PERFORMANCE WORK STATEMENT

FOR

PREVENTIVE MAINTENANCE, SAFETY

INSPECTIONS & REPAIR OF

POP UP BARRIERS, TIRE SHREDDERS,

BOLLARDS, ARM BARRIERS & SLIDING GATES

IN THE

KAISERSLAUTERN MILITARY COMMUNITY

(KMC)

26 April 2016

Table of Contents

Section Number and Title Page Number

1.0. Description of Services

2.0. Services Summary

3.0. Government Furnished Property and Services

4.0. Appendices

A. Estimated Workload Data Per Year

B. Current Equipment List

PERFORMANCE WORK STATEMENT (PWS)

FOR

PREVENTIVE MAINTENANCE, SAFETY INSPECTIONS & REPAIR OF POP UP BARRIERS, TIRE

SHREDDERS, BOLLARDS, ARM BARRIERS & SLIDING GATES IN THE KAISERSLAUTERN

MILITARY COMMUNITY (KMC)

1. DESCRIPTION OF SERVICES. The contractor shall provide all non-personal services, management, tools, supplies, equipment, and labor necessary to perform preventive maintenance (PM), safety inspections and repairs of pop up barriers, tire shredders, bollards, arm barriers and sliding gates in the Kaiserslautern Military Community (KMC) in a manner that shall ensure safe and continuous operation. Every aspect of the service of barriers and gates shall be performed in accordance with (IAW) the standards set forth in this PWS.

1.1. TECHNICAL DESCRIPTION OF EQUIPMENT. All pop-up barriers, tire shredders and bollards, and approximately 80% of the arm barriers are hydraulically operated. All sliding gates are electrically operated.

Barriers and gates consist of commercial and industrial types. The barriers and gates consist of structural framework with electrical system (excluding wireless remote control), electrical motor, hydraulic system, hydraulic lines/hoses, and a mechanical hydraulic system for manual operation, IAW Appendix B, Current Equipment List.

1.2. QUALIFICATIONS. Contractor technicians shall have knowledge of the current German safety and accident prevention regulations and the usage of guidelines and generally recognized rules of engineering IAW commercial practices, to be able to assess the proper condition of the equipment.

1.3. PREVENTIVE MAINTENANCE SERVICES/SAFETY INSPECTIONS. The contractor shall perform PM and safety inspections on all pop-up barriers, tire shredders, bollards, arm barriers and sliding gates IAW manufacturer specifications, including use of specified grease, lubricants, and Safety Regulations “Unfallverhütungsvorschriften (UVV)” (English translation: Accident Prevention Guidelines). Safety inspections shall be performed by accredited surveillance associations (for example TUEV – Technischer Ueberwachungsverein, DEKRA), or by the contractor’s certified experts (“befaehigte Person”). During preventive maintenance/safety inspections, all pop-up barriers, tire shredders, bollards, arm barriers and sliding gates shall be tested for full functionality and a report stating this was accomplished shall be given to the COR no later than 8 business days after completion.

1.3.1. PM and safety inspections shall be performed IAW the following:

1.3.1.1. Semi-annual maintenance in the months of October and April for pop-up barriers, bollards, and tire shredders.

1.3.1.2. Annual maintenance and safety inspections in the month of April on arm-barriers and sliding gates, IAW BGR (Berufsgenossenschaftliche Regeln) 232 “Richtlinien für kraftbetriebene Fenster, Türen und Tore” (English translation: Trade Association Rules 232 “Guidelines for power driven windows, doors, and gates”).

1.3.1.3. Maintenance and safety inspections shall include, but are not limited to fuses, main unit/switches, frame/structural integrity, hydraulic main unit and control block, hydraulic cylinders, lines/pipes, oil pressure, greasing of lube points and overall general condition, IAW manufacturer recommendations and specifications.

1.3.1.4. The contractor shall submit a written maintenance and safety inspection report to the Contracting Officer Representative COR within eight (8) business days after completion of work. The report shall be based on the requirements located in BGG (Berufsgenossenschaft Grundsatz ) 950, “BG-Grundsatz, Prüfbuch für kraftbetätigte Tore und Tueren" (English translation: Trade Association Principle 950 - Logbook for Power Driven Windows, Doors, and Gates). The report shall include, but is not limited to:

(a) Date and time of the service

(b) Location, equipment/serial number and type (i.e. pop up barrier, tire shredder, bollard, arm barrier or sliding gate)

(c) Full functionality test

(d) Overall condition including discrepancies cited and repairs needed

(e) Service performed and parts required

(f) Amount of time spent on inspection

(g) Name of the technician performing the service

1.4. REPAIR SERVICE. All repair work shall be IAW standard commercial practices using parts specified by the equipment manufacturers, or items of equal or higher quality. Downtime of equipment shall be kept to an absolute minimum. The contractor shall notify the COR in writing (e-mail is acceptable) about the status of the repair service by the next business day. When required parts are not available, the contractor shall notify the COR in writing (e-mail is acceptable) the next business day it is discovered. The contractor shall provide written documentation (for example, a letter/email from the parts manufacturer) to the COR explaining any delays in delivery of the parts, as described in paragraph 1.4.1. and 1.4.2. The contractor shall complete the repair within one business day or as scheduled with the COR after receiving the required parts from the manufacturer. Travel time will not be reimbursed separately.

1.4.1. SCHEDULES. The contractor shall furnish a written schedule for all preventive maintenance and safety inspections to the designated CO or COR no later than seven (7) business days after award of contract, and thereafter annually not later than 7 October of the following fiscal year. The schedule shall include the date, times and the location. Any schedule changes shall be coordinated in writing between the contractor and the COR at least seven (7) business days prior to the original scheduled dates.

1.4.2. ROUTINE REPAIR SERVICE CALLS (Monday – Friday and US Federal Holidays: 0700 – 1600).

The COR will notify the contractor of required repairs. The contractor shall report to the work location within two

(2) hours after verbal/email notification by the COR. The contractor shall survey the repair and provide a repair estimate for material only not later than one (1) business day after receiving the requested prices of the required parts. The repair estimate will also include the estimated time necessary for the repair. The contractor shall provide written documentation (for example, a letter/email from the parts manufacturer) to the COR proving the requested price information/delivery time could not be obtained within five (5) business days after the survey. The repair estimate shall be submitted to the Contracting Officer (CO) and COR. The contractor shall not make any repairs until written approval is received from the CO or COR. The written approval can be issued by e-mail, letter or by the CO or COR signing the repair estimate with date. The contractor shall commence repair work within one (1) business day after approval unless the parts are not available.

1.4.3. EMERGENCY REPAIR SERVICE CALLS (Monday – Friday and US Federal Holidays : 1600-0700;

Saturday, Sunday and German Federal Holidays: 24 Hours). The contractor shall report to the work location within two (2) hours of notification by the COR. The contractor shall survey the repair and provide a repair estimate to the CO and COR for material only not later than one (1) business day after receiving requested price of reqired parts. The repair estimate will also include the estimated time necessary for the repair. The contractor shall provide written documentation (for example, a letter/email from the parts manufacturer) to the COR proving the requested price information/delivery time could not be obtained within five (5) business days after the survey. The repair estimate shall be submitted to the Contracting Officer (CO) and COR. The contractor shall not make any repairs until written approval is received from the CO or COR. The written approval can be issued by e-mail, letter or by the CO or the COR signing the repair estimate with date. The contractor shall commence repair work within one (1) business day after approval unless the parts are not available. The contractor shall provide an emergency telephone number to the COR. The COR will provide the 786 CES/CEOES standby phone number to the contractor after contract award.

1.5. REQUIRED DOCUMENTATION.

1.5.1. PREVENTIVE MAINTENANCE SCHEDULE. The contractor shall furnish a written maintenance schedule to the COR no later than 14 business days prior to the start date of the service. The schedule shall include the estimated date, time, and location. The contractor shall provide any schedule changes to the COR no later than seven (7) business days prior to the start of the service.

1.5.2. ROUTINE AND EMERGENCY REPAIR REPORTS. The contractor shall provide repair reports to the COR within one week after completion of work. The reports shall include:

(a) date and time of the service

(b) location, equipment/serial number and type (i.e. pop up barrier, tire shredder, bollard, arm barrier or sliding gate)

(c) Full functionality test

(d) service performed and parts used

(e) amount of time worked

(f) name of the technician performing the service

1.5.3. DELIVERABLES.

Deliverables (Report, Document, etc.) PWS paragraph

Due Date (Calendar Days)

Written Maintenance And Safety Inspection Report 1.3.1.4. Within eight (8) business days after completion of work

Repair Estimate for Routine and Emergency Repairs 1.4.1.

