ASHE_17-1011_Addendum__2.doc
DOC document 39 KB Posted
- Solicitation number
- FA5682-15-R-0011
About this file
Project ASHE 17-1011_Technical Specifications Addendum 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_ASHE_17-1011_Milling_Area_Map.pdf | ||
| Solicitation_FA5682-15-R-0011_Amendment_0001.doc | DOC document | |
| ASHE_17-1011_Construciton_Cost_Estimate_Breakdown_Add_2.xlsx | XLSX spreadsheet | |
| Solicitation_FA5682-15-R-0011_(Sustain_Taxitrack_Sierra_Loop).doc | DOC document | |
| SF_1442_ADDITIONAL_REQUIREMENTS_June_2015.doc | DOC document | |
| ASHE_17-1011_TECHNICAL_SPECIFICATIONS_Add__1.doc | DOC document | |
| ASHE_17-1011_CCEB.xlsx | XLSX spreadsheet | |
| ASHE_17-1011_TECHNICAL_SPECIFICATIONS.doc | DOC document | |
| ASHE_17-1011_APPLICABLE_MASTER_SPECS.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
FOR
ASHE 17-1011 SUSTAIN TAXITRACK, SIERRA LOOP, FAC 770
AREA F, AVIANO AB, AVIANO (PN)
ITALY
Addendum #2
4. WORK DESCRIPTION
Item 4.1 f) is hereby changed to read Markings. The item consists of supply and installation of reflecting painting on the entire area for striping the markings in accordance with regulation and any other burden to provide the job performed in work-man-like manner in accordance with current regulations.
7,200.00 l.m.
Item 4.1 g) is hereby added Joints. The item consist of making joints between the concrete and the asphalt, the item includes cut of the bituminous material between asphalt and concrete, cleaning with air compression, furniture and installation of polyurethane bead, surfaces preparation and furniture and installation of the sealant material which has to be resistant to the chemical aggression of the fuel and matches the USAF standards. Furthermore the item includes cleaning of the area from the proven material, its load and transportation to an authorized dump and its disposal in accordance with Italian Laws and any other burden to have a job performed in work man like manner.
900.0 l.m.
CLARIFICATIONS
· A storage area of 1,400 s.m. will be allowed in the middle of the loop at one of the former staging areas.
· The purpose of item 4.1 c) is to repair several damages on the asphalt not specifically localized.
ATTACHMENT
· ASHE 17-1011 Milling Area Map
Project # ASHE 17-1011
Technical Specifications – Addendum #2
DATE: JUL 2015
31CES/CENM
File details come from the government source that posted it. Updated .