FA5682-14-R-0009-0001.doc
DOC document 44 KB Posted
- Solicitation number
- FA5682-14-R-0009
About this file
AMENDMENT 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5682-14-R-0009-0002.pdf | ||
| ASHE_14-1019_ADDENDUM__2.pdf | ||
| Addendum__1_Dwg_M-1_rev__15_Apr_14.pdf | ||
| Solicitation_FA5682-14-R-0009_(HVAC_Dorms).doc | DOC document | |
| Master_Technical_Specifications.zip | ZIP file | |
| Design_Guide_ _Attachments.zip | ZIP file | |
| ASHE_14-1019__Blank_CCE.xls | XLS spreadsheet | |
| ASHE_14-1019_Drawings.zip | ZIP file | |
| ASHE_14-1019_TECH_SPECS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
THE PURPOSE OF THIS AMENDMENT IS TO:
· INCORPORATE ADDENDUM #1 TO THE TECHNICAL SPECIFICATIONS AND
· EXTEND THE CLOSING DATE FOR SUBMISSION OF OFFERS.
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 05-May-2014 04:00 PM to 08-May-2014 04:00 PM.
The offeror acceptance period has decreased by 2 from 148 to 146.
The performance period code Mandatory has been added.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED HEREUNDER AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT INCLUDING THE DOCUMENTS LISTED IN SECTION J HEREIN.TECHNICAL SPECIFICATIONS PROJECT ASHE 14-1019 SUSTAIN HVAC SYSTEM, DORMS, AREA F, AVIANO AIR BASE, AVIANO, ITALY. to THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED HEREUNDER AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT INCLUDING THE DOCUMENTS LISTED IN SECTION J HEREIN.TECHNICAL SPECIFICATIONS PROJECT ASHE 14-1019 SUSTAIN HVAC SYSTEM, DORMS, AREA F, AVIANO AIR BASE, AVIANO, ITALY AND ADDENDUM #1 THERETO.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS
The following documents are an integral part of this contract:
a. Attachment 1:
Master Technical Specifications for Construction Projects Aviano Air Base, Aviano, Italy, dated November 2005
b. Attachment 2:
Aviano AB Design Guide 2011 Revision including Annexes
c. Attachment 3:
Technical Specifications Project ASHE 14-1019 Sustain HVAC System, Dorms, Area F, Aviano Air Base, Aviano, Italy marked Final (100%) and dated March 15th, 2014.
- 21 pages including cover page
d. Attachment 4:
Drawings
- 7 sheets including drawing M-1 dated 15 Apr 14 and marked rev 1 addendum #1 and which replaces drawing M-1 dated 04 Feb 14.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .