FA5613-08-R-0001-0005.doc

DOC document 41 KB Posted

Attached to
Air Force Multiple-Award Construction IDIQ, Germany Federal contract opportunity
Solicitation number
FA5613-08-R-0001
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Amendment 5 to FA5613-08-R-0001

View the file

Other files for this federal contract opportunity

Other files attached to Air Force Multiple-Award Construction IDIQ, Germany, newest first.
File Type Posted
FA5613-08-R-0001-0004.doc DOC document
Attach 02d STP for Test project —
Attach 05 LI 660.229-233.pdf PDF
Attach 01 Annex 31g. AF 3065 Progress Report.xfdl XFDL file
Attach 01 Annex 31i. 700 CONS Submittal Template.doc DOC document
Attach 05 LI 665.pdf PDF
Attach 05 LI 615.pdf PDF
Attach 01 Annex 31f. AF 3064 Progress Schedule.xfdl XFDL file
Attach 01 Annex 31c. UFC Fire Protection Code.pdf PDF
Attach 01 Annex 31a. Ram Spang Base Appearance.doc DOC document
Attach 01 AA Rev 01 0 General SON 24 July 09.doc DOC document
FA5613-08-R-001-0002.doc DOC document
Attach 05 LI 630.pdf PDF
Attach 05 LI 600.pdf PDF
Attach 05 LI 681.467.pdf PDF
Attach 05 LI 606.pdf PDF
Attach 05 LI 680.021-680.819.pdf PDF
Attach 05 LI 656.pdf PDF
Attach 05 LI 652.pdf PDF
Attach 05 Add Line Items Index.doc DOC document
Attach 05 LI 681.095-721.pdf PDF
Attach 02c 700 CONS Submittal Template.doc DOC document
Conformed copy after Amend 02.doc DOC document
Attach 04 Rev 01 Consent Memo.rtf RTF text file
Attach 05 LI 660.017-019.pdf PDF
Attach 05 LI 680.999.pdf PDF
Attach 05 LI 679.311-385.pdf PDF
Attach 05 LI 661.pdf PDF
Attach 05 LI 681.319.pdf PDF
Attach 02a Rev 01 Site Plan for B 194.ppt PPT presentation
Attach 05 LI 660.300.pdf PDF
Attach 05 LI 682.pdf PDF
Attach 05 LI 620.pdf PDF
Attach 05 LI 657.pdf PDF
Attach 05 LI 650.pdf PDF
Attach 05 LI 655.pdf PDF
Attach 05 LI 681.721-900.pdf PDF
Attach 05 LI 653.pdf PDF
Attach 05 LI 679.460-466.pdf PDF
Attach 03 Rev 01 PPQ.rtf RTF text file
Attach 05 LI 660.046-096.pdf PDF
Attach 05 LI 638.pdf PDF
Attach 05 LI 651.pdf PDF
Responses to Contractor Questions.pdf PDF
AF PPC Meeting Minutes 1 Jul 2009.PDF PDF
AF PP Conference 01 Jul 09.ppt PPT presentation
Attach 04 Consent Memo.rtf RTF text file
Attach 02 Test Project SON 05 Jun 09.docx DOCX document
Attach 03 PPQ.rtf RTF text file
AF SABER Presolicitation Notice.doc DOC document
Show all 50

Air Force Multiple-Award Construction IDIQ, Germany has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT #5 CONTINUATION

As previously addressed during the Pre-Proposal Conference on 01 July 2009, the Government holds all interested parties involved in the procurement process to the highest ethical standards. FAR Part 3 states that the expenditure of public funds requires the highest degree of public trust and an impeccable standard of conduct. Any conflict of interest, whether actual or even the mere perception thereof, must be strictly avoided in the Government-Contractor relationship. The following misconduct shall not be tolerated:

a. The offer or acceptance of a bribe or gratuity;

b. The disclosing or obtaining of proposal or source selection information, to include information provided by current or former employees;

c. The compensating of former employees within the one year ban period, or scenarios referred to commonly as “switching sides” during the procurement process; and,

d. Any other misconduct that violates applicable regulations or laws governing the procurement process.

The Government shall respond appropriately to a violation of the above whether through administrative, civil or criminal action. The Government reserves the right to rescind a contract, and/or suspend/debar a contractor for up to three years for a violation of ethical principles or law.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .