5 | EA/NO | ||||||||||
| 6 | EXTERNAL DOOR REPAIR | ||||||||||||
| Riparazione porte esterne | IT. No. Art. n. | 6 | LS/AC | ||||||||||
| Total Architectural - Totale architettonico | |||||||||||||
| TOTAL PART II / Totale Parte II | |||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | |||||||||||||
| 1 | AIR DIFFUSER DISPLACEMENTS IN ROOMS #104 & #105 | ||||||||||||
| Spostamento diffusore aria in room #104 e #105 | IT. No. Art. n. | 1 | EA/NO | ||||||||||
| 2 | AIR RETURN SYSTEM UPGRADE IN ROOMS #104 & #105 | ||||||||||||
| Adeguamento sistema ripresa aria in room #104 e #105 | IT. No. Art. n. | 2 | LS/AC | ||||||||||
| 3 | COMPLETE AIR DUCTS CLEANING NADCA STANDARD | ||||||||||||
| Pulizia completa delle canalizzazioni NADCA standard | IT. No. Art. n. | 3 | LS/AC | ||||||||||
| 4 | COMPLETE AHU & RELATED EQUIPMENT CLEANING NADCA STANDARD | ||||||||||||
| Pulizia completa dell'AHU e dei dispositivi correlati secondo NADCA standard | IT. No. Art. n. | 4 | LS/AC | ||||||||||
| 5 | REMOVAL AND INSTALLATION OF NEW AIR DIFFUSER DN150 | ||||||||||||
| Rimozione ed installazione di nuovo diffusore dell'aria DN150 | IT. No. Art. n. | 5a | EA/NO | ||||||||||
| 6 | REMOVAL AND INSTALLATION OF NEW AIR DIFFUSER DN200 | ||||||||||||
| Rimozione ed installazione di nuovo diffusore dell'aria DN200 | IT. No. Art. n. | 5a | EA/NO | ||||||||||
| 7 | REMOVAL AND INSTALLATION OF NEW RETURN AIR GRILLE UP TO 500x500 | ||||||||||||
| Rimozione ed installazione di nuova griglia di estrazione dell'aria sino a 500x500 | IT. No. Art. n. | 6 | EA/NO | ||||||||||
| 8 | TESTING AND REBALANCING HVAC | ||||||||||||
| Test e bilanciamento HVAC | IT. No. Art. n. | 7 | LS/AC | ||||||||||
| 9 | CLEANING OF TOILETS & OTHERSDRAIN LINES | ||||||||||||
| Pulizia delle linee di scarico dei bagni ed altri servizi | IT. No. Art. n. | 8 | LS/AC | ||||||||||
| 10 | UPGRADE SPRINKLER SYSTEM | ||||||||||||
| Adeguamento impianto sprinkler | IT. No. Art. n. | 9 | LS/AC | ||||||||||
| TOTAL PART III - Totale Parte III | |||||||||||||
| PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici | |||||||||||||
| 1 | NEW 4P-16A CIRCUIT BREAKER | ||||||||||||
| Nuovi interruttor1 4P-16 A | IT. No. Art. n. | 1 | EA/NO | ||||||||||
| 2 | 195x50 FLOOR BASE CHANNEL | ||||||||||||
| Canalina battiscopa 195x50 | IT. No. Art. n. | 2 | LM/ML | ||||||||||
| 3 | UPGRADING EXISTING 10% LIGHTING FIXTURES | ||||||||||||
| Revisione 10% corpi illuminanti esistenti | IT. No. Art. n. | 3 | LS/AC | ||||||||||
| 4 | UPGRADING ELECTRICAL SYSTEM IN AREAS UNDER RESTORATION | ||||||||||||
| Revisione impianto elettrico nelle aree oggetto di ristrutturazione | IT. No. Art. n. | 4 | LS/AC | ||||||||||
| 5 | NEW COMMUNICATION OUTLETS | ||||||||||||
| Nuove prese per comunicazioni | IT. No. Art. n. | 5 | EA/NO | ||||||||||
| 6 | NEW COMMUNICATION POINT | ||||||||||||
| Nuovo punto per comunicazioni | IT. No. Art. n. | 6 | EA/NO | ||||||||||
| 7 | NEW COMMUNICATION RACK | ||||||||||||
| Nuove Armadio per comunicazioni | IT. No. Art. n. | 7 | EA/NO | ||||||||||
| 8 | NEW F/A PILOT LIGTS INCLUDING CONNECTIONS TO THE EXISTING DETECTORS | ||||||||||||
| Nuove Lampade spia per F/A compresi i collegamenti ai rilevatori esistenti | IT. No. Art. n. | 8 | EA/NO | ||||||||||
