Attach 01 Annex 31e. Blank STP Format.docx
DOCX document 27 KB Posted
- Attached to
- Air Force Multiple-Award Construction IDIQ, Germany Federal contract opportunity
- Solicitation number
- FA5613-08-R-0001
About this file
SECTION J ATTACHMENT 01 STANDARDIZED TECHNICAL PROPOSAL FORMAT ANNEX 31 e
View the file
Other files for this federal contract opportunity
Show all 50
Air Force Multiple-Award Construction IDIQ, Germany has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank Standardized Technical Proposal (STP) Format
| A: PRELIMINARY NOTES |
| PROJECT #: |
TITLE:
BUILDING #:
LOCATION:
| B: TIME SCHEDULE | |
| PERFORMANCE PERIOD | |
| Calendar Days: | |
| LATEST END DATE: | |
| EXCLUSION PERIOD: | |
| PHASES: |
| C: STATEMENT OF WORK (SOW) |
| Contractor shall provide SOW based on the Government provided Statement of Need (SON) |
Yes |_| No |_|
| D: TECHNICAL DESCRIPTION |
| 1. UNIT PRICE BOOK (UPB) DESCRIPTION |
a. NEW WORK
b. REPAIR/OTHER
2. LUMP-SUM ORDERING PROCEDURE (LSOP)
a. NEW WORK
b. REPAIR/OTHER
| Yes |_| | No |_| |
| Yes |_| | No |_| |
| Yes |_| | No |_| |
| Yes |_| | No |_| |
| E: QUALITY CONTROL |
| 1. SPECIFIC TASK ORDER QUALITY CONTROL, ISO 9001-2000 |
2. ABATEMENT PLAN FOR CONTAMINATED MATERIAL
3. OTHER SPECIAL CONSTRAINTS
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
| F: CURRENT REGULATIONS |
| 1. DIN STANDARD FOR THIS SPECIFIC TASK ORDER |
2. OTHER REGULATIONS
Yes |_| No |_|
Yes |_| No |_|
G: ATTACHMENT ONE
[Project Info. Sheet Provided by requiring activity - Attach to Technical Proposal ]
1. MAGNITUDE (SELECT ONE VALUE ONLY)
2. STATUTORY COST LIMITATION: THE NEW WORK PORTION OF THIS PROJECT IS ESTIMATED TO BE BELOW THE CURRENT VALID STATUTORY COST LIMITATION OF $ 750,000.00
3. LIQUIDATED DAMAGES ARE REQUESTED. THE VALUE IS ATTACHED. MANDATORY OVER $550,000.00
4. WORK HOURS
| Days |
| Weekend |
US / German Holidays
5. RESTRICTED AREAS
6. GOVERNMENT FURNISHED PROPERTY
7. DIGGING PERMIT: A digging permit (AF Form 103) is required. The contractor shall obtain the required form from the Ramstein or Spangdahlem Engineering Office.
8. WELDING PERMIT: A welding permit is required. The contractor will obtain the form at the Ramstein or Spangdahlem Fire Protection Office.
9. UTILITY SHUT-DOWN: Utility interruption is required. Request must be submitted in writing to the C. O. at least 10 working days prior to proposed interruption.
10. TRAFFIC RESTRICTION
11. CRANE ERECTION / AIR TRAFFIC INTERFERENCE
12. AIRFIELD CONSTRUCTION WAIVER
13. CONSTRUCTION / MATERIAL LAYDOWN AREA
14. AS-BUILT DRAWINGS
15. MAINTENANCE MANUALS (Due not later than final inspection) |_| Less than $25,000 |_| Between $25,000 and $100,000 |_| Between $100,000 and $250,000 |_| Between $250,000 and $500,000 |_| Between $500,000 and $1,000,000 |_| Between $1,000,000 and $5,000,000
Yes |_| No |_|
Yes |_| No |_|
| FROM | TO |
| FROM | TO |
| FROM | TO |
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
| G. OTHER ATTACHMENTS AS NEEDED |
| 1. 700 CONS MATERIAL SUBMITTAL FORM 66 |
2. ELECTRONIC & PAPER DRAWINGS IAW THE GENERAL STATEMENT OF NEED & TASK ORDER STATEMENT OF NEED
3.
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
FA5613-08-R-0001-0002 Attachment 31 e Page 2 of 3
File details come from the government source that posted it. Updated .