ASJD15-1052 SUSTAIN AREA 1 ASPHALT PAVEMENT, AVIANO AB, AVIANO (PN) ITALY
Solicitation number
FA5682-15-Q-5028
Issued by

About this file

Technical specifications

View the file

Other files

File Type Posted
ASJD_15-1052_-_KCCE_A_1m.xlsx XLSX spreadsheet
ASJD_15-1052_-_Map_Addendum__1.pdf PDF
FA5682-15-Q-5028_RFQ_-_ASJD_15-1052_amendment_2.pdf PDF
ASJD_15-1052_A_1.pdf PDF
FA5682-15-Q-5028_RFQ_amendment_1_-_ASJD_15-1052.pdf PDF
02741R.pdf PDF
ASJD_15-1052_-_Map_1-3_Finale.pdf PDF
FA5682-15-Q-5028_RFQ_-_ASJD_15-1052.pdf PDF
ASJD_15-1052_-_CCEB.xlsx XLSX spreadsheet
ASJD_15-1052_-_Map_2-3_Finale.pdf PDF
SAMPLE_PURCHASE_ORDER.pdf PDF
ASJD_15-1052_-_Map_3-3_Finale.pdf PDF
02761R.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project # ASJD 15-1052 Technical Specification

DATE: MAR 2015

31CES/CENM 1

U.S. AIR FORCE

ST

FIGHTER WING

ST

CES/CEPM

AVIANO AIR BASE, ITALY

TECHNICAL SPECIFICATIONS FOR

ASJD 15-1052 – SUSTAIN AREA 1 ASPHALT PAVEMENT,

AVIANO AB, AVIANO (PN)

ITALY

31CES/CENM 2

1. SCOPE OF WORK. The Contractor shall provide all management, tools, supplies, equipment, transportation and qualified personnel necessary to perform the following work:

1.1. Mill asphalt up to 7 cm (where necessary);

1.2. Leveling manholes;

1.3. Furnishing, pouring, compaction of asphalt with modifies bitumen for binder up 5 cm finished thickness reshaping the slope (where necessary);

1.4. Furnishing, pouring, compaction of asphalt with modifies bitumen for wearing course up 5 cm finished thickness reshaping the slope (where necessary);

1.5. Repair asphalt damaged by roots;

1.6. Clean manholes cover with torch and scraper;

1.7. Clean drains;

1.8. Modify curbs;

1.9. Paint horizontal signs;

Approximately 6,200.00 sm. In three different sites

2. WORK LOCATION

The work area is sited in an enclosed but not restricted or controlled area. (See attached site plan)

3. WORK SITE CONDITIONS

a. The work will performed keeping operational the area, the contractor will provide all the safety signs, equipments and preventive measures;

b. Before works start, contractor will submit a detail works schedule and phasing plan (at least six) to C.O. for coordination and approval at least two weeks before starting the field works;

c. Works will not be performed in a restricted area.

d. The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor including restorations to initial conditions.

e. Authorized work hours and days. Performance of work hereunder shall be from Monday through Friday excluding holidays from 08:00 to 17:00 hours. Work during weekends or holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting Officer has the right to deny such request if reasons requiring week end and holiday work are not valid or for security or other necessities.

f. Toilet facilities in the vicinity of the work site shall be available for Contractor use. The

Contractor shall use facilities in a manner to maintain their state of cleanliness and hygiene.

g. The Contractor shall not use base refuse containers to discard debris. All construction debris shall be discarded by the Contractor off base at authorized sites according to category of debris/refuse in strict observance of all host country laws, decrees and local regulations in force.

h. The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all host country laws concerning safety and in particular Italian laws D.L. 81/08

31CES/CENM 3

4. WORK DESCRIPTION

EACH ITEM OF THE SCHEDULE IS INCLUSIVE OF FURNISHING AND

INSTALLATION OF MATERIALS AND EQUIPMENT, SCAFFOLDING,

TRANSPORTATION TO DUMP OR STORAGE OF DEMOLISHED AND/OR

REMOVED MATERIALS, IN ACCORDANCE WITH CONTRACTING OFFICER'S

INSTRUCTIONS AND ALL FINISHING WORK REQUIRED TO MAKE EACH ITEM

COMPLETE IN A WORKMANLIKE MANNER.

ALL THE QUANTITIES THAT ARE INDICATED OR SUCCESSIVELY ADDED, ARE

ESTIMATES. THEREFORE THE GOVERNMENT SHALL BE NOT HELD

RESPONSIBLE FOR THE ACCURACY OF THE ESTIMATED QUANTITIES. THE

CONTRACT REQUIRES A COMPLETED PROJECT ON A LUMP SUM BASIS.

IT IS THEREFORE THE RESPONSIBILITY OF THE CONTRACTOR TO CALCULATE,

FORESEE AND PERFORM ALL QUANTITIES AND WORK NECESSARY EVEN IF

NOT MENTIONED IN THE SPECIFICATIONS BUT INCLUDED IN THE DRAWINGS

OR MANIFESTLY NECESSARY TO DELIVER A COMPLETE PROJECT BASED ON

ITS OVERALL SCOPE.

4.1

a) Milling. The item consists of providing all the manpower and equipment to mill up to 7 cm asphalt paved area. Item includes transportation to authorized dump and disposal of the resulting milled material, any other item to provide a job in a workmanlike manner.

7,400.00 sq.m.

b) Leveling manholes, the item consists of providing all the manpower, equipment and consuming materials to remove the covers and put them at the appropriated elevation considered the final level of the asphalt after milling and overlay. The item includes load on truck, transport and disposal in an authorized dump of the proven materials, all burden included to provide a job in a workmanlike manner.

Ea 10

c) Leveling valves, the item consists of providing all the manpower, equipment and consuming materials to put at the correct level the existing valves considered the final level of the asphalt after milling and overlay. The item includes load on truck, transport and disposal in an authorized dump of the proven materials, all burden included to provide a job in a workmanlike manner;

Ea 4

d) Cleaning the manholes. The item consists of provide all the manpower and the equipment to proceed with the cleaning of the manholes covers with a torch and a steel brush. The item includes load on truck, transport and disposal in an authorized dump of the proven materials, all burden included to provide a job in a workmanlike manner;

Ea 67

31CES/CENM 4

e) Cleaning drain manholes. The item consists of provide all the manpower and the equipment to proceed with the cleaning of the drain manholes removing all the existing dust and the new one caused by the works. The item includes the use of high pressure water, load on truck, transport and disposal in an authorized dump of the proven materials, all burden included to provide a job in a workmanlike manner;

Ea 16

f) Drains cleaning, the item consists of provide all the manpower and the equipment to proceed with the cleaning of the drains different than manholes removing all the existing dust and the new one caused by the works. The item includes the shaping of the soil behind the drains and turf restoring where required and the use of high pressure water, load on truck, transport and disposal in an authorized dump of the proven materials, all burden included to provide a job in a workmanlike manner;

Ea 4

g) Replacing curbs, the item consist of provide all the manpower, the equipment and the material to remove the existing curbs in the parking lot of the building 103 and one element with drain in the swimming pool parking lot, The item includes load on truck, transport and disposal in an authorized dump of the proven materials, all burden included to provide a job in a workmanlike manner;

20 l.m.

h) Asphalt reshaping. The item consists in reshaping of asphalt ruined by the tree roots. The item includes asphalt cutting, asphalt and soil demolition, furnishing, lying and compaction of soil to create foundation to receive the binder. Furthermore the item includes load on truck, transport and disposal in an authorized dump of the proven materials, all burden included to provide a job in a workmanlike manner.;

100 sq.m.

i) Furnishing and installation of asphalt for binder layer. The item consists of furnishing and installation of asphalt cement concrete 8cm of thickness compacted for binder layer creating new slopes if necessary for proper water drainage to avoid water ponds, the item includes also manpower and equipment and all burden included to provide a job in a workmanlike manner.

100 sq.m.

j) Manpower and equipment to clean milled area before paving. Item includes motorized sweeper, and any other item to provide a job in a workmanlike manner.

7,400.00 sq.m.

k) Supply and installation of modified bituminous wearing course with polymeric additive (hard type) 5 cm thick. Item includes bituminous primer and any other item to provide a job in a workmanlike manner.

7.400.00 sq.m.

31CES/CENM 5

l) Markings. The item consists of supply and installation of not-reflecting painting on the entire area for striping the parking slots, lines (continuous and not) arrows yield and stop signs as it is plus two new stop signs continuous side and center lines and any other burden to provide the job performed in work-man-like manner in accordance with Italian Road Code.

Lump Sum

5. APPLICABLE TECHNICAL SPECIFICATIONS

The following Sections of the Master Specifications for construction projects of the Air Base in

Aviano (PN), Italy, dated 2009 and applicable modifications shall be applicable to the present project, together with the List of Work Items to be performed:

02741R BITUMINOUS CONCRETE PAVEMENT

02761R PAVEMENT MARKING

6. FINAL ACCEPTANCE TEST, CERTIFICATIONS AND OTHER REQUIREMENTS

1) Once issued NTP, Contractor is required to contact CEAOR (Ms. Cristina Rossetto 0434-305691) and schedule a meeting to fill Form DD1354 with appropriate project data for real property capitalization (DD1354 and category codes list CATCODE_LIST_2010 are available in engineering office during normal hour of operations). Contractor is required to provide final Form DD1354 for

31CES/CD signature before contract close out.

2) Included in the cost proposal, contractor will submit technical data of asphalt (binder and wearing course) he intends to apply for the subject project.

7. ATTACHMENTS:

1. ASJD 15-1052 Sustain Area 1 asphalt pavement – 1/3

2. ASJD 15-1052 Sustain Area 1 asphalt pavement – 2/3

3. ASJD 15-1052 Sustain Area 1 asphalt pavement – 3/3