DRAFT Packing and Crating PWS.pdf
PDF 3 MB Posted
- Attached to
- Packing and Crating
- Solicitation number
- FA564127Z0002
About this file
This is a Performance Work Statement (PWS) for packing, containerization, and local drayage services for Direct Procurement Method (DPM) personal property shipments of Department of War (DoW) personnel, effective November 10, 2026, in accordance with Defense Transportation Regulation 4500.9-R, Part IV.
The contractor must furnish all personnel, equipment, facilities, supplies, and materials (except government-owned containers) to perform comprehensive household goods (HHG) and unaccompanied baggage (UB) services across three geographic areas: Kaiserslautern Military Community (75 miles/120 kilometers around Ramstein Air Base), Spangdahlem Air Base (50 miles/80 kilometers radius), and Lajes Field, Azores, Portugal (complete island of Terceira). Key service requirements include premove surveys, weighing using certified scales with state inspector certification, preparation and packing to minimize cubic measurement, inventory and tagging, appliance servicing/unservicing per manufacturer specifications, containerization using government-owned containers where available or contractor-furnished containers compliant with ASTM standards, security sealing, exterior container marking with Military Shipping Labels, outbound and inbound documentation completion, storage with proper elevation and protection, delivery and unpacking services, and claims handling under full replacement value provisions. Contract performance spans January 1, 2028 through December 31, 2028, with government placing completion orders for shipments in possession for 180 days post-expiration. The contractor must maintain adequate facilities meeting specified guidelines, provide cargo insurance with minimum coverage detailed in Appendix A-G6, and submit monthly performance metrics and various contractual data requirements including quality control plans, weekly outbound reports, government-owned container reports, and shipment tracking documentation. Standard working hours are 0800-1700, with extended hours requiring prior approval. The PWS establishes performance thresholds requiring no more than three percent incorrectly packed/loaded shipments monthly and 98 percent on-time documentation submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Packing and Crating RFI.pdf | ||
| DTR Part IV Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 28 Performance Work Statement (PWS)
PERFORMANCE WORK STATEMENT (PWS)
FOR PACKING, CONTAINERIZATION AND LOCAL DRAYAGE
OF DIRECT PROCUREMENT METHOD (DPM)
PERSONAL PROPERTY SHIPMENTS
10 November 26
In Accordance with Defense Transportation Regulation (DTR) 4500.9-R, Part IV, Personal Property, APPENDIX A-G
Page 2 of 28 Performance Work Statement (PWS)
TABLE OF CONTENTS
PERFORMANCE WORK STATEMENT FOR PACKING, CONTAINERIZATION AND
LOCAL DRAYAGE OF DIRECT PROCUREMENT METHOD (DPM) PERSONAL
PROPERTY SHIPMENTS
SECTION/TITLE PAGE
PART I – DESCRIPTION OF SERVICES 04
SCOPE OF WORK 04
1. Premove Survey 05
2. Weighing 05
3. Time Requirements 06
4. Preparation, Packing, Loading and Containerization 07
5. Tagging, Inventorying, and Packing List 09
6. Appliance Servicing and Unservicing 11
7. Containers and Vehicles 12
8. Marking Exterior Shipping Containers 13
9. Outbound Documentation and Movement 16
10. Storage 18
11. Facilities 19
12. Cargo Insurance 19
13. DPM Delivery, Unloading, and Unpacking 19
14. Claims 20
15. Subcontracting 20
16. Drayage 20
17. Erroneous Shipments 21
PART II – GOVERNMENT-FURNISHED PROPERTY AND SERVICES 22
PART III – GENERAL REQUIREMENTS 22
1. Application 22
2. Personnel 22
3. Materials 22
4. Documentation and Reports 22
5. Quality Control and Assurance 22
6. UB Shipments Using Air Mobility Command (AMC) Aerial Ports 23
PART IV – LIST OF SUPPORTING DTR CHAPTERS 24
PART V – LIST OF APPENDICES 24
PART VI – LIST OF ATTACHMENTS 24
Attachments 25
Tables and Figures 25
Page 3 of 28 Performance Work Statement (PWS)
Table A-G-1 - Task/Type of Move Matrix 25 Table A-G-2 - Service Delivery Summary 25 Figure A-G-1. DD1844, List of Property and Claims Analysis Chart 26 Figure A-G-2 - DD Form 1299, Application for Shipment and/or Storage 27 of Personal Property
Page 4 of 28 Performance Work Statement (PWS)
PART I – DESCRIPTION OF SERVICES
SCOPE OF WORK
The contractor(s) will furnish all personnel, equipment, facilities, supplies, services, and materials, except as specified herein as government-furnished, for the preparation of the personal property (including servicing of appliances) of Department of War (DoW) personnel for shipment, drayage and/or storage and related services through the Direct Procurement Method (DPM). Work to be performed will be those services in the Schedules awarded to the contractor(s) as outlined in individual Contract Line-Item Number (CLIN) items (see Attachment A-G3). Table A-G-1, Task/Type of Move Matrix, shows which tasks normally apply to each type of move. The contractor(s) will furnish all materials except Government-Owned Containers (GOC [Federal Specification PPP-B-580]), all equipment, plant and labor; and perform all work in accomplishing containerization of personal property for overseas or domestic movement or storage, including stenciling, cooperage, drayage of personal property in connection with other services, decontainerization of inbound shipments of personal property; and the handling of shipments into and out of the Contractor's facility. Specific requirements for each task are described below. If specific instructions or requirements are not provided, commercial standards of services and best business practices are acceptable. Excluded from the scope of this contract is the furnishing of like services or materials which are provided incident to complete movement of personal property when purchased by the Through Government Bill of Lading or other method/mode of shipment or property to be moved under the Do-It-Yourself moving program or otherwise moved by the owner.