1.4.2 .

1.4.3.

Not later than one (1) business day after receiving requested price of required parts

Routine and Emergency Repair Reports 1.5.2. Within one week after completion of work

Quality Control Plan 1.8.1. Within ten (10) business days after contract award

Manpower Reporting via the secure data collection site

1.8.9. Not later than 31 October each year

1.6. PARTS. The contractor will be reimbursed for the cost of all parts needed for maintenance and repairs. The contractor shall attach a copy of the manufacturer/wholesaler’s invoice, to include shipping charges, if applicable, to the invoice reflecting the amount paid, or to be paid, for all parts. Reimbursement is limited to the actual cost/net price incurred (no handling charge). The net price is the price as paid by the contractor, no costs or profits added.

1.7. WASTE DISPOSAL. All trash and hazardous waste, generated as a result of PM, safety inspections, emergency or routine repairs, shall be disposed of off base, IAW the German Waste Disposal Law at no additional cost to the Government.

1.8. GENERAL INFORMATION.

1.8.1. QUALITY CONTROL. The contractor shall have and maintain a written quality control plan to ensure maintenance, safety inspections and repair services are performed IAW this PWS. The contractor shall have procedures to identify and prevent defective services from recurring. As a minimum, the contractor shall have quality control procedures that address the areas identified in Paragraph 2, Services Summary. The contractor shall submit the Quality Control Plan in writing to the CO for acceptance within ten (10) business days after contract award. The QCP becomes a compliance document after acceptance by the CO.

1.8.2. HOURS OF OPERATION. Contractor’s hours of operations shall be IAW below table.

Hours of Operation Maintenance Services and Safety Inspection

Repairs Emergency Repairs

Monday-Friday and US Federal Holidays 0700-1600 0700-1600 1600-0700

Saturdays, Sundays, & German and US Federal Holidays 24 hours

U. S./German Federal Holidays.

1 January New Year’s Day Neujahr (U.S.) and (German) 3rd Monday in January Martin Luther King Day (U.S.)

3rd Monday in February Washington’s Birthday (U.S.)

** Good Friday Karfreitag (German) ** Easter Monday Ostermontag (German) 1 May Labor Day Tag der Arbeit (German) ** Ascension Day Christi Himmelfahrt (German) ** Whit Monday Pfingstmontag (German) Last Monday in May Memorial Day (U.S.)

** Corpus Christi Day Fronleichnam (German) 4 July Independence Day (U.S.)

1st Monday in September Labor Day (U.S.)

3 October Day of German Unity Tag der Deutschen Einheit (German) 2nd Monday in October Columbus Day (U.S.)

1 November All Saints’ Day Allerheiligen (German) 11 November Veteran’s Day (U.S.)

4th Thursday in November Thanksgiving (U.S.)

25 December Christmas Weihnachten (U.S.) and (German) 26 December 2nd Day of Christmas 2. Weihnachtstag (German)

When a U.S. Federal Holiday is on a Saturday, the preceding Friday will be observed. When the holiday is on a Sunday, the following Monday will be observed.

** Indicates dates change each year – Moveable Holidays

1.8.3. PERFORMANCE OF SERVICES DURING MILITARY EXERCISES OR OPERATIONS. Work stoppages may occur during the execution of this contract due to military exercises or operations. During these times, access to areas supporting the exercise or operation may be curtailed or denied. During scheduled and unscheduled exercises or operations, the contractor must be prepared to postpone performance in coordination with the COR until immediately after completion of the military exercise or operation.

1.8.4. UNACCEPTABLE PERFORMANCE. The contractor shall be given two hours after notification to correct unacceptable performance. If deficiencies are not corrected within the required time frame, the COR will notify the Contracting Officer for action. The contractor shall re-perform at no cost to the government. Any re-performance and/or unacceptable performance will be documented by the COR and may result in the Government seeking equitable price reduction or adequate consideration IAW FAR clause 52.212-4, Contract Terms and Conditions— Commercial Items.

1.8.5. SECURITY REQUIREMENTS. The contractor personnel shall comply with all requirements and procedures IAW AFFARS 5352.242-9000, Contractor access to Air Force Installations.

1.8.5.1. CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL CLEARANCES

AND VEHICLE PASSES. The Contractor personnel shall obtain Base Entry Identification, Installation Common Access Card ICAC. In order to obtain the ICAC the Contractor is required to submit a USAFE IMT 79 (Request for Base Entry Identification), Memo of Base ID request and the Security Questionnaire for simple security check as well as a Police Good Conduct Certificate (Polizeiliches Fuehrungszeugnis). USAFE IMT 79, Memo of Base ID request and the Security Question forms shall be provided by the 786 CES/CEOES COR. Contractor personnel will take the USAFE Form 79, Memo of Base ID request along with certification of good personal conduct and the Security Questionnaire to Bldg #134 at Ramstein Air Base, to obtain Base Entry Identification. Contractor Personnel can only gain access to the KMC after the security check has been passed with positive result. It is the responsibility of the Contractor to collect and turn-in the ICAC within one week for personnel no longer employed.

1.8.5.2. ESCORT. The contractor will be escorted for entry into the Munitions Storage Area on Ramstein Air Base and any other area requiring escorted entry, as needed. Arrangements for escorts will be made by the COR.

1.8.5.3. SPECIAL QUALIFICATIONS. Contractor employees performing services shall be able to speak enough English to communicate on a basic level with on site personnel.

1.8.5.4. CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS.

The contractor shall perform work under this contract consistent with the relevant environmental policy and objectives identified in the installation environmental management system (EMS) applicable for your contract. The contractor shall perform work in a manner that conserves water, energy and other resources to the maximum extent feasible and ensure minimum production of waste as possible, giving preference to recycling and reutilization opportunities. Furthermore, the contractor shall give preference to less toxic materials whenever available and still reliable for their work. In the event an environmental nonconformance or noncompliance of host nation and USAF environmental laws and regulations associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the contractor shall respond and take corrective action immediately. In the case of a nonconformance, the contractor shall respond and take corrective action based on the time schedule established by the EMS Coordinator. In addition, the contractor shall ensure that their employees are aware of the environmental management system on base and how these requirements affect their work performed under this contract. All on-site contractor personnel shall receive the installation EMS awareness level information.

1.8.6. CONFORMANCE WITH ENVIRONMENTAL REQUIREMENTS.

The contractor shall perform all work in accordance with applicable German and US Air Force environmental laws, regulations and operating standards, including but not limited to the Final Governing Standards (FGS) for Germany.

The contractor shall be immediately capable of understanding and addressing environmental laws and regulations as they pertain to work performed under this contract. The FGS for Germany and other important environmental laws & requirements applicable for all contractors working on base will be made available upon request.

1.8.7. DOD MISSION ESSENTIAL SERVICES DURING CRISIS. IAW DODI 1100.22, Policy and Procedure for Determining Work Force Mix, paragraph 5b, it is determined that none of the services as stated in this PWS are mission essential.

1.8.8. CONTRACTOR MANPOWER REPORTING. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the PM, safety inspections and repairs of pop up barriers, tire shredders, bollards, arm barriers and sliding gates doors via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

1.9 USES AND SAFEGUARDING OF INFORMATION: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

1.10 USER MANUALS: Data for Air Force service requirements must be input at the Air Force CMRA link.

However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

http://www.ecmra.mil/

2.0. SERVICES SUMMARY (SS). The SS provides information on contract requirements and the expected level of the contractor’s performance. The contract service requirements are summarized in performance objectives. The performance threshold briefly describes the acceptable levels of service required for each requirement. These thresholds are critical to mission success. During the first 30 days of the contract, two errors on each –performance objective will be allowed in an effort to overcome normal phase-in problems (this applies when there is a change of contractor only).

3.0. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The government will provide electricity to the contractor to perform services identified in this PWS.

4.0. APPENDICES.

A. Estimated Workload Data Per Year

B. Current Equipment List

Performance Objective

PWS Para

Performance Threshold

SS-1. Perform Preventive Maintenance:

Semi-annual maintenance on pop up barriers, bollards, and tire shredders and annual maintenance on arm-barriers and sliding gates are performed timely and properly IAW this PWS using the equipment listing in Appendix B.

1.3 No more than 3 deficiencies

per performanceyear.

SS-2. Perform Safety Inspections: Annual safety inspections on arm-barriers and sliding gates are performed timely and properly IAW this PWS using the equipment listing in Appendix B.

1.3 No more than 2 deficiencies

per performance year.

SS-3. Perform Routine Repair: Routine repairs are performed properly and within times specified on pop up barriers, tire shredders, bollards, arm barriers and sliding gates.

1.4.1 No more than 3 deficiencies

per performance year

SS-4. Perform Emergency Repair:

Emergency repairs are performed properly and within times specified on pop up barriers, tire shredders, bollards, arm barriers, and sliding gates.

1.4.2 No deficiencies

SS-5. Routine and Emergency Repair Reports. Provide Submittals, Schedules and Reports – Submittals, Preventive Maintenance Schedules, and Reports provided are complete, accurate, and delivered within time specified.

1.4 1.5 including its sub-paragraphs

No more than 3 late, incomplete or inaccurate submittals/schedules/reports per performance year

Appendix A

ESTIMATED WORKLOAD DATA PER YEAR

ESTIMATED

QUANTITY ITEM NAME

1 Semi-annual preventive maintenance of pop-up barriers, bollard barriers and tire shredders (173 pieces of Equipment, 346 inspections) 346 each

2 Annual preventive maintenance with safety inspections of arm barriers 60 each

3 Annual preventive maintenance with safety inspection of sliding gates 61 each

Routine Repair Service Calls (average of 5 hours per call)

165 each

5 Total Routine Repair per year (for item 4) 825 hours

Emergency Repair Service Calls

(average of 3 hours per call) 51 each

7 Total Emergency Repair per year(for item 6) 153 hours

NOTE:

(a) For each routine repair service call purchased in excess of or less than the annual estimated quantity identified in item 4 of the Estimated Workload Data Per Year, the annual estimated quantity of routine repair hours is increased/decreased by 5 hours in item 5 of the Estimated Workload Data Per Year.

(b) For each emergency repair service call purchased in excess of or less than the annual estimated quantity identified in item 6 of the Estimated Workload Data Per Year, the annual estimated quantity of emergency repair hours is increased/decreased by 3 hours in item 7 of the Estimated Workload Data Per Year.

(c) For each piece of equipment added/removed during the course of the contract the estimated quantity of routine repair hours is increased/decreased by 2 hours in item 3 of the Estimated Workload Data Per Year, for yearly adjustment purposes.

APPENDIX B - CURRENT EQUIPMENT LIST

TYPES:

A = Arm Barriers B = Bollards P = Pop-up Barriers/Tire Shredders SG = Sliding Gates

Location B/P A SG

AMC APS

5 1 7

Air Mobility Command

AMC AMXS

0 1 0

Air Mobility Command

CTS

0 2 5

Construction Training Squadron

EHOF

3 0 2

Einsiedlerhof

KMCC

94 0 0

Kaiserslautern Military Community Center

RAB

50 48 33

Ramstein Air Base

VWE

21 8 11

Vogelweh

TOTAL 173 60 58

Grand Total All 291

Location Type Manufacturer Type QTY AMC/AMXS A Sälzer unknown 1 AMC 721 APS A Sälzer Kom.Nr.: 2508

Typ M 730

AMC 721 APS B Elkosta quadruple bollard Fabr.Nr.: AI 032 424, Typ CP220 1 AMC 721 APS B Elkosta quadruple bollard Fabr.Nr.: AI 032 424, Typ CP220 1 AMC 721 APS B Elkosta quadruple bollard Fabr.Nr.: AI 032 424, Typ CP220 1 AMC 721 APS B Elkosta unknown 1

AMC 721 APS B Elkosta unknown 1

AMC 721 APS SG Elkosta Fabr.Nr: AI 030 523, Typ FSST 1 AMC 721 APS SG Elkosta unknown 4 AMC 721 APS SG Elkosta AI040082 1 AMC 721 APS SG Elkosta AI040082 1

CTS A Gunnebo Fabr.Nr.: 194144 Pos. 00.20 Typ: GES-5 Nr. 20061606

CTS A Gunnebo Fabr.Nr.: 194144 Pos. 00.10 Typ: GES-5 Nr. 20061605

CTS SG Torwerk Fabr. Nr. 12056

Typ: STF-131-E

CTS SG Elkosta Fabr.Nr. 41481 Typ FSST

CTS SG Elkosta AI 022463 / 20 1 CTS SG Elkosta AI 022463 / 20 1 CTS SG Elkosta Fabr.Nr.: AI 022463/100

Typ: FSST 325

CTS SG Perimeter Protection Group Serial Nr.: 20140215 Kom.Nr.: 295 783

EHOF P Heintzmann Fabr.Nr.: 06 09 01/00, Transit

Barrier

EHOF P Heintzmann Fabr.Nr.: 06 09 01/00, Transit Barrier

EHOF P Heintzman Tiger Teeth 1

EHOF SG Elkosta Fabr.Nr.: AI 022713-20, Typ FST

EHOF SG Elkosta Fabr.Nr.: AI 022713-10, Typ FST

KMCC B Pilomat unknown 7 KMCC B Pilomat unknown 8

KMCC B Pilomat unknown 7 KMCC B Pilomat unknown 6 KMCC B Pilomat unknown 8 KMCC B Pilomat unknown 8 KMCC B Pilomat unknown 3 KMCC B Pilomat unknown 3 KMCC B Pilomat unknown 26 KMCC B Pilomat unknown 7 KMCC B Pilomat unknown 4 KMCC B Pilomat unknown 4 KMCC B Pilomat unknown 3

RAB A Elkosta unknown 1 RAB A Elkosta unknown 1 RAB A Sälzer Fabr.Nr.: 0012, Typ: M 720 1

RAB A Sälzer Kom.Nr.: 2120 Nr. 13 Typ: 013 M 720

RAB A Sälzer Kom.Nr.: 2120 Ser.Nr. 0014 Typ: 014 M 720

RAB A Sälzer Fabr.Nr.: 0015 Typ Nr.: M 720

RAB A Sälzer Kom.Nr.: 2120 Nr. 17 Typ: M 720 with contact loop

RAB A Sälzer Kom.Nr.: 2120 Nr. 16 Typ: M 720 with contact loop

RAB A Kottmann Fabr.Nr.: 070-704 3H, Typ: HSD 1

RAB A Kottmann Fabr.Nr.: 070-704/3H, Typ: HSD 1

RAB A Elkosta Fabr.Nr.: AI 050 696/01, Typ: HS

RAB A Elkosta Fabr.Nr.: AI 050 696/02, Typ: HS

RAB A Elkosta Fabr.Nr.: AI 050 696/03, Typ: HS

RAB A Elkosta Fabr.Nr.: AI 050 696/04, Typ: HS

RAB A Elkosta Fabr.Nr.: AI 050 696/05, Typ: HS

RAB A Elkosta AI 050 696 HSP 60 1 RAB A Elkosta Typ: AI 022 652-A66r 1

RAB A unknown unknown 2

RAB A unknown unknown 2 RAB A unknown unknown 1 RAB A Magnetic Autocontrol Fabr.Nr.: 10565015

Ser.Nr.: F05211526

RAB A FAAC Fabr.Nr.: 341030 Code: 1046848 Nr.: 02040015 Typ: 640/60

RAB A FAAC Fabr.Nr.: 03050003 Code: 1046278 Typ: 640

RAB A Gunnebo Fabr.Nr.: 194 144 Ser.Nr.: 20060802 Typ: GES

RAB A Magnetic Autocontrol Typ: MIB 40 1

RAB A Magnetic Autocontrol Typ: MIB 40 1

RAB A Magnetic Autocontrol Typ: MIB 40 1 RAB A Gunnebo Fabr.Nr.: 3-20080104

Kom.Nr.: 219040 Typ: HSD 60

RAB A Magnetic Autocontrol Typ: MIB 40 1

RAB A Magnetic Autocontrol Autocontrol Typ: MIB 41 1 RAB A Elkosta Fabr.Nr.: AI 040 595

Typ: HSP 40

RAB A Elkosta Fabr.Nr.: AI 040 595 Typ: HSP 40

RAB A Magnetic Autocontrol Fabr.Nr: F 05198254 Typ: 1056.5015

RAB A Magnetic Autocontrol Typ: 1056.5015 1 RAB A Gunnebo Fabr.Nr.: 3-20080017

Typ: HS 100 SP

RAB A Gunnebo Fabr.Nr.: 3-20080018 Typ: HS 100 SP

RAB A Sälzer Fabr.Nr.: 19 Kom.Nr. 2159 Typ: M720

RAB A Sälzer Kom.Nr. 2159 20 Typ: M720 1 RAB A Sälzer Kom.Nr. 2285 Nr.: 22 1 RAB A Sälzer Kom.Nr. 2285 Nr.: 23

Typ: M720

RAB A Zabag unknown 1 RAB A Zabag unknown 2 RAB A Zabag unknown 2 RAB A Zabag unknown 1