| 9 | NEW SMOKE DETECTORS | ||||||||||||
| Nuovi rilevatori di fumo | IT. No. Art. n. | 9 | EA/NO | ||||||||||
| 10 | NEW HEAT DETECTORS | ||||||||||||
| Nuovi rilevatori di calore | IT. No. Art. n. | 10 | EA/NO | ||||||||||
| 11 | NEW PULLING STATIONS | ||||||||||||
| Nuove stazioni manuali | IT. No. Art. n. | 11 | EA/NO | ||||||||||
| 12 | NEW AUDIO/VISUAL DEVICES | ||||||||||||
| Nuovi dispositivi audio/visivi | IT. No. Art. n. | 12 | EA/NO | ||||||||||
| 13 | FACP REPROGRAMMING and F/A SYSTEM TESTS | ||||||||||||
| Riprogrammazione Centrale e prove impianto rilevazione incendio | IT. No. Art. n. | 13 | LS/AC | ||||||||||
| 14 | NEW EVAC SYSTEM INCLUDING WIRINGS | ||||||||||||
| Nuovo sistema EVAC compresi i collegamenti | IT. No. Art. n. | 14 | LS/AC | ||||||||||
| 15 | NEW EMERGENCY LIGHTING FIXTURES INCLUDING WIRINGS | ||||||||||||
| Nuovi corpi illuminanti di emergenza compresi i collegamenti | IT. No. Art. n. | 15 | EA/NO | ||||||||||
| 16 | NEW EXIT LIGHTING FIXTURES INCLUDING WIRINGS | ||||||||||||
| Nuovi corpi illuminanti di uscita compresi i collegamenti | IT. No. Art. n. | 16 | EA/NO | ||||||||||
| 17 | NEW SPD SYSTEM IN EXISTING ELECTRICAL PANEL | ||||||||||||
| Nuove impianto SPD nei quadri elettrici esistenti | IT. No. Art. n. | 17 | LS/AC | ||||||||||
| 18 | ELECTRICAL SYSTEMS TESTS | ||||||||||||
| Collaudo Impianti Elettrici | IT. No. Art. n. | 18 | LS/AC | ||||||||||
| 19 | TELECOMM SYSTEM TESTS | ||||||||||||
| Collaudo Impianto Telefonico | IT. No. Art. n. | 19 | LS/AC | ||||||||||
| TOTAL PART IV - Totale Parte IV | |||||||||||||
| REPAIR WORKS SUMMARY / Riepilogo Lavori di Ristrutturazione | |||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | |||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | |||||||||||||
| PART III - MECHANICAL | |||||||||||||
| PART IV - ELECTRICAL WORK | |||||||||||||
| TOTAL PRICE / Costo Totale |
C - Sustain works
| CONSTRUCTION COST ESTIMATE BREAKDOWN - Revision 1 | |||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||
| RENOVATE FAC. 1379 FOR 606 ACS BED DOWN | |||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||||
| ASHE 16-1036 | AREA F, AVIANO AIR BASE, ITALY | ||||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||||
| S. | SUSTAIN WORK / Lavori di Manutenzione | ||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | |||||||||||||
| IIa Architectural - IIa Architettonico | |||||||||||||
| 1 | PAINT INTERIOR SURFACES WITH WATER ENAMEL | ||||||||||||
| Pitturazione con idropittura lavabile delle superfici interne | IT. No. Art. n. | 1 | SM/MQ | ||||||||||
| 2 | PAINT EXTERIOR SURFACES WITH WATER ENAMEL | ||||||||||||
| Pitturazione con idropittura lavabile delle superfici esterne | IT. No. Art. n. | 2 | SM/MQ | ||||||||||
| 3 | PAINTING OF EXTERNAL METAL DOORS AND GRATINGS | ||||||||||||
| Pitturazione di porte esterne e grate metalliche | IT. No. Art. n. | 3a | SM/MQ | ||||||||||
| 4 | PAINTING OF EXTERNAL METAL RAILINGS | ||||||||||||
| Pitturazione di ringhiere metalliche | IT. No. Art. n. | 3b | LM/ML | ||||||||||
| 5 | TOILET PAPER HOLDER | ||||||||||||
| Contenitore carta igienica | IT. No. Art. n. | 4a | SM/MQ | ||||||||||
| 6 | ROBE HOOK | ||||||||||||
| Gancio appendiabiti | IT. No. Art. n. | 4b | EA/NO | ||||||||||
| 7 | LIQUID SOAP DISPENSER | ||||||||||||
| Dispensatore sapone liquido | IT. No. Art. n. | 4c | EA/NO | ||||||||||
| 8 | PAPER TOWEL DISPENSER , AUTOCUT TYPE | ||||||||||||
| Dispensatore salviette di carta, taglio automatico | IT. No. Art. n. | 4d | EA/NO | ||||||||||
| 9 | ELECTRIC HAND DRYER Asciugamani elettrico | IT. No. Art. n. | 4e | EA/NO | |||||||||
| 10 | SHOWER BOX Box per doccia | IT. No. Art. n. | 4f | EA/NO | |||||||||
| 11 | SOAP HOLDER | ||||||||||||
| Porta sapone | IT. No. Art. n. | 4g | EA/NO | ||||||||||
| 12 | REPAIR OF BREAK AREA FIXTURES Ripristino elementi area break | IT. No. Art. n. | 5 | LS/AC | |||||||||
| 13 | VENETIAN BLINDS | ||||||||||||
| Tende alla veneziana | IT. No. Art. n. | 6 | EA/NO | ||||||||||
| 14 | INSECT SCREEN | ||||||||||||
| Rete antinsetto | IT. No. Art. n. | 7 | EA/NO | ||||||||||
| Total Architectural - Totale architettonico | |||||||||||||
| TOTAL PART II / Totale Parte II | |||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | |||||||||||||
| 1 | REPLACEMENT OF ZONE DAMPER ACTUATORS | ||||||||||||
| Sostituzione di attuatore per serranda di zona | IT. No. Art. n. | 1 | EA/NO | ||||||||||
| 2 | REPLACEMENT OF ZONE THERMOSTAT | ||||||||||||
| Sostituzione di termostato di zona | IT. No. Art. n. | 2 | EA/NO | ||||||||||
| 3 | ACCURATE MAINTENANCE OF EXISTING AHU | ||||||||||||
| Manutezione straordinaria dell'esistente AHU | IT. No. Art. n. | 3 | LS/AC | ||||||||||
| 4 | REPLACEMENT OF THE EXISTING 3-WAY MODULATING VALVE | ||||||||||||
| Sostituzione della valvola modulante a tre vie esistente | IT. No. Art. n. | 4 | EA/NO | ||||||||||
| 5 | REPLACEMENT OF EXISTING FLEXIBLE STEEL JOINT | ||||||||||||
| Sostituzione di giunto esistente flessibile in acciio | IT. No. Art. n. | 5 | EA/NO | ||||||||||
| 6 | ACCURATE MAINTENANCE OF EXISTING UNIT HEATER | ||||||||||||
| Manutenzione straordinaria di aerotermo esistente | IT. No. Art. n. | 6 | LS/AC | ||||||||||
| TOTAL PART III - Totale Parte III | |||||||||||||
| SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione | |||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | |||||||||||||
| PART III - MECHANICAL | |||||||||||||
| TOTAL PRICE / Costo Totale |
Summary
| CONSTRUCTION COST ESTIMATE BREAKDOWN - Revision 1 | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RENOVATE FAC. 1379 FOR 606 ACS BED DOWN | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 16-1036 | AREA F, AVIANO AIR BASE, ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| A. | NEW CONSTRUCTION WORKS / Lavori di Nuova Costruzione | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||
| SUB TOTAL A. | ||||||||||
| B. | REPAIR WORKS / Lavori di Ristrutturazione | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||
| PART III - MECHANICAL WORK | ||||||||||
| PART IV - ELECTRICAL WORK | ||||||||||
| SUB TOTAL B. | ||||||||||
| S. | SUSTAIN WORKS / Lavori di Manutenzione | |||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||
| PART III - MECHANICAL WORK | ||||||||||
| SUB TOTAL S. | ||||||||||
| TOTAL PRICE / Costo Totale |