The contractor(s) will perform services within the following defined areas of performance, which include terminals identified in the Schedule and/or individual CLIN items. The Government will consider all areas of performance described in the Schedule and/or individual items including the contractor's facility, regardless of geographical location.
Areas of responsibility and performance are:
Area I: Kaiserslautern Military Community (KMC): 75 miles/120 kilometers radius around Ramstein Air Base to include the following: Army facilities at Kleber, Panzer, Daenner Kaserne, Vogelweh, Landstuhl, Miesau, Pirmasens, Rhine Ordnance, Pulaski Barracks and the Air Force facilities at Ramstein Air Base which include, Einsiedlerhof, Sembach, and Kapaun Air Station.
Area II: Spangdahlem Air Base: 50 miles/80 kilometers radius around the air base.
Area III: Lajes Field, Azores, Portugal: The complete island of Terceira, which is less than 20 miles/32 kilometers radius.
Page 5 of 28 Performance Work Statement (PWS)
1. Premove Survey.
The contractor(s) will determine the nature of personal property offered for shipment either by physical inspection or telephone survey with the member/employee. The survey will be conducted at a time and date mutually agreed upon between the contractor and the member/employee. The contractor(s) will coordinate any pack/pickup date changes with the CPPSO.
2. Weighing.
a. The gross, tare, and net weight of all shipments will be determined by the contractor(s) through the use of scales properly certified by a state inspector of weights and measures in accordance with (IAW) the regulations of the state having legal jurisdiction over the scales.
Personnel designated to operate the scales will be licensed by the German or Portuguese officials or otherwise qualified as weigh masters if required by the state. When a metric scale is utilized, the contractor(s) will use 1 kilogram per 2.2 pounds for conversion. The contractor(s) will use certified calibrated scales that meet the requirements of the German and Portuguese national law and manufacture’s recommendations.
b. The contractor(s) will submit weight tickets, reflecting gross, tare, and net weight, in duplicate, properly certified IAW federal, state regulations to the CPPSO with documents (Contract Data Requirements List [CDRL] 0002).
c. When scales are not available or their use is not practical, the application of a constructive weight of 7 pounds per cubic foot will be used provided prior written approval is obtained by the contractor(s) from CPPSO. (See Paragraph 2.d for constructive weight of professional books, papers, and equipment [PBP&E], also known as PRO or PRO-Gear and paragraph 5.d for a more detailed description of what is included in PRO-Gear).
d. When PBP&E are included as part of the shipment, the contractor will enter the weight of each item individually described on the inventory on the same line of the inventory next to the description. The contractor will annotate the total weight of such articles separately on the inventory and packing list. The PBP&E weight may be obtained using bathroom or platform type scales. If it is not possible or practical for the contractor to weigh the items at the time of packing and pickup, and there is no cube indicated on the inventory, the contractor will use a constructive weight of 7 pounds per cubic foot for PBP&E.
e. The weight tickets will contain the name and address of the weighing station, date, name of contractor, van or trailer number, name of member/employee, call number assigned by CPPSO, and signature of the weigh master.
f. For inbound personal property, the contractor(s) will bill on the origin net weights obtained from the Personal Property Government Bill of Lading/Bill of Lading (PPGBL/BL) or other movement document and need not submit a weight certificate, unless a reweigh is ordered by CPPSO. When a reweigh is ordered, the contractor(s) will bill on the reweigh weight.
g. If the PPGBL/BL, movement document, or container does not reflect the net weight for inbound shipments or if the PPGBL/BL is unavailable at the destination, the contractor(s) will
Page 6 of 28 Performance Work Statement (PWS) bill on the origin gross weights obtained from the PPGBL/BL, or other available sources, such as containers or supporting documentation. The contractor(s) will use all means available (containers, supporting documentation) to obtain a net weight prior to submitting the bill. If the bill is submitted on the origin gross weight, CPPSO will pay the contractor(s) for the gross weight based on the net weight bid price.
h. The contractor(s) will perform reweigh services when ordered by CPPSO. The reweigh will be requested at the time the delivery order is placed and will be performed IAW instructions set forth in Paragraph 2.a. When so advised by CPPSO, a designated representative of the CPPSO and/or the member/employee will be permitted to accompany, in a separate conveyance, the contractor to witness the reweigh. This conveyance would be at no extra charge for the Government, and the contractor would not provide the separate conveyance.
i. When a reweigh is ordered by CPPSO, the contractor(s) will furnish the CPPSO the weight tickets in duplicate within 7 workdays of completion of the service.
j. When the weighing of a shipment at origin is witnessed by the CPPSO, the back of all copies of the weight ticket will be annotated by a designated representative of the CPPSO with the statement “weight observed” and verified by the signature of the CPPSO. The contractor(s) will similarly annotate the number 7 copy of the PPGBL/BL (property received copy) prior to mailing to the destination CPPSO. When computer-generated PPGBL/BLs are used, the contractor(s) will annotate the copy going to the destination CPPSO.
k. Minimum Weight Billing. For overseas activities, excluding Hawaii and Alaska, shipments are payable on the actual net weight shipped.
l. The contractor(s) will provide actual pieces, weight, and cubic feet of UB shipments to the CPPSO prior to the issuance of the PPGBL/BL.
3. Time Requirements.
a. This contract begins January 1, 2028, and ends December 31, 2028, both dates inclusive.
Any work ordered before and not completed by the expiration date will be governed by the terms of this contract. The Government may place orders required for the completion of services (for shipments in the contractor's possession) for 180 calendar days past the expiration date. The CPPSO will normally give the contractor(s) notice to commence services ordered herein at least one (1) full workday prior to the date specified. Oral orders will be confirmed in writing within two (2) workdays following order acceptance by the contractor(s). The contractor(s) will be available to receive orders from CPPSO between the hours 0800 and 1700.
Upon request, the contractor(s) will provide CPPSO with information as to whether the service will be performed between the hours of 0800 to 1200 hours or between the hours of 1200 to 1700 hours, based upon the best information available.
b. The contractor will not begin pickup or delivery services at a member’s/employee’s residence before 0800 hours or after 1700 hours without prior approval of CPPSO and the member/employee. All work beyond 1700 must be approved by the member/employee. The contractor will not begin any service that will not allow completion by 2100 hours without
Page 7 of 28 Performance Work Statement (PWS) approval by the CPPSO and the member/employee by 1630 hours of the scheduled date. When services cannot be completed on the scheduled date, the contractor will notify the CPPSO and the member/employee. In case of an approved suspension of operations by CPPSO, the contractor will assure his/her return the next workday at 0800 hours to complete the services.
All pickups and deliveries occurring outside of normal hours to include Saturday, Sunday, all U.S. holidays and host nation holidays must be pre-approved and coordinated between the contractor, member/employee, and the CPPSO.
c. If containerization is ordered by the CPPSO at the contractor’s facility, the contractor(s) will pick up the HHG or UB on the date and within the hours specified by CPPSO. Unless a longer period is authorized by CPPSO, the maximum containerization time allowed at the contractor’s facility will be three (3) workdays following the specified pickup date for HHG and two (2) workdays following the specified pickup date for UB.
d. The contractor(s) will accept from commercial carriers and pickup from commercial, air, water, and military terminals inbound shipments of HHG or UB. The contractor(s) will notify CPPSO upon arrival of a shipment no later than 1200 hours of the next workday. The contractor will deliver the shipment to the member/employee within three (3) workdays following the date of the contractor’s arrival notification unless otherwise specified by the CPPSO. For shipments in storage, the contractor will affect delivery to the member’s/employee’s residence within three (3) workdays following notification for delivery by the CPPSO (e.g., if the CPPSO calls on Monday, the personal property will be delivered to the member’s/employee’s residence on or before Thursday). The contractor(s) will not deviate from the specified delivery date unless approved by CPPSO.
4. Preparation, Packing, Loading and Containerization.
a. The contractor(s) will prepare, pack, load, and containerize personal property for all types of shipments destined for the CONUS or Outside CONUS (OCONUS). The contractor(s) will coordinate with the CPPSO container size and configuration for each mode of shipment prior to packing containers.
b. The contractor(s) will perform all preparation and packing in a manner requiring the least cubic measurement, producing packages that withstand normal movement without damage to the container or contents and at a minimum of weight. The contractor(s) will protect all shipments from the elements (rain, snow, or sun) and theft always.
(1) Items of unusual nature may require disassembly service by a third party. The contractor(s) will not arrange for third-party service without the authorization of the CPPSO. The contractor(s) will bill the charges for third-party service as a separate charge on the invoice and supported with two (2) copies of the third-party company’s invoice.
(2) The contractor(s) will not be required to disassemble swing sets, outdoor recreation equipment, exercise equipment, trampolines, television and radio antennas, and similar articles. The member/employee will disassemble these items. The contractor(s) will
Page 8 of 28 Performance Work Statement (PWS) show items disassembled by the member/employee in the remarks section of the inventory as Disassembled by the Owner (DBO).
(3) Member/Employee-Packed Items. The contractor will inspect and repack items already packed by the customer, except for Attachment A-G3, Schedule I, Item 0006, Outbound Service-Unaccompanied Baggage Packed by Customer, and Item 0007, Outbound Service-Unaccompanied Baggage Packed by Customer-Consolidated Shipments/Government Facility. The contractor assumes liability for whatever they pack. The contractor has the right to inspect all items and will use the appropriate carton(s) to pack all items (e.g., clothes in wardrobe boxes), thereby affording items proper protection. CPPSO will ensure items are shipped in sealed cartons for stacking in trucks/crates and to avoid pilferage. Therefore, one of two things must occur:
(a) The contractor packs all the contents in cartons and then stacks empty plastic totes or tubs separately for onward movement, or
(b) The member/employee provides an already-packed tote/tub and the contractor then inspects it and decides to do one of the following:
i. Empty the tote/tub and place its contents in a carton, or
ii. Ship the tote/tub as is with contents (it will be the contractor’s responsibility to place the tote/tub in a proper carton or container for safe movement; tape may not be placed directly on the tote/tub).
Note: The above decision is at the contractor’s discretion. The member/employee cannot insist that the contents must remain in the tote/tub, since the contractor assumes liability for the tote/tub and the contents.
(4) Trunks and Footlockers. Trunks and footlockers packed by the member/employee may be inspected by the contractor to determine if the contents are packed safe for travel or if the contractor needs to be repacked.
c. When CPPSO authorizes the contractor(s) to use tailgating, the load will not extend beyond the surface of the tailgate or beyond the surface of the vehicle. The contractor(s) will protect the tailgated items from inclement weather by a suitable covering.
d. Containerization. The contractor will containerize outbound HHG and UB at the member’s/employee’s residence, unless otherwise authorized by CPPSO. The contractor(s) will perform all exterior containerization services as prescribed in Paragraph 7 for the type of articles, destination, and method of shipment designated by CPPSO.