RAB B Elkosta triple bollard Fabr. Nr.: AI 041 449

Typ CP 220

RAB B Elkosta triple bollard Fabr. Nr.: AI 041 449 Typ CP 220

RAB B Elkosta quintuple bollard Fabr. Nr.: AI 041 449 Typ CP 220

RAB B Elkosta triple bollard Fabr.Nr.: AI 050 119 Typ: CP 220

RAB B Elkosta triple bollard Fabr.Nr.: AI 050 119 Typ: CP 220

RAB B Elkosta triple bollard Fabr.Nr.: AI 050 119 Typ: CP 220

RAB B Elkosta quadruple bollard Fabr.Nr.: AI 050 119 Typ: CP 220

RAB B Elkosta quadruple bollard Fabr.Nr.: AI 050 119 Typ: CP 220

RAB B Elkosta triple bollard Fabr.Nr.: AI 050 119 Typ: CP 220

RAB B Elkosta triple bollard Fabr.Nr.: AI 050 119 Typ: CP 220

RAB B Elkosta triple bollard Fabr.Nr.: AI 050 119 Typ: CP 220

RAB B Elkosta triple bollard Fabr.Nr.: AI 041 924 Typ: CP 220

RAB B Elkosta triple bollard Fabr. Nr.: AI 041 449 Typ CP 220

RAB B Elkosta triple bollard Fabr.Nr.: AI 041 924 Typ: CP 220 1

RAB B Elkosta quintuple bollard Fabr.Nr.: AI 041 519 Typ: CP 220

RAB B Elkosta quintuple bollard Fabr.Nr.: AI 041 519 Typ: CP 220

RAB B Elkosta quintuple bollard Fabr.Nr.: AI 041 449 Typ: CP 220 1 RAB B Elkosta quintuple bollard Fabr.Nr.: AI 041 449 Typ: CP 220 1 RAB B Elkosta double bollard Fabr.Nr.: AI 041 767 Typ: CP 220 1 RAB B Elkosta double bollard Fabr.Nr.: AI 041 767 Typ: CP 220 1 RAB B Elkosta unknown 1 RAB B Elkosta unknown 1 RAB B Pilomat double bollard unknown 2 RAB B Elkosta quintuple bollard unknown 1 RAB B Elkosta triple bollard Fabr.Nr.: AI 042 070 1 RAB B Elkosta triple bollard Fabr.Nr.: AI 041 976 1 RAB B Elkosta triple bollard Fabr.Nr.: AI 041 976 1 RAB B Elkosta quintuple bollard Fabr.Nr.: AI 041 519 P10 1 RAB B Elkosta quadruple bollard Fabr.Nr.: AI 041 449 1 RAB B Elkosta quintuple bollard Fabr.Nr.: AI 041 519 1 RAB B Elkosta AI 041 924 1 RAB B Elkosta AI 041 924 1 RAB B Elkosta quintuple bollard Fabr.Nr.: AI 041 073 1 RAB B Elkosta quintuple bollard Fabr.Nr.: AI 040 851 1 RAB B Elkosta double bollard Fabr.Nr.: AI 042 113 1 RAB B Elkosta double bollard Fabr.Nr.: AI 041 971 1 RAB B Elkosta triple bollard Fabr.Nr.: AI 041 971 1 RAB B Elkosta triple bollard Fabr.Nr.: AI 042 112 1 RAB B Elkosta quintuple bollard unknown 1 RAB B Elkosta triple bollard Fabr.Nr.: AI 042 110 1 RAB B TESCON triple bollard TC-3rbv Nr A 091 15 1 RAB B Elkosta double bollard unknown 1

RAB P Heintzmann Fabr.Nr.: 42 109 614 1 RAB P Heintzmann Fabr.Nr.:42 109 613 1 RAB P Heintzmann Fabr.Nr.: 42 109 612 1 RAB P Heintzmann Fabr.Nr.: 42 109 611 1 RAB P Heintzmann Fabr.Nr.: 420 817 1 RAB P Heintzmann Fabr.Nr.: 817 914 1 RAB P Elkosta Fabr.Nr.: AI 040 595 P20 Typ: DSP 1

RAB SG BFT 150/87 1

RAB SG BFT 150/87 1

RAB SG Zabag Kombi (2010) 1 RAB SG Drive from BFT ICARO 1

RAB SG BFT ICARO 1

RAB SG Elkosta Fabr.Nr.: 22652 1 RAB SG Elkosta Drive from von

BFT

Fabr. Nr.:AI 040 425/5500000200391 Typ: FSST P10 / ICARO Prox Ma

RAB SG Elkosta Fabr.Nr.: 034 401 1 RAB SG Elkosta Fabr.Nr.: 21 293 1 RAB SG Elkosta unknown 1 RAB SG Werra Salzkotten Fabr.Nr.: 20040388 1 RAB SG Elkosta Fabr.Nr.: AI 042 061 1 RAB SG Elkosta Fabr.Nr.: 1 RAB SG Elkosta Fabr.Nr.: 1 RAB SG Hedda Fabr.Nr.: 28394 Typ: FSV-N 1 RAB SG NBB-Baubedarf 08586

Fabr.Nr.: 1

RAB SG NBB-Baubedarf 08586

Fabr.Nr.: 1

RAB SG unknown unknown 1 RAB SG Elkosta Fabr.Nr.: AI 219 040 1 RAB SG Heda Fabr.Nr.: SSVN 29283 1

RAB SG Heda Fabr.Nr.: 44610-3 1 RAB SG Gunnebo Fabr.Nr.: 1 RAB SG Heda Fabr.Nr.: 44610-4 1 RAB SG Wego Fabr.Nr.: 1 RAB SG Wego Fabr.Nr.: 1

RAB SG Elkosta Fabr.Nr.: AI 021 889 1 RAB SG Elkosta Fabr.Nr.: 143 354 1 RAB SG Elkosta Fabr.Nr.: AI 030 523 1 RAB SG Elkosta unknown 2 RAB SG Elkosta unknown 2 RAB SG Elkosta unknown 1

VWE A Elkosta Fabr.Nr.: AI 050 529

Typ: HSP 60

VWE A Elkosta Fabr.Nr.: AI 050 529 Typ: HSP 60

VWE A Scheidt+ unknown 1 VWE A Scheidt+ unknown 1 VWE A Sälzer unknown 1 VWE A Gunnebo Fabr.Nr.: 194171

Typ: GES-5

VWE A Delta Stanford Valencia Plan Nr.: 90623-1 Typ: IP 500 (H)

VWE A Elkosta Fabr.Nr.: AI 021 605 Typ: HSS

VWE B Elkosta quadruple bollard Fabr.Nr.: AI 050 529 1

VWE B Elkosta quadruple bollard Fabr.Nr.: AI 050 529 1 VWE B Elkosta trible bollard Fabr.Nr.: AI 050 519 1 VWE B Elkosta trible bollard Fabr.Nr.: AI 050 519 1 VWE B Gunnebo trible bollard unknown 3 VWE B Gunnebo trible bollard unknown 3

VWE B Gunnebo trible bollard unknown 3

VWE B Elkosta Fabr.Nr.: AI 042 113 Typ: CP 220

VWE P Kottmann Tiger Teeth 1 VWE P Heintzmann Fabr.Nr.: 421 032 1 VWE P Gunnebo unknown 1

VWE P Gunnebo unknown 1 VWE P Kottmann/ Fabr.Nr.: AI 050 619

Typ: Tyre Killer

VWE P N/A Tiger Teeth 1 VWE P Kottmann/ Fabr.Nr.: AI 050 619

Typ: Tyre Killer

VWE SG Adronit Fabr. Nr. 2410

Typ: Altas Gl

VWE SG Elkosta 1 VWE SG Elkosta Fabr.Nr.: AI 0161371.1

Typ: FSST 425

VWE SG Elkosta Fabr.Nr.: AI 0161371.2 Typ: FSST 425

VWE SG Hoffmeister 3888-2-FSI 2 VWE SG Zaunbau Stoffel Fabr.Nr.: 202 808 2 VWE SG Elkosta Fabr.Nr.: 33100

Typ: LST

VWE SG Elkosta Fabr.Nr.: 33100 Typ: LST

VWE SG Hoffmeister Unknown 1

VWE SG Perimeter Unknown 1

VWE SG Elkosta unknown 1

PERFORMANCE WORK STATEMENT
FOR
FOR
Emergency Repairs
Repairs
Maintenance Services and Safety Inspection
Hours of Operation
Performance Threshold
PWS Para

File details come from the government source that posted it. Updated .