Text version

ASHE 16-1035

EIC - SUSTAIN JOINT SEAL AT 606 COMPOUND PARKING LOT, AVIANO (PN) ITALY

ADDENDUM #1

A1.1. Delete Item 4a.

LS

A1.2. Delete item 4b.

LS

A1.3. Change item 4c. to read “Existing joint replacement, the item consists of saw cutting of existing materials for width up to 4 cm, cleaning, surface preparing and furnishing and installation of Sikaflex PRO-3 SL or similar approved material for large joints the item includes the load, transportation and disposal in an authorized dump of proven material, all burden included to provide a work performed in work-man-like manner”.

5,400 m

A1.4. Change item 4i. to read “French Drains, the item consists of create French drains all along the concrete pavement of the main concrete area (not the two small) digging 1 m width at the depth of 50 cm in constrained section, furnishing and laying the geotextile along the digging, furnishing and installation of a holed corrugated drain plastic pipe 125 mm of diameter, cover the hole with pebbles, the item includes the soil chamfer and the restoration of the disturbed soil and the necessary grass seeding and cure, the top of the soil toward the concrete must be 2 cm below concrete surface; furthermore the item includes the load, transportation and disposal in an authorized dump of proven material, all burden included to provide a work performed in work-man-like manner.

351 LM

A1.5. Change item 4j. to read: “Paintings, the item consists of the following works:

A1.5.a. painting 16 parking spots on the concrete pavement, 8 (eight) in front of Bldg

1335 and 8 (eight) Bldg 1381, the parking spots are 2.75 m large and 6.00 m long with a stripe 12 cm width with one short side along the concrete edge (not painted) and three other sides painted (not only dividing lines);

A1.5.b. Paint a “box” 5.30 large and 6.00 m long with a 12 cm width perimeter on three sides (the forth one is along the concrete edge) and 45° degrees lines 50 cm wide in front of ta pedestrian walkway with a handicap slope;

the paint must be white, not reflective and the item includes load, transportation and disposal in an authorized dump of proven material, all burden included to provide a work performed in work-man-like manner.

LS

The contractor shall have 45 calendar days to allow for material procurement, work completion and clean up.

Attachment: Revised French Drains Scheme