ADDENDUM 1 TO RFQ
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE_14_1036_SOW__ADD_1.doc | DOC document | |
| RFQ_ASHE_14-1036.doc | DOC document | |
| ASHE_14_1036_CNS_Cost_Est_blank.xls | XLS spreadsheet | |
| ASHE_14_1036_SOW.doc | DOC document | |
| DRAWINGS.pdf | ||
| SAMPLE_PURCHASE_ORDER.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
31ST FIGHTER WING (USAFE)
2 April 2015
MEMORANDUM FOR OFFERORS
FROM: 31st CONTRACTING SQUADRON/LGCC
Via Pordenone, 89/B, Area E, Bldg # 600
33081 AVIANO (PN)
SUBJECT: Addendum # 1 to Request for Quotation FA5682-15-Q-5015
1. You are hereby afforded an opportunity to submit your quotation for project ASHE 14-1036 REPAIR HVAC SYSTEM BLDG 1412, AREA F, AVIANO AIR BASE, ITALY.
2. Quotations, subject to the Simplified Acquisition Procedures (SAP) of FAR Part 13, must reach this office by 16:00 hrs, 20 April 2015. Quotations may be handcarried (no receipt released) to 31 CONS/LGCC Via Pordenone 89/B, Bldg 600, Area E, 33081 Aviano (PN); or faxed to 0434-308557; or e-mailed to resi.santin@us.af.mil and severino.mion@us.af.mil.
3. An organized site visit is scheduled on 1st April 2015 @ 09:00 hrs. Place of convene shall be:
Gate 8, (LVIS gate ROVEREDO–BUDOIA highway)
33081 AVIANO (PN) ITALY
The site visit will allow offerors to satisfy themselves as to all conditions that may affect the cost of performance of the contract. Failure to inspect the site shall not constitute grounds for a claim after award of the purchase order.
Please send an e-mail/fax to the undersigned by close of business, 31 March 2015 if you will attend the site visit.
4. The magnitude of this project is between $25,000 and $100,000
5. Your quotation must also be inclusive of provisions 252.225-7042, 52.204-7, 252.204-7004 Alternate A and all the requirements set forth in the clauses of the resulting purchase order as listed in the attached sample and submission of a quotation shall constitute compliance with and acceptance of these requirements. In particular, your attention is drawn to the requirements of the following clauses:
Non Work Days
Insurance Amounts Progress Schedules & Reports & 52.236-15 Schedules for Construction Contracts 52.204-13 System for Award Management, Maintenance 52.211-10 Commencement, Prosecution and Completion of Work
52.232-33 Payment by Electronic Funds Transfer 52.246-12 Inspection of Construction
52.246-21 Warranty of Construction
252.225-7041 Correspondence in English 252.229-7000 Invoices Exclusive of Taxes or Duties
252.229-7003 Tax Exemptions (Italy)
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
5352.242-9000 Contractor Access to Air Force Installations
6. The Government intends to award a purchase order to the responsible vendor whose quotation represents the best value after evaluation in accordance with the factors indicated here below.
7. Offers will be evaluated on:
-Price, determined to be reasonable and affordable.
-Technical acceptability: current SOA Certification, category OG11 and/or OS28 and classification adequate to cover vendor’s proposed amount for project performance -Past Performance:
· Contarctor to provide evidence of at least 2 projects executed in the past 5 years with technical characteristics and amount similar to subject project.
8. Offer documents. The following documents shall be submitted and shall constitute the vendor’s quotation. Failure to submit any of the below documents may be cause for rejection of the quotation.
a. Schedule- Addendum #1: quoted project total price (the total amount resulting from the price breakdowns of the Construction Cost Estimate Breakdown) with completed fill-ins and signature
b. Construction Cost Estimate Breakdown with completed fill-ins and signature c Technical Acceptability Documentation as indicated in paragraph 7 above
d. Past Performance Information as indicated in pargraph 7 above
9. A binding contract will be consummated on vendor acceptance of the resulting purchase order by completion and signature of block 16 of DD1155. In accordance with clause 52.211-10 Commencement, Prosecution And Completion Of Work, no work, including acquisition of materials, shall commence until issuance of the Government Notice to Proceed.
//SIGNED//
RESI SANTIN
Purchasing Agent
Resi.santin@us.af.mil
0434-304309 Attachments:
1. “Schedule- Addendum #1” 2 Pages
2. ASHE 14-1036 Technical Specifications, 9 pages
3. ASHE 14-1036 Drawings, 20 pages
4. ASHE 14-1036 Construction Cost Estimate Breakdown, 1 page
5. Sample of Purchase Order, 53 pages
SCHEDULE- ADDENDUM #1
| ITEM |
| DESCRIPTION |
| 0001 |
| THE CONTRACTOR SHALL FURNISH ALL LABOR, TOOLS, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH ASHE 14-1036 REPAIR HVAC SYSTEM BLDG 1412, AREA F, AVIANO AB, ITALY IN ACCORDANCE WITH THE FOLLOWING: |
A.TECHNICAL SPECIFICATIONS PROJECT ASHE 14-1036 REPAIR HVAC SYSTEM BLDG 1412 AREA F, AVIANO AIR BASE, ITALY, DATED FEB 2015 AND MARKED TECHNICAL SPECIFICATIONS.
- 9 WRITTEN PAGES INCLUDING COVER PAGE AND ADDENDUM # 1
B. DRAWINGS (20 EA) FOR PROJECT ASHE 14-1036
TOTAL PROJECT______________________
NOTICE TO OFFERORS
All quantities indicated in the project documents furnished by the Government, including the construction cost breakdown, are estimates and the Government shall not be held responsible for the accuracy of the estimated quantities. The contract shall require a completed project on a lump sum basis. It is the responsibility of the offeror to calculate, foresee and perform all quantities of work manifestly necessary to deliver a complete project based on its overall scope.
The contractor shall be in possession of a current SOA throughout the entire performance of the contract.
Request for Quotation FA5682-15-Q-5015, Schedule - Addendum #1 page 1 of 2
CLAUSE INFORMATION
Clause 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK: The applicable inserts are as follows:
(a ) 30
( c ) 120 calendar days after the date contractor receives the notice to proceed
NAME AND TITLE OF SIGNER/LEGAL REPRESENTATIVE
SIGNATURE
DATE
FIRM
ADDRESS
TELEPHONE/FAX
ELECTRONIC FUNDS TRANSFER (EFT) PAYMENT INFORMATION
BANK: __________________________________________________________
ADDRESS: __________________________________________________________
ACCOUNT NUMBER: ________________________________________________
SWIFT: _____________________________________________________________
IBAN: _____________________________________________________________
ABI: _____________________________________________________________
CAB: _____________________________________________________________
Request for Quotation FA5682-15-Q-5015, Schedule - Addendum #1 page 2 of 2
File details come from the government source that posted it. Updated .