About this file

Attachment 2, PWS, Estimated Workload Data Per Year and Equipment list

View the file

Other files

File Type Posted
Pre-Proposal_Conf_Minutes_14_June_17.pdf PDF
Atch_3_Clauses_and_Provisions.pdf PDF
Atch_4_PPQ.pdf PDF
Atch_1_Pricing_Schedule.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

For

Maintenance, Safety Inspections, and Repairs of

Elevators and Escalators in the Kaiserslautern

Military Community (KMC) Area

Kaiserslautern Military Community Ramstein Air Base

12 May 2017

1. DESCRIPTION OF SERVICES/GENERAL INFORMATION. These services are considered to be non-mission essential. The contractor shall provide all non-personal services, management, tools, supplies, equipment, and labor necessary to perform preventive maintenance, safety inspections, and repairs of elevators and escalators in the Kaiserslautern Military Community (KMC), Ramstein Air Base, Landstuhl-Kirchberg, Kaiserslautern-Vogelweh and Kaiserslautern-Kapaun, in a manner that shall ensure continuous and safe operation. All maintenance, inspection, and repair work shall be performed in accordance with (IAW) standard German commercial practices and IAW German local, state, and federal applicable standards and codes, manufacturer recommendations and all required safety regulations (see paragraph 5). The most stringent of these shall apply. Services as requested herein shall be performed only by qualified personnel trained for the service on Elevators. Personnel and freight elevators driven by cable, hydraulic and chain wheel consist of commercial and industrial type IAW Appendix B, Equipment List.

1.1 MAINTENANCE SERVICES. The contractor shall provide quarterly preventive maintenance IAW DIN EN 13015 on elevators and escalators at the locations designated in attached Appendix B, Equipment List, to ensure reliable and continuous safe operation. Maintenance and Service of Subscriber Identity Module (SIM- Card`s) and operation of Global System for Mobile Communications (GSM) wireless data module transmitters, includes replacement of all expired batteries and service to operate Emergency Call Systems (ECS), listed in the attached Appendix B, Equipment List. All work shall follow the contractor’s quality control plan, see paragraph 1.7.

1.2 SAFETY INSPECTIONS. The contractor shall perform annual safety inspections through accredited surveillance associations (for example TUEV – Technischer Ueberwachungsverein, DEKRA) on all elevators and escalators listed in the attached Appendix B, Equipment List. All safety inspections shall be performed by the date(s) shown on the written schedule IAW paragraph 1.4.1.

1.3 REPAIR SERVICE CALLS. The contractor shall notify the Contracting Officer Representative (COR) of all projected downtime and estimated time for repair. All work shall follow the quality control plan stated in the PWS, paragraph 1.7. All work shall be documented with date and time of repair service call, location of elevators to be repaired, repair services performed, and name of personnel performing repair service for each elevator and escalator. All repairs shall be completed within the time specified, see paragraphs 1.3.1 and 1.3.2, unless required parts are not available. When required parts are not available, the contractor shall notify the COR the same business day it is discovered. The contractor shall provide written documentation (for example, a letter from the parts manufacturer) to the COR explaining why the required repair time cannot be met. The contractor shall complete the repair within one (1) normal business day after receiving the required parts.

1.3.1 ROUTINE REPAIR. The COR will notify the contractor of routine repairs to be made. The contractor shall report to the work location within 4 hours after notification, survey the repair, and provide the COR with an estimated cost of material/parts no later than one (1) normal business day after survey. The part costs submitted by the contractor shall include all parts required for repair, part numbers for identification and net price for each part for repair work. The contractor shall commence repair work only after receiving notification from the CO or COR. Repairs shall be completed within one (1) normal business day after receiving notification, unless the parts are not available. The contractor shall supply parts IAW paragraph 1.5.

Elevators and escalators shall be in good and safe working conditions after repair.

1.3.2 EMERGENCY REPAIR. The COR will notify the contractor of emergency repairs to be made. The contractor shall report to the work location within 90 minutes after notification, survey the repair, and provide the COR an estimated cost of material/parts 2 hours after survey. The cost estimate submitted by the contractor shall include a list of parts required for repair, part numbers for identification, and net price for each part and identify the projected labor hours required for repair work. The contractor shall commence repair work only after receiving notification from the CO or COR. Repairs shall be completed within one (1) normal business day after receiving notification, unless parts are not available. The contractor shall supply parts IAW paragraph 1.5. Elevators and escalators shall be in good and safe working conditions after repair.

1.4 REQUIRED DOCUMENTATION

1.4.1 SCHEDULES. The contractor shall furnish a written schedule for all preventive maintenance and safety inspections to the designated CO or COR no later than 7 normal business days after award of contract, and thereafter annually not later than 7 July of the following contract year. The schedule shall include the date, times and the location. Any schedule changes shall be coordinated in writing between the contractor and the COR at least 7 normal business days prior to the original scheduled dates.

1.4.2 INSPECTION AND MAINTENANCE REPORTS. The contractor shall submit safety inspection and maintenance reports to the COR within 2 normal business days of completion of the inspection or maintenance. Inspection and Maintenance reports shall include the following at a minimum: Identification of the elevator(s) or escalator(s), location, maintenance work performed, repairs needed, date of inspection, personnel performing service, inspector and overall condition of the elevators or escalators.

1.4.3 REPAIR REPORT. The contractor shall submit repair reports to the COR within 2 normal business days of completion of the repair. Repair reports shall include the following at a minimum: Identification of the elevator(s) or escalator(s), location, work performed, date of repair, labor hours, name of personnel that performed the repair service.

1.4.4 LOGBOOKS. The contractor shall update all logbooks for each elevator and escalator after the safety inspections IAW paragraph 1.2. Logbooks are available at the Service Contract Management Office, Building 502, Ramstein Air Base (06371-47-4879 or DSN 480-4879). If logbooks become lost or damaged while under the control of the contractor, the contractor shall procure new logbooks from the manufacturer at no additional cost to the government. After completion of service, all logbooks shall be returned to the Service Contract Management office within 5 normal business days.

1.5 PARTS AND MATERIAL. The contractor will be reimbursed for all parts needed for repairs. A FFP for Parts will be negotiated per repair service call as required. Replacement parts and associated costs shall be approved by the COR and Contracting Officer prior to purchase by the contractor. Parts and materials shall comply with manufacturer recommendations. A copy of the manufacturer/wholesaler’s invoice, to include shipping and handling charges, shall be attached to the applicable invoice as proof of the amount paid for parts.

1.6 WASTE DISPOSAL. All trash and hazardous waste shall be disposed of off base at no additional cost to the Government, IAW German Waste Disposal Law.

1.7 QUALITY CONTROL. The contractor shall have and maintain a quality control program to ensure maintenance and repair services are performed IAW standard German commercial practices and IAW German local, state or federal applicable standards and codes and manufacturer’s recommendations. The contractor shall have and implement procedures to identify and prevent defective services from recurring. At a minimum, the contractor shall have quality control procedures that address the areas identified in Paragraph 2, Services Summary.

The contractor shall assign a specific quality control inspector for this contract and provide the name and telephone number in writing to the CO and COR within 5 normal business days after contract award date.

1.8 HOURS OF OPERATION. The contractor shall perform all work to be accomplished IAW this PWS during regular working hours between 0700 – 1600 hours, Monday to Friday except on German and American holidays which can be found at https://de.usembassy.gov/holiday-calendar/.

1.9 SECURITY REQUIREMENTS. All personnel employed by the contractor in the performance of this PWS and any representative of the contractor entering the Government installation in the performance of this PWS, shall abide by all security regulations of the installation and obtain a certificate of good personal conduct (Polizeiliches Fuehrungszeugnis) in order to register at the Pass Office for a base pass.

https://de.usembassy.gov/holiday-calendar/

1.10 PERFORMANCE OF SERVICES DURING MILITARY EXERCISES OR OPERATIONS. Work stoppages may occur during the execution of this contract due to military exercises or operations. During these times, access to areas supporting the exercise or operation may be curtailed or not allowed. During scheduled and unscheduled exercises or operations, the contractor shall be prepared to move to other work locations or suspend operations at no additional cost to the U.S. Government and coordinate the rescheduling of the work with the COR.

1.11 CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS. The Contractor shall perform work under this PWS consistent with the relevant environmental policies and objectives identified in the installation Environmental Management System (EMS) applicable for this contract. The Contractor shall perform work in a manner that conserves water, energy and other resources to the maximum extent feasible and ensure minimum production of waste as possible, giving preference to recycling and reutilization opportunities. Furthermore, the Contractor shall give preference to less toxic materials whenever available and still reliable for their work. In the event an environmental nonconformance or noncompliance of host nation and United States Air Force (USAF) environmental laws and regulations associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the EMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the environmental management system on base and how these requirements affect their work performed under this PWS.

All on-site contractor personnel shall receive the installation EMS awareness level information.

The contractor shall perform all work in accordance with applicable German and US Air Force environmental laws, regulations and operating standards, including but not limited to the Final Governing Standards (FGS) for Germany. The contractor shall be immediately capable of understanding and addressing environmental laws and regulations as they pertain to work performed under this PWS.

The Contractor shall always choose most environmentally friendly expendable items needed for this service, preferably with "blauer Engel" symbol.

1.12 CONTRACTOR MANPOWER REPORTING. The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) for performance of services provided under this contract for the Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported at any time during the FY, all data shall be reported not later than 31 October of each calendar year. The Contractor may direct questions to the Contractor Manpower Reporting (CMRA) help desk.

1.12.1 USES AND SAFEGUARDING OF INFORMATION. Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

1.12.2 USER MANUALS. Data for the Air Force service requirements shall be input at the Air Force CMRA link. However, user manuals for Government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

http://www.ecmra.mil/ http://www.ecmra.mil/

2. SERVICES SUMMARY

Performance Objective PWS Para Performance Threshold SS-1. Perform Quarterly Preventive Maintenance Quarterly preventive maintenance is performed IAW

DIN EN 13015.

1.1 No more than 1 deficiency per

quarter.

SS-2. Perform Annual Safety Inspections Safety inspections are properly performed on all elevators and escalators by the date specified in the written schedule.

1.2, 1.4.1 No deficiencies.

SS-3. Repair Service Calls Response and repairs are made within the specified time.

1.3 1.3.1 1.3.2

No deficiencies.

SS-4. Submit Maintenance and Inspection Reports Accurate reports are delivered within 2 normal business days after completion of maintenance, repair, or inspection.

1.4.2, 1.4.3

No more than one (1) deficiency per quarter for maintenance reports, and one (1) deficiency per year for inspection reports; No more than 1 out of 5 repair reports may be late

SS-5. Logbooks Logbooks shall be properly documented and returned to the designated office within 5 normal business days after completion of work.

1.4.4 No deficiencies.

3. U.S. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1 UTILITIES. The U.S. Government will furnish electricity and water in the performance of services in this contract.

3.2 DAMAGE TO U.S. GOVERNMENT PROPERTY. The contractor shall report all damages to U.S.

Government property within one hour after occurrence to the 786 CEOES Service Contract section, 06371-47- 4879. The contractor shall be responsible for reimbursing the U.S. Government no later than 30 calendar days of receipt of claim for all costs associated with damages to U.S. Government property in the performance of services in this contract.

4. CONTRACTOR PERSONNEL.

4.1 CONTRACT MANAGER. The contractor shall provide the name(s) and telephone number(s) of a contract manager (primary and alternate) who shall be responsible for the performance of work and shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract. The contract manager shall be available during normal hours of operation (0700-1600). The contractor shall be able to meet with the CO and COR to resolve any contract issues. The contract manager and alternate shall be able to able to speak English with sufficient structural accuracy and vocabulary to participate in formal conversations on topics surrounding this service. The contractor shall provide to the CO and COR, five (5) normal business days after award, the names, addresses and home phone numbers of the contract manager, and an alternate with authority to act for the contractor if the contract manager cannot be contacted prior to starting performance. Any required changes to this listing shall be submitted in writing to the CO and COR ten (10) business days prior to the change taking effect.

4.2 OTHER PERSONNEL. At least one individual per work team shall be able to understand and speak a minimum level of conversational English at language proficiency to satisfy minimum courtesy requirements and maintain very simple face-to-face conversations on familiar topics. Sufficient comprehension to read very simple written material. Supervisors and management personnel shall be able to read, write and understand conversational and technical English. The contractor shall provide a list of names including passport number of all the people working under this contract to the CO and COR. Any required changes to this listing shall be submitted in writing to the CO and COR ten (10) business days prior to the change taking effect.

5. APPLICABLE STANDARDS, LAWS AND REGULATIONS

The below list may not be complete and all inclusive. The contractor shall observe and abide by all standards, laws and regulations related to the maintenance and safety inspections of elevators and escalators, even if not listed.

DIN EN 13015 Instandhaltung von Aufzuegen und Fahrtreppen – Regeln fuer Instandhaltungsanweisungen / Maintenance for Lifts and Escalators – Rules for Maintenance Instructions

VDI 3810 Blatt 6/Part 6 Richtlinie zum Betreiben und Instandhalten von gebaeudetechnischen (Verein Deutscher Ingenieure/ Anlagen – Aufzuege / Guideline for the Operation and Commissioning of Association of German Engineers) Building Installations – Lifts

TRBS Technische Regeln fuer Betriebssicherheit / Technical Rules for Operational

Safety

BetrSichV (Betriebssichertheitsverordnung) / Industrial Safety Regulation

UVV (Unfallverhuetungsvorschriften) / Accident Prevention Regulation

6. CONTRACTOR QUALIFICATIONS/CERTIFICATIONS

6.1 The contractor shall be DIN EN 13015 certified as of contract start date and continue through the life of the contract. The Government reserves the right to request verification of the certificate during contract performance.

7. APPENDICES

A. Estimated Workload Data B. Equipment List

APPENDIX A

ESTIMATED WORKLOAD DATA PER YEAR

BASE YEAR

ITEM NAME ANNUAL ESTIMATED

QUANTITY

1 Quarterly Preventive Maintenance 183 each

2 Annual Main Safety Inspection 61 each

3 Routine Repair Service Calls (average 5 hours per call – 885 hours annually)

177 each

4 Emergency Repair Service Calls (average 2 hours per call – 52 hours annually)

26 each

OPTION YEARS ONE (1) THROUGH FOUR (4)

ITEM NAME ANNUAL ESTIMATED

QUANTITY

1 Quarterly Preventive Maintenance 244 each

2 Annual Main Safety Inspection 61 each

3 Routine Repair Service Calls (average 5 hours per call – 885 hours annually)

177 each

4 Emergency Repair Service Calls (average 2 hours per call – 68 hours annually)

34 each

The above stated quantities are estimates only. Increases of the individual items up to 10% are considered to be within the scope of the contract.

NOTE:

1. For each elevator/escalator being added during the course of the contract the following shall apply:

(a) If an elevator/escalator is added during the first 6 months of the fiscal year,

(i) the annual estimated quantity of routine repair hours is increased by 10 hours in item 3 of the Estimated Workload Data Per Year, which equals 2 additional Routine Repair Service Calls in item 3.

(ii) The annual estimated quantity of emergency repair hours is increased by 2 hours in item 4 of the Estimated Workload Data Per Year, which equals one (1) additional Emergency Repair Service Call in item 4.

(b) If an elevator/escalator is added during the second 6 months of the fiscal year

(i) the estimated quantity of routine repair hours is increased by 5 hours in item 3 of the

Estimated Workload Data Per Year, which equals one (1) additional Routine Repair Service Calls in item 3.

(ii) the estimated quantity of emergency repair hours will not be increased and no additional Emergency Repair Service Call will be added to item 4.

2. For each routine repair service call purchased in excess of/less than the annual estimated quantity identified in item 3 of the Estimated Workload Data Per Year, the annual estimated quantity of routine repair hours is increased/decreased by 5 hours in item 3 of the Estimated Workload Data Per Year.

3. For each emergency repair service call purchased in excess of/less than the annual estimated quantity identified in item 4 of the Estimated Workload Data Per Year, the annual estimated quantity of emergency repair hours is increased/decreased by 2 hours in item 4 of the Estimated Workload Data Per Year.

APPENDIX B

ESTIMATED EQUIPMENT LIST

# Location Manufacturer Year of Manufacturing Type Serial Number Capacity Stops Driven by

Lifting

Shaft Doors

GSM

Modules Installed

(ECS)

Height

(Meter)

1 Ramstein AB Haushahn 2010 Personnel 10425227 1600 kg 6 Cable 10,00 6 Horizontal, one-sided, two-bladed No

2 Ramstein AB Schindler 2013 Personnel 10014296 1000 kg 6 Cable 19,87 6 Two-bladed sliding doors No

3 Ramstein AB Otis 2002 Personnel 47NP2919 800 kg 3 Hydraulic 7,13 3 Sliding doors yes

4 Ramstein AB Otis 1998 Personnel 47NK6866 1000 kg 4 Cable 8,99 4 Sliding doors Yes

5 Ramstein AB Haushahn 2007 Personnel 10294866 1600 kg 2 Cable 5,00 2 Sliding doors No

6 Ramstein AB S&S 2007 Personnel 324595 630 kg 3 Cable 5,49 3 Two-bladed sliding doors No

7 Ramstein AB Kasper 1990 Personnel- Freight 90-1651 5000 kg 2 Hydraulic 8,30 2 Four-part sliding doors No

8 Ramstein AB S&S 2010 Personnel 333509 2000 kg 3 Cable 13,53 3 Sliding doors No

9 Ramstein AB S&S 2010 Personnel 333510 1600 kg 2 Cable 6,90 2 Sliding doors No

10 CTS-Ramstein S&S 2006 Personnel 319282 630 kg 2 Cable 3,08 2 Sliding doors No

11 Vogelweh-KL ATB Aufzuege 2005 Personnel 14241555 630 kg 4 Hydraulic 6,57 4 Two-part, side-opening sliding doors No

12 Vogelweh-KL S&S 1999 Freight 54 724 300 kg 5 Chain wheel 11,30 5 Sliding doors No

13 Ramstein AB Loedige 2009 Freight 748/85167 2000 kg 3 Chain wheel 6,13 3 Rotating hinged doors No

14 Ramstein AB S&S 2014 Personnel 352394 1000 kg 2 Cable 3,80 2 Sliding doors, horizontal, one-sided, two-bladed No

15 Ramstein AB Beech Engin. 2005 Freight 6996282 250 kg 2 Chain wheel 5,00 2 Horizontal sliding doors, manually operated No

16 Ramstein AB Beech Engin. 2005 Freight 6996281 1500 kg 3 Chain wheel 5,00 3 Hand-operated 2-sided revolving door No

17 Ramstein AB ATB Aufzuege 2011 Personnel- Freight 20090804 1250 kg 5 Cable 12,00 5 2-part, side-opening No

18 Ramstein AB Walter Mayer 1995 Personnel 17 580 1000 kg 2 Hydraulic 3,09 2 Telescopic sliding doors Yes

19 Ramstein AB Haushahn 2005 Personnel 42004312 1275 kg 3 Hydraulic 7,30 3 Sliding doors, horizontal, one-sided, two-bladed No

20 Ramstein AB S&S 2007 Personnel 325656 1000 kg 4 Cable 8,20 4 Sliding doors No

21 Ramstein AB S&S 1999 Personnel 54775 1600 kg 4 Hydraulic 8,40 4 Sliding doors No

22 Ramstein AB Otis 2003 Personnel 47NP7342 630 kg 2 Cable 3,50 2 Sliding doors No

23 Ramstein AB Otis 2003 Personnel 47NP7344 800 kg 2 Hydraulic 3,50 2 Sliding doors Yes

24 Ramstein AB Otis 2003 Personnel- Freight 47NP7343 1300 kg 4 Hydraulic 8,40 4 Sliding doors No

Lifting

Shaft Doors

GSM

Modules Installed

(ECS)

Height

(Meter)

25 Ramstein AB Haushahn 2007 Personnel 1210706 1275 kg 2 Cable 3,80 2 Horizontal, one-sided, two-bladed Yes

26 Ramstein AB Walter Mayer 2004 Freight 21730 500 kg 2 Chain wheel 3,10 2 One-bladed revolving door No

27 Ramstein AB S&S 2005 Personnel 92 023 630 kg 2 Cable 5,5 2 Sliding doors No

28 Ramstein AB S&S 2002 Personnel 54891 630 kg 2 Cable 3,87 2 Sliding doors Yes

29 Ramstein AB TAT 2014 Personnel 42758 1275 kg 2 Cable 5,04 2 Sliding doors No

30 Ramstein AB S&S 2004 Personnel 54983 630 kg 2 Cable 3,6 2 Sliding doors No

31 Ramstein AB Paul Schmitt 1986 Personnel 21269 630 kg 10 Cable 24,75 10 Sliding doors Yes

32 Ramstein AB Otis 1994 Freight 47KH 7749 500 kg 3 Hydraulic 2,73 3 Hand-operated bay revolving doors No

33 Ramstein AB WAF 1986 Freight 216586 1500 kg 2 Hydraulic 4,91 2 Two-bladed revolving door No

34 Ramstein AB Gebhardt 1998 Freight 981750 500 kg 2 Chain wheel 12,00 2 Two-bladed revolving door, hand-operated No

35 Kapaun-KL Otis 2004 Personnel 47NP9841 800 kg 3 Cable 5,80 3 Sliding doors Yes

36 Kapaun-KL Hiro Lift 2011 Handicap 112431-320 500 kg 2 electrical drive mechanical

2,80 N/A N/A No

37 Kapaun-KL Hiro Lift 2011 Handicap 112432-320 500 kg 2 electrical drive mechanical

2,80 N/A N/A No

38 Kapaun-KL Becker 2015 Personnel 14JB324 1125 5 Cable 12,25 5 Horizontal, one-sided, two-bladed No

39 Ramstein AB Thyssen Krupp 2005 Personnel 283205031 1000 kg 2 Cable 4,00 2 Two-bladed sliding doors Yes

40 Ramstein AB Haushahn 2004 Personnel 42004260 1600 kg 8 Cable 10,76 8 Sliding doors, horizontal, centered, two-bladed No

41 Ramstein AB Haushahn 2004 Personnel 42004259 1600 kg 8 Cable 10,76 8 Sliding doors, horizontal, centered, two-bladed No

42 Ramstein AB Alois Kasper 2004 Personnel 2103N10 1600 kg 2 Cable 5,10 2 Sliding doors No

43 Ramstein AB S&S 2000 Personnel 54753 1000 kg 2 Cable 5,03 2 Sliding doors Yes

44 Ramstein AB S&S 1999 Personnel- Freight 54754 1000 kg 2 Cable 5,03 2 Sliding doors Yes

45 Ramstein AB Thyssen Krupp 2004 Personnel 283203002 1550 kg 3 Cable 8,05 3 Sliding doors, two-bladed No

46 Ramstein AB Thyssen Krupp 2004 Personnel 283203003 1550 kg 2 Cable 5,08 2 Sliding doors, two-bladed No

Lifting

Shaft Doors

GSM

Modules Installed

(ECS)

Height

(Meter)

47 Ramstein AB Thyssen Krupp 2004 Personnel 283203004 1550 kg 2 Cable 5,08 2 Sliding doors, two-bladed No

48 Ramstein AB S&S 2004 Personnel 54973 1325 kg 4 Cable 12,00 4 Sliding doors No

49 Ramstein AB Thyssen Krupp 2005 Personnel 283205026 1350 kg 10 Cable 36,60 10 Sliding doors, three-bladed No

50 Ramstein AB Thyssen Krupp 2005 Personnel 283205027 1000 kg 10 Cable 36,60 10 Sliding doors, two-bladed No

51 Ramstein AB Thyssen Krupp 2005 Personnel 283205028 1000 kg 10 Cable 36,60 10 Sliding doors, two-bladed No

52 Ramstein AB Thyssen Krupp 2005 Personnel 283205029 1000 kg 10 Cable 36,60 10 Sliding doors, two-bladed No

53 Ramstein AB Thyssen Krupp 2005 Personnel 283205022 750 kg 2 Cable 6,00 2 Sliding doors, two-bladed No

54 Ramstein AB Thyssen Krupp 2005 Personnel 283205023 1250 kg 10 Cable 36,60 10 Sliding doors, two-bladed No

55 Ramstein AB Thyssen Krupp 2005 Personnel 283205025 1250 kg 2 Cable 6,00 2 Sliding doors, two-bladed No

56 Ramstein AB Thyssen Krupp 2005 Personnel 283205024 1500 kg 2 Cable 6,00 2 Sliding doors, two-bladed No

57 Ramstein AB Thyssen Krupp 2005 Personnel- Freight 2832005030 2700 kg 2 Cable 7,05 2 Sliding doors, two-bladed No

58 Ramstein AB Thyssen Krupp 2005 Escalator 65603176-001 7.05 m N/A N/A 7,05 N/A N/A No

59 Ramstein AB Thyssen Krupp 2005 Escalator 65603176-002 7.05 m N/A N/A 7,05 N/A N/A No

60 Ramstein AB Lift Service 2010 Personnel 4091706 1125 kg 2 Hydraulic 5,20 2 Sliding doors No

61 Landstuhl TAT 1999 Freight 91800 300 kg 5 Cable 11,30 5 Hand operated No

Performance Work Statement (PWS)
For

File details come from the government source that posted it. Updated .