(1) Firearms. When firearms are included in containerized shipments, the contractor(s) will place them in the number one (1) container in such a manner to permit easy withdrawal for inspection by customs officials, when required, and the container closed and sealed at the member’s/employee’s residence. Make, model, caliber or gauge, and serial number of the firearm will be listed on the inventory form (see Paragraph A.5.c) The contractor(s) will comply with the following provisions of Public Law 103-159, Brady Handgun Violence Protection Act and the Personal
Page 9 of 28 Performance Work Statement (PWS)
Property Consignment Instruction Guide (PPCIG). Marking the outside of any package, luggage, or other container indicating that the package contains a firearm is prohibited. This does not exclude attaching documentation in a sealed envelope to a box/container of HHGs. The contractor(s) will procure a signed acknowledgement of receipt from the recipient of any package containing a firearm.
(2) Boats. Boats may include, but are not limited to, the following: canoes, skiffs, light rowboats, kayaks, and sailboats. The contractor will accept a boat and/or boat trailer less than 14 feet in length or over 14 feet in length (member only) but less than 500 pounds in weight from a member/employee. Members/employees are limited to domestic shipment of boats and their associated trailer that can be transported in a moving van (e.g., canoe, kayak, rowboat, or outboard/inboard motorboat [14 feet or less]). The contractor(s) will containerize components and boat accessories that will not fit into an American Society for Testing and Materials (ASTM) D4169-16, Standard Practice for Performance Testing of Shipping Containers and Systems or Military Surface Deployment and Distribution Command (SDDC) Pamphlet 55-12, Transportation and Travel Commercial Containers for Department of Defense Household Goods Shipments, container IAW ASTM D6251/D6251M-011, Standard Specification for Wood-Cleated Panelboard Shipping Boxes. The member/employee will be responsible for any special crating or materials needed to move the boat by
DPM.
e. Security Seals. The exterior HHG/UB containers and boxes, including overflow and oversize boxes and rug tubes/cartons, will be sealed with accountable seals at the member’s/employee’s residence, unless otherwise authorized by the CPPSO. The contractor will complete sealing prior to any movement and the seal (control) numbers entered on the inventory, cross-referencing the container number. The contractor will use two (2) seals, as a minimum, for UB, per box and seals will secure the access overlap top and ends. If only two
(2) seals out of a set of four (4) are used, the seals not used will be destroyed at the time of sealing or given to the member/employee. Four (4) seals, as a minimum, on HHG, will be used per box and seals will secure the access overlap door and side panels.
f. Removal of Debris. Packing and loading at the origin will include, as a minimum, removing from the member’s/employee’s residence all empty contractor-provided containers, packing materials, and other debris accumulated incident to packing and loading unless specifically waived by the member/employee in writing. Debris removal will be IAW with the current year Tender of Service requirements in conjunction with the International Tender charge for that year. Debris Removal required pre-approval from CPPSO and is utilized by exception only provided by services guidance (e.g., Bluebarks, etc.) The charge only applies when CPPSO requests the contractor to perform debris removal of unpacked cartons subsequent to the date of delivery and the service is performed within 30 days of delivery date.
5. Tagging, Inventorying and Packing List.
The contractor, in coordination with the member/employee, will prepare an accurate, legible, HHG/UB descriptive inventory similar to Figure A-G1-1, Household Goods Descriptive Inventory. The contractor will count and examine all goods tendered for shipments, receipt for
Page 10 of 28 Performance Work Statement (PWS) them, and make written exception for any goods not in apparent good order. The contractor will accomplish all tagging prior to the removal of goods from the residence.
a. Inventory Identification. The contractor(s) will mark each carton to indicate the general contents and member’s/employee’s last name. The contractor(s) will tag and inventory each carton as a separate inventory line item. The contractor(s) will identify the cartons by type and cube with an indication of general contents, such as, linens, pots and pans, mirror carton, 3.5 cubic feet.
b. Inventory Symbols. The contractor(s) will use the “Exception Symbols” and “Location Symbols,” as shown in Figure A-G1-1, to describe exceptions and their locations. Exceptions and their locations will be true and accurate. The omission of exception symbols will indicate good condition except for normal wear. The contractor(s) will describe in as much detail as possible items of furniture; for example, television sets will be identified as being either console or portable. The contractor(s) will annotate on the inventory items, such as TVs, stereo components, computer hardware, VCRs, and video cameras, by make, model, and serial number when these are visible on the outside of the item.
c. The contractor(s) will annotate each privately owned firearm on the inventory by make, model, caliber or gauge, and serial number.
d. For PBP&E, the contractor(s) will ensure the term “PRO-GEAR (PRO)” is used to identify such articles on the inventory, together with the cube and weight of the individual carton; a line entry item for each container, such as, carton PRO 3 cubic ft., 53 lbs. These items identified by the member/employee will be separated from other items of the shipment, weighed separately, and placed in separate boxes or cartons to provide safe transportation. The contractor(s) will use the symbol PRO. The contactor will record the total weight of the packed professional items on the last page of the inventory and on the packing list for outbound HHG and UB shipments. PRO-GEAR is identified as instruments, tools, and equipment peculiar to technicians, mechanics, medical professionals, musicians (band uniforms) and members of the professions. Sports equipment, office furniture, household furniture, shop fixtures, bookcases, study/computer desks, file cabinets, racks, personal computer equipment and peripheral devices, and commercial products for sale/resale used in conducting business are not PRO-
GEAR.
e. The contractor(s) will show items disassembled by the contractor(s) in the remarks section of the inventory as Contractor(s) Disassembled (CD). Items disassembled by the member/employee will be shown in the remarks section of the inventory as DBO. When an article is packed by the member/employee, it may be inspected by the contractor to determine if the contents are packed safe for travel or if the contractor needs to repack an original container furnished by the member/employee, the inventory will indicate the type of article and will list it as Contractor Packed (CP).
f. The contractor(s) will inventory motorcycles, mopeds, and motor scooters as one line item, listing their serial number, make, year, model, and odometer reading. For international shipments, the contractor(s) will ensure one copy of the title and/or registration is attached to
Page 11 of 28 Performance Work Statement (PWS) all copies of the PPGBL/BL/Commercial Bill of Lading/Transportation Control and Movement Document (TCMD).
NOTE: Motorcycles and mopeds that do not conform to vehicle emissions standards and motor vehicle safety standards of the destination country cannot be shipped as part of a HHG shipment.
g. When the CPPSO permits the contractor(s) to partially containerize a shipment at the warehouse, the contractor will annotate each item removed from the residence on the inventory as Containerized Warehouse (CW). The contractor will seek member/employee approval to containerize at the warehouse prior to departing the residence.
h. Inventory Form. The inventory form will bear the signature of the member/employee, and date signed, together with the signature of the contractor’s representative and date signed certifying its accuracy and completeness.
i. The contractor will prepare the inventory in five (5) copies for outbound HHG and UB shipments and in three (3) copies for local drayage moves. The original and all copies will be legible and will bear the name and complete mailing address of the contractor. The contractor will furnish the original inventory to CPPSO. The contractor will retain one (1) copy, and one
(1) copy will be given to the member/employee (CDRL 0003, Household Goods Descriptive Inventory). For HHG and UB, the contractor will place in a waterproof envelope secured to the No. 1 container: one copy of the inventory; one copy of the DD Form 1299, Application for the Shipment and/or Storage of Personal Property, Figure G-2, and if an overseas shipment, one (1) copy of the member’s/employee’s orders and custom’s document. Additionally, for HHG, the contractor will place an envelope containing the following documents in an easily accessible location inside the No. 1 container: one (1) copy of the packing list and Exception Sheet for shipments released from non-temporary storage (NTS). For UB shipments, the contractor will place one (1) copy of the member’s/employee’s orders inside the carton prior to sealing. The member/employee will be required to furnish all the necessary copies of his or her orders.
j. The contractor(s) will annotate the receiving document or inventory to show any overage, shortage, and damage found, including visible damage to external shipping containers and condition of security seals each time custody of the property changes from a storage contractor (warehouseman) to the contractor or from one (1) contractor to another. When available, the contractor(s) will use the same inventory prepared at origin to verify delivery and condition of the articles at destination.
k. Packing Lists. The contractor(s) will use the packing list figure A-G1-2, Packing List of Household Goods, or a similar format. The CPPSO will advise the contractor as to the required packing list prior to the start date of the contract. The contractor will prepare a packing list at the time the goods are packed, noting the number of each piece, the weight, and the cubic measurement.
6. Appliance Servicing and Unservicing.
Page 12 of 28 Performance Work Statement (PWS)
The contractor(s) will service and unservice appliances IAW manufacturer’s specifications. If third-party servicing or unservicing is required and approved by the CPPSO, the contractor(s) will bill the services as prescribed in Paragraph 4.b.(1).
7. Containers and Vehicles
a. GOCs (Government Owned Containers). GOCs are containers constructed IAW Commercial Standard ASTM-D4169. GOCs also include those containers listed in SDDC Pamphlet 55-12, those meeting ASTM-D6251, and wooden overflow and oversize containers purchased by the government or received by the contractor(s) awarded the Schedule II, Inbound Services contract. GOCs will be used to the extent they are available for Schedule I, Items 0001 through 0005, before using contractor(s)-furnished containers.
(1) GOC’s and contractor(s)-furnished containers will be free of defects (holes, loose or broken framing, missing skids, caulking repairs, or separated plywood). Unacceptable containers are those that have been extended to accommodate oversize or overflow items, any panel bowed or bulging beyond their normal conformity, those with deteriorated plywood (either rotted or delaminated), those caulked on outside seams or joints, and those patched without the use of caulking compound. Patches on the outside surfaces are not acceptable because they increase the overall dimension and are subject to being scraped off during handling. The floor will be solid and all skids installed and in sound condition.
(2) All GOC’s and contractor(s)-furnished containers will conform to United States (U.S.)
Department of Agriculture requirements for Wood Packaging Materials (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM must be constructed from Heat Treated (HT) lumber (HT to 56 degrees centigrade for 30 minutes) and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC), Incorporated, or an equivalent organization recognized by the host nation’s government for WPM procured outside the United States IAW WPM policy and WPM enforcement regulations (https://www.alsc.org). Wood fumigated with methyl bromide is not authorized for use in the shipment of HHGs as damage may occur to the HHGs. All materials must include certification markings IAW ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings will be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load will also comply with International Standards for Phytosanitary Measures Publication No. 15, International Standards for Phytosanitary Measures (ISPM): Guidelines for Regulating Wood Packaging Material (WPM) in International Trade and be marked with an ALSC approved dunnage stamp.
Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. Additional information on WPM requirements can be found at http://www.aphis.usda.gov.
Page 13 of 28 Performance Work Statement (PWS)
b. Containers for articles such as large pieces of marble or glass tabletops that require more protection than the standard packing techniques will be constructed IAW ASTM D6039/D6039M-11, Standard Specification for Crates, Wood, Open and Covered. The contractor(s) will use these containers for interior packing purposes. The contractor(s) will annotate actual dimensions of the item in their pre-approval request and submit to the CPPSO for internal and external crates. Internal crates will not exceed 3 inches beyond any single dimension (length, width, or height) of the item being crated, example: Item 39x71x.05 Crate:
42x74x3.5. The contractor(s) will use external crates only when item dimensions in any one direction (after the 5-inch rule has been applied) exceed those of a Type II container (45”x85”x87” at 195 cu ft) and when approved by CPPSO.
c. Skids. Any container that will be handled with a forklift will be constructed with two (2) or more skids. All wooden containers entering the Defense Transportation System (DTS) with a gross weight of 100 pounds or more or with length and width dimensions of 48 inches by 24 inches or more will be equipped with two (2) skids of not less than a minimum of 3 inches high and 3-1/2 inches wide. Skid sizes will be IAW ASTM-D6251/D6251M-11.
d. Banding. The contractor(s) will band containers of plywood construction IAW Commercial Standard ASTM D3953-15, Standard Specification for Strapping, Flat Steel and Seals, or of equal quality with nonmetal banding.
e. Coopering of GOCs will be performed when authorized by the CPPSO. Patches will not increase the overall container dimensions. The contractor(s) will make all repairs prior to delivery to residence.
f. Vehicles. The contractor(s) will ensure that all vehicles used in the movement of personal property will be of a safe and sound condition so as not to permit damage to personal property.
8. Marking Exterior Shipping Containers. The contractor(s) will mark all GOCs by stenciling letters at least 1 inch high. The contractor(s) will not use freehand marking or felt-tip markers. All old shipment markings will be obliterated prior to delivery to residence. Each container will be stenciled with all required elements prior to departure from the warehouse.
a. Permanent markings on containers will be legible and conform to Commercial Standard ASTM-D4169-16 and SDDC Pamphlet 55-12. The following permanent markings will be stenciled in black letters 1-1/2 inches high, Figures A-G1-3, Location of Permanent Markings on ASTM-D4169-16 Wood HHG Box, and G1-4, Location of Permanent Markings on MIL- STD-1489 HHG Box:
On one side and one end:
USE NO HOOKS
STORE UNDER COVER
US PROPERTY
SDDC APPROVED
In the appropriate places:
CENTER OF BALANCE
Page 14 of 28 Performance Work Statement (PWS)
LIFT HERE
FORKLIFT HERE
b. On Commercial Standard ASTM-D4169-16 and SDDC Pamphlet 55-12 containers, the following additional permanent markings will be stenciled on one side and one end toward the top of the container in black letters 2 inches high. The contractor(s) will stencil the word “UP” with an arrow pointing to the top of the container. Then under “UP” on an orange background not to exceed 8 x 10 inches in black letters approximately 2 inches high, the contractor(s) will stencil “DPM.” The word “EXPEDITE” will be symmetrically spaced below in 1-1/2-inch-high black letters. (See Figures G1-3 and G1-4.)
c. Shipments identified as “BLUEBARK” will be stenciled in 1-inch letters with the code word BLUEBARK above the PPGBL/BL number.
d. As a minimum, the property member’s/employee’s last name will be legibly handwritten or stenciled on all containers for identification purposes prior to departure from the origin residence or other pickup point.
e. Permanent markings on DPM HHG, Figure A-G1-5, Container Marking for Household Goods, and UB, Figure A-G1-7, Markings of Unaccompanied Baggage containers will be legible and conform to Commercial Standard ASTM-D4169-16 and SDDC Pamphlet 55-12.
DPM HHG and UB containers will have a completed Military Shipping Label (MSL) affixed on one side and one end panel for all shipments entering the DTS, except for passenger bags and similar packages, which will have an MSL affixed to one surface. The MSL, Figure G1- 6, Military Shipping Label for Personal Property, requires human-readable information as well as linear and two-dimensional bar codes. The human-readable and linear bar-coded portions of the MSL are prepared as described below and the two-dimensional bar code is prepared IAW Appendix A-R. If the shipping container does not lend itself to the application of the label, or if the label would cover or interfere with other required markings, the label will be attached to a general-purpose tag or a placard. The general-purpose tag or placard will be tied, wired, or otherwise fastened to the shipment unit or movement conveyance.
f. The contactor(s) will place the following listed human readable data and Code 39 linear bar codes on each MSL. Some entries are keyed to numbered blocks on the MSL, and some are in addition to that form’s requirements. The human readable unit of measure will be provided in U.S. standard terms (e.g., pieces, inches, feet, and pounds for measured items) and the data values will be rounded up to the nearest whole number with leading zeros suppressed. Also see Military Standard-129, Department of Defense Standard Practice, Military Marking for Shipment and Storage, and ANSI MH10.8.1.
(1) Transportation Control Number (TCN): Human readable and linear bar code using 1/2-inch-high Code 39 format.
(2) Transportation Account Code (TAC), PPGBL/BL number, and carrier.
(3) From: The consignor Department of Defense Activity Address Code (DODAAC) and in-the-clear address.
(4) Type Service: In-the-clear text (e.g., TGBL Cd J). The clear-text descriptions may be derived from the personal property TCN field 15 descriptions.
Page 15 of 28 Performance Work Statement (PWS)
(5) Ship to/POE: Three-digit air/seaport of embarkation (POE) code, and enough space for 5 lines of up to 35 characters for the in-the-clear address.
(6) Transportation Priority: Bold text 3/4 inches tall.
(7) POD: Three-digit air/seaport of debarkation (POD) code or blank.
(8) Consignee/Mark For: Member’s/Employee’s name, followed by the consignee
DODAAC and/or Mark For in-the-clear address, and linear bar code using 1/2-inch-high Code 39 format.
(9) Weight: Actual gross weight (this piece) with unit of measure. Do not zero fill.
(10) RDD: Three-digit code or blank for Required Delivery Date. Blank for classified unit move.
(11) Cube: Cube (this piece) with unit of measure. Do not zero fill.
(12) Tare Weight: Weight of container before loading personal property.
(13) Date Shipped: Four-position code or in-the-clear date. Blank for unit move.
(14) Net Weight: Weight of personal property loaded into a container.
(15) Piece Number: The piece number (of total pieces) of this shipment and a linear bar code using 1/2-inch-high Code 39 format. Do not zero fill. The piece number and total pieces may be expressed as “Piece Number of Total Pieces” to save space on the label.
(16) Total Pieces: Total number of pieces in this shipment unit. Do not zero fill.
(17) PDF417 2D symbol IAW with Appendix A-R.
NOTE. The contractor(s) will not stencil any Social Security Number on the container(s) unless it is a part of the TCN.
g. The contractor(s) may optionally stencil shipment markings in addition to the MSL on the outside of containers. Freehand marking is not acceptable. Markings will be proportional to the available space on the container. Old markings not applicable to the current shipment will be permanently obliterated before the container’s arrival at the member’s/employee’s residence.
h. Overflow Containers. Overflow containers (Schedule I, Item 0003) will be limited to use for those items that accumulate over and above that which can be packed into an ASTM- D4169-16 or SDDC Pamphlet 55-12 container. The construction of an overflow container will be IAW ASTM-D6251/D6251M-11. The overflow container normally is of lesser size than ASTM-D4169-16 or SDDC Pamphlet 55-12 containers and will be limited to one per shipment.
i. Oversize Containers. Oversize containers (Schedule I, Item 0003) will be limited to use for a single item that exceeds the dimensions of and cannot be accommodated in ASTM- D4169-16 or SDDC Pamphlet 55-12 container and therefore requires a specially built container. One or more of this type may be required per shipment. These containers will be constructed IAW ASTM-D6251/D6251M-11 and the exterior container dimensions furnished to the CPPSO
j. Other Shipments.
Page 16 of 28 Performance Work Statement (PWS)
The contractor(s) will construct containers constructed for other shipments (Schedule I, Item 0003) IAW ASTM-D6251/D6251M-11. Other shipments are defined as small shipments that require a lesser size box (container) than specified in Commercial Standard ASTM-D4169- 16 or SDDC Pamphlet 55-12.
(1) The outbound contractor(s), when directed by the CPPSO, will pick up and store empty GOCs from other local carriers or government facilities within the contract area of performance. When the contract is awarded to different contractors, storage of the GOCs is the responsibility of the outbound contractor(s) unless otherwise directed by the CPPSO. The storage of containers contemplated under this contract means, at a minimum, that containers, if not stored within a building, will be stored in a manner to protect them from precipitation, ground water or other moisture.
(2) GOC Report. The contractor(s) will submit a GOC report (a local form or for Air Force Installations, AF Form 384, Government-Owned Container Control Record). The report will be submitted to the CPPSO 15 days after the contract start date and thereafter on the first workday of each month (CDRL 0005, Report of Government-Owned Containers). The contractor(s) will keep an accurate, up-to-date count of all GOCs.
(3) Serviceable/Unserviceable Containers. The contractor(s) will not commingle serviceable or unserviceable containers. After inspection by the CPPSO, these two categories of containers will be segregated. The CPPSO and contractor(s) will mutually agree upon the inspection and disposition schedule. Unserviceable containers will be disposed of at no cost to the government.
(4) The new outbound contractor(s) will pick up the serviceable empty GOCs from the previous contractor(s) not later than 30 calendar days after commencement of the contract.
9. Outbound Documentation and Movement.
a. The contractor(s) will pick up PPGBL/BL and similar documents covering outbound HHG shipments from the CPPSO each workday or obtain them IAW locally established procedures, such as mail or courier. Distribution of completed PPGBL/BL and TCMDs will be as outlined below.
b. On outbound HHG shipments, the contractor(s) will complete by typing the following information on the original PPGBL/BL and all copies:
(1) Block 26 (Packages). Enter the number and kind of containers, such as 1 F/L or 2
CTNS.
(2) Block 27 (Description of Shipment). Enter the aggregate weight and cube of the total number of each different type of container shown in Block 26.
(3) Block 28 (Weight). Enter the gross, tare, and net weight.
c. On outbound UB shipments, the contractor(s) will provide information on actual pieces, weight, and cube to the CPPSO within 1 day after pickup so that the CPPSO can prepare the PPGBL/BL. Information will include:
Page 17 of 28 Performance Work Statement (PWS)
(1) Packages to include the number and kind of containers, such as 1 F/L, 2 CTNS.
(2) The aggregate weight and cube of the total number of each different type of container.
(3) The gross, tare, and net weight.
d. On all outbound shipments moving by a PPGBL/BL, the contractor will surrender the original and copies 2, 3, and 4 of the PPGBL/BL to the carrier when the shipment is picked
up. The contractor will return copies 5, 6, and 7 of the PPGBL/BL to the CPPSO not later than the close of business the next workday after the day the shipment is picked up (CDRL 0008, Bill of Lading). Computer-generated PPGBL/BLs are not numbered. In instances where the contractor uses computer-generated PPGBLs/BLs, the contractor will make enough copies to ensure the right number of copies are submitted. All copies of the PPGBL/BL returned to CPPSO will bear a legible pickup date, contractor pro number stickers, and signature of the contractor’s representative. The contractor will furnish CPPSO the completed inventory, packing list, and weight tickets not later than four (4) workdays from the date of pickup for HHG and three (3) workdays from the date of pickup for UB shipments.
e. On outbound overseas shipments, the contractor(s) will complete by typing the following information on the original TCMD (Figure A-G1-10) and all copies:
(1) Block 22 (Pieces). Enter the total number of pieces in the shipment.
(2) Block 23 (Weight). Enter the gross, tare and net weight.
(3) Block 24 (Cube). Enter the total cube of the shipment.
f. The contractor(s) will place one (1) completed copy of the TCMD in the waterproof envelope on the number one (1) container, give three (3) copies to the carrier, and return one annotated copy to the Contracting Officer’s Representative.
g. If any container being prepared to enter the DTS has an outside measurement greater than 84 inches, the contractor is required to prepare an Outsized Air Cargo Report (CDRL 0011).
h. Carrier Pickup of Shipments. Within one (1) workday after the property is ready for shipment, the contractor will contact the assigned carrier, as indicated on the PPGBL/BL, to arrange for pickup. When shipments are not picked up by the assigned carrier by close of business of the next workday, after contractor notification, the contractor will notify the CPPSO of the carrier’s failure to pick up the shipment not later than 9 a.m. of the next workday.
i. For outbound shipments requiring drayage to an air or sea terminal within the contract area of performance, the contractor(s) will deliver the shipment to the designated terminal within five (5) workdays of the request by the CPPSO for UB or within six (6) workdays of a request by the CPPSO for HHG. For shipments drayed to a terminal, the contractor(s) will return the delivery receipt or transfer document to the CPPSO not later than the next workday following delivery.
j. The contractor(s) will submit a weekly report showing outbound shipments on hand which were picked up prior to the previous Wednesday (CDRL 0009, Contractor’s Weekly Report).
Page 18 of 28 Performance Work Statement (PWS)
k. When the contractor’s facility is located in a town, city, or metropolitan area other than the location of the CPPSO, telephone notification of containerization or arrival of shipments will be considered as meeting the requirements for written notification. However, the contractor(s) will mail the written notification to the CPPSO within one (1) workday following the day of telephone notification.
l. On outbound overseas shipments entering the DTS, the contractor(s) will prepare and affix a two-dimensional and linear barcoded MSL as described in Paragraph 8.f and Appendix A-R.
10. Storage.
a. Identification. The contractor(s) will identify all outbound shipments by the member’s/employee’s name, PPGBL/BL number, and call or lot number. Such identification will be in plain view on each lot.
b. Vehicles will not be used for the storage of shipments. Pickup and drayage include placing the goods within the facility on the pickup date specified in the order; however, at the latest, the contractor(s) will place the shipment in the facility no later than the day following pickup.
When the contractor(s) chooses to allow the personal property to remain on the truck until the next working day, the contractor(s) will be held liable for any loss or damage occurring during this time without regard to cause.
c. The contractor(s) will store all personal property to maintain a minimum of two (2) inches of clearance from the floor to the undermost portion of the personal property. This elevation requirement will apply after three (3) workdays handling-in period. The contractor(s) will protect items always waiting for the completion of handling-in services. In addition, the contractor(s) will not store the property in contact with exterior walls. Height of HHG stacked loose will not exceed 10 feet. Extension ladders, TV antennas, swing sets, and similar items are excluded from this height requirement.
d. Shipping Containers. The contractor(s) will ensure that no contents of containerized shipments are removed from containers when placed in storage. Shipment will not be decontainerized prior to delivery to residence unless ordered by the CPPSO.
e. Storage Charges. The contractor(s) will not commence storage charges for outbound HHG and UB shipments earlier than the sixth (6th) workday following the date of CPPSO’s receipt of the contractor’s notification of completion of containerization service. Storage charges will apply for each 30-day period or computed as a fraction thereof. Date of release from storage will not be considered in computation of storage charges.
f. The contractor(s) will not commence storage charges for inbound HHG and UB shipments earlier than the sixth (6th) workday following the date of contractor’s notification to the CPPSO of arrival of shipment. Storage charges will apply for each 30-day period or computed as a fraction thereof. Date of release from storage will not be considered in computation of storage charges.
Page 19 of 28 Performance Work Statement (PWS)
g. When the contractor(s) cannot release a shipment from storage or deliver a shipment on the date requested by the CPPSO, the storage charges will cease on the requested date instead of the actual date of release.
h. The contractor(s) will submit an on-hand report for all inbound shipments at the contractor’s facility (CDRL 0010, Report of Shipments on Hand). This report will list all inbound shipments in storage and/or waiting to be delivered. Negative reports are required.
The CPSSO will identify when reports are to be submitted.
i. The CPPSO will follow Service guidelines when authorizing additional storage. The CPPSO will notify the contractor(s) of the expiration date of storage at government expense.
11. Facilities.
Contractor’s facilities will meet the guidelines outlined in Appendix A-D.
a. Inspection of Contractor’s Facility. The contractor’s facility will be initially inspected and approved by a representative from the contracting office or CPPSO for compliance with this contract and the standards and regulations stated or referenced therein. Thereafter, inspections will be on a quarterly basis or, if deemed necessary, on a more frequent basis. Inspections will be conducted using Appendix A-E. If a facility is found to be unsatisfactory, the facility may be declared ineligible to store HHG or UB under the contract. The contractor(s) will then furnish alternate storage facilities without any additional cost to the Government and if it cannot, then it may be declared ineligible to receive further orders under this contract.
b. Upon receipt of contract award, the contractor(s) will furnish to the contracting officer evidence of the kinds and minimum amounts of insurance covering work to be performed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .