Amendment 1 Attachment 1 PES Performance Work Statement.pdf

PDF 309 KB Posted

Attached to
Potential Explosive Sites (PES) Solicitation Federal contract opportunity
Solicitation number
FA558721Q0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Other files attached to Potential Explosive Sites (PES) Solicitation, newest first.
File Type Posted
PES Solicitation Amendment 1 FA558721Q00030001 SF 30.pdf PDF
FA558721Q0003 Potential Explosive Sites QA 17 December.pdf PDF
Attachment 1 PES Performance Work Statement.pdf PDF
Attachment 2 PES Price Sheet.xlsx XLSX spreadsheet
Solicitation - FA558721Q0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Potential Explosive Sites (PES) Inspections

17 December 2020

1.0 Description of Services and Required Tasks

1.1 Introduction

1.2 Scope of Work

1.2.1 Technical Inspections

1.2.2 Professional Appraisal

1.2.3 Schedule 2 Inspections

1.2.4 Ad- Hoc Inspections

1.2.5 Technical Data Reports

1.2.6 Schedule

2.0 General Requirements

2.1 Communication

2.2 Non-Personal Services

2.3 Business Relations

2.4 Contract Administration and Management

2.4.1 Contract Management

2.4.2 Contract Administration

2.4.3 Personnel Administration

2.5 Subcontract Management

2.6 Contractor Personnel, Disciplines, and Specialties

2.7 Locations and Hours of Work

2.7.1 Federal Holidays

2.7.2 Location of Work

3.0 Special Requirements

3.1 Security and Safety

3.1.1 Security

3.1.1.1 Operational Security (OPSEC)

3.1.1.2 Security Clearances

3.1.1.3 Flight-Line Drivers

3.1.2 Safety

3.2 Performance on Department of Defense (DoD) Installations

3.3 Government Furnished Materials

3.4 Environmental Requirements

3.5 Applicable Directives

3.6 Contracting Officer (CO) and Contracting Officer Representative(s) (COR(s)) Quality Assurance

Personnel

3.7 Quality Control

3.7.1 Quality Assurance Surveillance Plan (QASP)

4.0 Service Summary

Appendix A: Schedule of Inspections

1.0 DESCRIPTION OF SERVICES AND REQUIRED TASKS

1.1 Introduction. The Contractor shall provide all personnel, labor, equipment, supplies, tools, materials, supervision, travel, periodic inspection, minor repair, and other items and services necessary to Perform Potential Explosive Sites (PES) Inspections at munitions storage facilities and areas, transit routes, utilities, aircraft egress facilities, hardened aircraft shelters for RAF Lakenheath, and RAF Feltwell. Purpose of these inspections are to ensure Ministry of Defense (MoD) Explosive Regulations are complied with and PES facilities are fit for purpose.

1.2 Scope of Work. These inspections will follow Defence Safety Authority (DSA) 03 - Ordnance Munitions Explosives (OME) Part 2, Inspection of Explosives Facilities and Explosives Management Safety as well as Explosives Storage and Transport Committee (ESTC) Standard 6 for Building and Civil Engineering (B & CE) inspections. The work shall be conducted in set timelines to ensure mission critical facility licenses are maintained and in accordance with the outlined mandatory publications/regulations.

This requirement will encompass the inspection of facilities that have been identified as PES buildings on RAF Lakenheath and RAF Feltwell. These facilities are broken down into munition storages, hardened aircraft shelters, armories, storage areas and the Explosive Ordinance Disposal (EOD) range. A full inventory of facilities and projected inspection schedules are included in Appendix A, Schedule of Inspections. The following is an annual breakdown of inspections and/or appraisals to be performed to the criteria established in the ESTC Standard No 6 Part 2-B &CE Inspections: Defence Safety Authority (DSA)

03. OME Part 2.

1.2.1 Technical Inspections. Technical Inspections of PES facilities are to be conducted on a 2 and 6 year rolling inspection basis. The inspections will be performed according to ESTC standards. The inspection is to be completed using the Schedule 1 Explosives Facility Inspection Report and Schedule 2 Site Infrastructure and Utilities Report. All reports will follow the instructions and guidelines within ESTC Std.

No. 6 Part 2 - B&CE Inspections. The contractor will schedule and complete Technical Inspections for required facilities at least 30 days, but NET 40 days prior to the required date. Technical Inspections are intended to highlight whether observed defects are significant enough to warrant further investigation or other appropriate actions such as immediate or emergency repairs to be undertaken. The Technical Inspection is purely a visual and dimensional inspection with “best endeavors” made concerning access of the structure. A complete examination of facilities is not required if there are serious difficulties gaining access to damaged facilities. It is not the responsibility of the contractor to perform repairs of any of the facilities under this requirement. The technical inspections are intended to:

Provide statement of fact about the condition of the building Identify and record any defects or emerging maintenance requirements Provide a statement of fact about the adequacy and effectiveness of any repair work carried out to date Provide recommendations on any preventative maintenance, remedial work and/or repair and the associated timeframe.

1.2.2 Professional Appraisal. Professional Appraisals of PES facilities are to be conducted every 6 years and will take the place of the Technical Inspection. The inspections will be performed according to ESTC standards. A Schedule 1 Explosives Facility Inspection Report and Schedule 2 Site Infrastructure and Utilities Inspection Report will be used to complete the inspection. All reports will follow the guidelines

Within ESTC Std. No. 6 Part 2 – B&CE Inspections. The contractor will schedule and complete Professional Appraisals at least 30 days prior to the required date listed in Appendix A. The Professional Appraisal is required to look deeper into how the building is performing structurally compared with the Technical Inspections. The appraisal should not only record the observed defects, it should also quantify their effect on the structural integrity of the facility and will highlight whether observed defects are significant enough to warrant further investigation or other immediate or emergency actions should be taken. The overall purpose of the Professional Appraisal is to:

Provide a detailed description of the building and an interpretation of its design philosophy

Identify and record any defects or emerging maintenance requirements

Provide a statement of fact about the adequacy and effectiveness of any repair work carried out to date

Provide recommendations on any preventative maintenance, remedial work, and/or repair and the timeframe within which these are required

Assess the real condition of the structure

Determine whether the structure is safe to use until the next appraisal and is fit for its intended purpose as a licensed explosives facility.

1.2.3 Schedule 2 Inspections. A Site Infrastructure & Utilities Inspection Report will be completed for areas on RAF Lakenheath. There will be three areas requiring a Schedule 2 Report on the installation and are identified as Munitions (MUNS) Storage Area 1, Munitions Storage Area 2, and Munitions Storage Area 5. These inspections will meet the requirements within ESTC Std. No. 6 Part 2 – B&CE Inspections which ensure the site-wide infrastructure and utilities are adequate for storage and movement of explosives. Each munitions storage area will require its own Schedule 2 report.

1.2.4 Ad-Hoc Inspections. The contractor shall conduct Ad-Hoc Inspections following extreme weather conditions (heavy snow fall, flooding, high winds or accidental) as directed by the Contracting Officer (CO) or Contracting Officer Representative (COR). These inspections will fulfill requirements within ESTC Std. No. 6 Part 2- B& CE Inspections within paragraphs 7.5.1 and 7.5.2. The contractor will perform the inspections within 14 calendar days after notification and provide a report with recommended remedial actions within 21 calendar days.

1.2.5 Technical Data Reports. The Technical Inspections and Professional Appraisals will be completed and delivered to the CO and COR and the installation’s Weapons Safety Management Office within 10 business days of performing the inspections. Additionally, the contractor, CO or COR will identify any routine maintenance tasks within 5 days of receiving the inspection report, before passing to 48 CES.

Furthermore, the contractor will notify, in writing, of any health and safety risks identified during inspection to the CO, COR, and Weapons Safety Management Office before leaving the worksite. This documentation will be provided in digital format. The contractor will be available for any questions or concerns the installation has on inspection results. All reports will be performed to ESTC standards and contain all required and pertinent information. Contractor will ensure, before completion and delivery of reports, the most current and updated form will be used as ESTC routinely incorporates updates. The contractor will follow guidance published in ESTC Standard No. 6, Part 2 – B&CE Inspections Amendment 1 – Appendix G, July 2015 or any subsequent ESTC changes published. The Professional Appraisal and Report is completed using Schedule 1 (Explosives Facility Inspection Report) and Schedule 2 (Site Infrastructure and Utilities Inspection Report) that are located at:https://www.gov.uk/government/publications/explosives-storage-and-transport-committee-estc-standard- no-6. All data required by the ESTC will be provided in every report.

1.2.6 Schedule. The current PES facilities are inspected on an odd and even year schedule. The current schedule is attached as Appendix A. The objective is to continue performing required inspections at alternating facilities each year with Professional Appraisals being performed at the 6 year intervals. The contractor will be required to coordinate with the CO or COR two weeks prior to any work ensuring escorts are available for work within restricted areas.

2.0 GENERAL REQUIREMENTS

2.1 Communication. Communication between the contractor and CO or COR will be imperative for the successful operation of this contract. The facilities requiring inspections will possess additional security requirements which will require coordination that must be scheduled to ensure proper access can be granted.

The contractor, CO and COR will ensure required authorizations and access to required escorts is in place prior to the start of inspections. The management work between the CO, COR, and contractor will be critical to the timely completion of inspections to guarantee the explosive licenses for PES facilities.

2.2 Non-Personal Services. The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks or prepare work schedules for individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services.

2.3 Business Relations. The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

2.4 Contract Administration and Management. The contract will be overseen by a designated Contract Manager that will coordinate all inspection tasks and work visits with the CO or COR. The Contract Manager will ensure inspectors possess and maintain required certification as required within the ESTC.

The Contract Manager will ensure work is carried out within required timelines and inspection documentation is accurately performed and delivered.

2.4.1 Contract Management. The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at RAF Lakenheath, RAF Feltwell, and the contractor's corporate offices.

A Contract Manager and alternate will be designated and be responsible for the performance of work and shall have full authority to act for the contractor on all matters relating to daily operations of this contract.

The Contract Manager will be designated in writing and provided to the CO and COR two weeks prior to performance. The Contract Manager shall be available during normal duty hours and days (Monday – Friday / 0730 – 1630). The Contract Manager will be able to meet with the CO or COR to resolve any contract issues.

2.4.2 Contract Administration. The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions within one business day. The contractor shall have a primary and alternate point of contact between the Government and contractor personnel assigned to support contract. The contractor shall assign work effort and maintain proper and accurate time keeping records of personnel assigned to work on the requirement.

2.4.3 Personnel Administration. Performing inspections requires trained and certified inspectors to properly perform the scope of work in the contract. Documentation will be required to demonstrate knowledge with the explosives storage and processing principles set out in DSA 03.OME Pt2. Technical Inspection inspectors will meet requirements within the ESTC Std. 6, which requires at least a “Technician or Incorporated Engineer membership of either the Institution of Civil Engineers (ICE), the Institution of Structural Engineers (IStructE) or other equivalent body.” For Professional Appraisals, the inspector will possess at least “Chartered or Corporate membership of either the Institution of Civil Engineers (ICE), the Institution of Structural Engineers (IStructE), or other equivalent body as per ESTC Std. 6. Documentation will be provided within the response to solicitation and any additional inspector’s documentation will be provided to the CO and COR at least two weeks prior to work being performed.

Contractor will be responsible for the transportation of inspectors to the assigned facilities. All management, licensing, testing, tools, supplies, equipment, and labor necessary to execute the required work will be provided by the contractor. All work material and services, not expressly called for in this specification, which may be necessary to carry out performance of this contract, shall be furnished and provided by the contractor at no increase of cost to the U.S. Government.

All equipment with transmitters (i.e. phones, tablets, Bluetooth, etc.) must be approved for Hazards of Electromagnetic Radiation to Ordnance (HERO). HERO requests are to be sent to COR a minimum of 21 days in advance of inspections for approved by Installation Spectrum Manager and Wing Weapons Safety.

2.5 Subcontract Management. The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the CO or COR. Cross teaming may be permitted with the approval of the CO or COR.

2.6 Contractor Personnel, Disciplines, and Specialties. The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract. The contractor is required to ensure employees always identify themselves as such.

2.7 Location and Hours of Work. Performance of this contract will be on RAF Lakenheath and RAF Feltwell. The hours of operation within the base are Monday through Friday, 0730 – 1630. Work will not be performed during United States federal holidays.

2.7.1 Federal Holidays

The following are United States Federal Holidays:

1. New Year’s Day – 1 January

2. Martin Luther King Day – 3rd Monday in January

3. President’s Day – 3rd Monday in February

4. Memorial Day – Last Monday in May

5. Independence Day – 4 July

6. Labor Day – 1st Monday in September

7. Columbus Day – 2nd Monday in October

8. Veteran’s Day – 11 November

9. Thanksgiving Day – 4th Thursday in November

10. Christmas Day – 25 December

If these holidays fall on Saturday or Sunday, the preceding Friday, following Monday, or under certain circumstances both Friday and Monday may be observed. The contractor shall schedule work outside of these days.

2.7.2 Location of Work. The RAF Lakenheath facilities are located in various areas within the installation. The locations will include the following areas:

Egress Facilities: The egress will require escort onto the RAF Lakenheath’s flight lineand secured compounds.

Munitions Storage Area: This area is broken down into three main segments. This area will require escort on to RAF Lakenheath’s flight line and into the secured compounds.

Hardened Aircraft Shelters: This area comprises of facilities located across the flight line. These facilities will require escort on to RAF Lakenheath’s flight line.

The RAF Feltwell facilities are located on the far side of the base. These locations are located at:

Ammunition Store: Located at building 230 and will require coordination withfacility manager for access around and inside the building.

3.0 SPECIAL REQUIREMENTS

3.1 Security and Safety. The facilities being inspected under this contract pose unique security and hazards. Additional security measures will be present to include flight line driving requirements, multiple security levels, and restricted access to the specific facilities. Additionally, the potential explosive nature of the facility contents require further knowledge and experience for safe execution of theinspections.

3.1.1 Security. Facilities assigned for inspection under this contract are located within restricted areas of installation, unless otherwise noted. Some of these areas will require flight line driving license and restricted area access badges. A standard escort program will be developed between the contractor, CO or COR. This is to ensure escort personnel are available during scheduled work.

Additionally, specific facilities may require further access or coordination between the contractor, CO, COR and facility managers for access. The munition storage facilities may require additional escort within each segregated storage area, coordination will ensure required escort personnel are available before inspections commence. Hardened aircraft shelters, armories, and any other facilities will require prior coordination with facility manager to guarantee proper access prior to inspections being performed. Generation, storage, or access to United States classified material will not be required.

3.1.1.1 Operational Security (OPSEC). The contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation that services are being performed on. The required CIIL(s) and OPSEC policy(s) will be provided by the COR prior to the beginning of performance for a specific installation.

Before photographs are taken for inspection purposes, prior approval will be required within restricted areas. Coordination between the contractor, CO or COR, and the installation’s Public Affairs office will be required to gain necessary approval. This process will include completing the requirements for a Photo Authorization Letter issued from Public Affairs. The contractor will provide any requested paperwork or information for this process. The contractor will follow all regulations and requirements of the Public Affairs office.

3.1.1.2 Security Clearances. The Contractor shall comply with all requirements and procedures IAW AFFARS 5352.242-9000, Contractor Access to Air Force Installations. All personnel employed on a US military base require a National Agency Check (NAC) equivalent investigation before they are authorized access to the base, facilities, and if necessary computer networks. For the purpose of this contract, these positions are deemed non-sensitive, which by US Government definition means do not require access to US classified information.

A NAC consists of:

· A Local File Check (LFC) conducted by the installation Security Forces (SF) (this can take several days or weeks to complete),

· A Defense Clearance and Investigation Index (DCII) conducted by the installation SF,

· A Host Agency Check (HAC) conducted by the Ministry of Defense (MOD) Defense Vetting Agency (DVA), and

· A Federal Bureau of Investigation (FBI) check if the potential employee has ever resided in the United States for twelve (12) or more consecutive months.

Once completed, a NAC is valid for five (5) years. Before any employee is authorized to perform work on this contract, the Contractor shall provide new employee information required by the LFC and DCII to the

COR(s). The Contractor will inform the COR in writing of all personnel to be employed on this contract that will require access to the working areas no later than seven (7) calendar days after the date of contract award. The Contractor shall then coordinate with the COR(s) for the new employee to complete all requested documentation for the HAC and, if required, FBI checks within three (3) days of the first day of employment. After the LFC and DCII are completed with no issues discovered and the investigation is submitted to DVA and the FBI, a temporary Installation Pass (IP) granting unescorted base access may be granted when: (a) DVA opens the case, (b) a favorable fingerprint report is returned from the FBI, and (c) the unit commander or director favorably reviews the submitted investigation package. The temporary IP is limited to ninety (90) days and does not grant escort privileges. Holders of temporary IPs are subject to additional search procedures at installation entrance gates. When a NAC has been favorably completed and documented the COR(s) will inform the Contractor. The COR(s) may request SF issue a non- temporary IP to the employee. The end date will be no later than the end of the contract or one year from issue, whichever is sooner. The Contractor shall be responsible for tracking expiration dates of IPs and either applying for renewals, or returning the expired IPs to the COR(s) for the base/option period. The Contractor shall return IPs for employees who are no longer employed by the Contractor or assigned to this contract to the COR(s) for the base/option period within forty-eight (48) hours of the employee’s departure.

3.1.1.3 Flight-line Drivers. Training must be completed prior to operating vehicles on the flight line. All employees working on the MUNS Active Vehicle Barriers shall be required to have an AF Form 483, Certificate of Competency (flight-line driver’s license) with them at all times. Vehicles must have a valid POV pass issued by Airfield Management prior to operating on the flight line. No equipment will be left unattended while working in these areas. The contractor shall ensure that any foreign objects and debris produced by is cleared off of all taxiways, runways, and aircraft parking aprons before leaving the work area.

3.1.2 Safety. The contractor, and its subcontractors (if applicable), shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government or contractor personnel, and to cooperate in any resulting safety investigation. The contractor shall notify the cognizant CO, the COR, or other applicable members within 4 hours of all mishaps or incidents. The Government person notified by the contractor will in-turn notify the Safety Office. Contractor notifications made after duty hours shall be reported to the appropriate installation Command Post. If requested by the cognizant CO or COR, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the investigating safety office. If the Government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the Government personnel until the investigation is completed.

All survey work is to be carried out in accordance with the statutory duties and requirements of DSA 03.OME PT 2, the Health and Safety at Work Act, and JSP 375 Management of Health and Safety in Defence. The contractor will be well versed in these regulations and provide training documentation and experience in the inspection of PES facilities. As per ESTC Std. 6, it is not expected that PES facilities will be emptied of its contents to carry out these inspections, and therefore all work will be carried out to DSA

03.OME PT 2, Chapter 18 standards.

3.2 Performance on Department of Defense (DoD) Installations. Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees who do not possess a valid installation access pass will be restricted from the workplace until the pass is (re)activated. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. The Government will provide the contractor with the required information and documents for installation access passes. Subsequently, the contractor shall provide a list of all employees working under this contract, along with the required documentation upon receipt of contract award, and no later than 75 days prior to the projected need for any new installation access pass requirements. The contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The CO or COR are responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract, the contractor is responsible for collecting employee installation access passes and turning them in to the CO or COR within 48 hours of the employee’s departure.

3.3 Government Furnished Materials

No Government furnished property or equipment will be provided for this contract.

3.4 Environmental Requirements

If further intrusive work is required that impacts the environment, contractor will coordinate through the CO or COR and the base’s environmental flight for approval before any actions are undertaken.

3.5 Applicable Directives

The contractor shall comply with all documents listed below as mandatory:

Explosive Storage and Transport Committee Standard No. 6 Part 2 – B&CE Inspections Explosive Storage and Transport Committee Standard No. 6 Part 2 – B&CE Inspections

Amendment 1 – Appendix G, July 2015 Defence Safety Authority (DSA) 03-Ordnance Munitions Explosives (OME) Part 2, Ministry of

Defence Explosives Regulations Joint Services Publication 375 Management of Health and Safety in Defence

3.6 Contracting Officer (CO) and Contracting Officer Representative(s) (COR(s)) Quality Assurance Personnel. The CO will appoint CORs for management of the day-to-day activities of this requirement. The identity, title, and authority of this representative will be provided in writing to the Contractor after award.

3.7 Quality Control.

3.7.1 Quality Control Plan (QCP). The contractor shall develop a QCP and maintain an effective quality control program to ensure services are performed in accordance with the contract and this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non- recurrence of defective services. The contractor's QCP is the means which assures work complies with the requirement of the contract. The finalized QCP will be accepted by the Government at the time of the award. The CO may notify the contractor of required modifications to the plan during the subsequent period of performance. The contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the CO. Any modifications to the program during the period of performance shall be provided to the CO for review no later than 3 business days prior to effective date of the change. The QCP shall be subject to the Government's review and approval. The Government may find the QCP "unacceptable" whenever the Contractor's procedures do not accomplish quality control objective(s). The contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."

3.7.2 Quality Assurance Surveillance Plan (QASP). The Government shall monitor the contractor's performance in accordance with the Government's QASP.

4.0 SERVICES SUMMARY

Performance Objectives

PWS

Reference

Performance Threshold

Method of Surveillance

Perform Technical Inspections in accordance with the established schedule

1.2.1

Inspection is complete, on time 100% of the time

Periodic Inspection and Review of Technical Data Reports

Perform Professional Appraisals in accordance

1.2.2

Technical Data Reports

Perform Schedule 2 Inspections in accordance

1.2.3

Technical Data Reports

Perform Ad-Hoc Inspections in accordance

1.2.4

Technical Data Reports

Produce Technical Data Reports in accordance with established regulations

1.2.5

All required documentation and paperwork is completed as required per regulations, 100% of the time

Technical Data Reports

Appendix A: Schedule of Inspections

DATES SHOWN ARE THE ABSOLUTE DUE DATE FOR

INSPECTION REPORTS. INSPECTIONS MUST BE CARRIED

OUT 30 DAYS PRIOR TO DATE SHOW.

Facility 2021 2022 2023 2024 2025

1255 10-Aug-22 9-Aug-24

1388 10-Aug-22 9-Aug-24

1400 3-May-22 2-May-24

1405 3-May-22 2-May-24

1406 7-Apr-21 6-Apr-23 7-Apr-25

1407 5-May-22 4-May-24

1408 3-May-22 2-May-24

1409 5-May-22 4-May-24

1410 5-May-22 4-May-24

1411 3-May-22 2-May-24

1412 3-May-22 2-May-24

1413 2-Sep-21 1-Sep-23 2-Sep-25

1414 3-Sep-21 2-Sep-23 3-Sep-25

1415 2-Sep-21 1-Sep-23 2-Sep-25

1423 3-May-22 2-May-24

1426 7-Apr-21 6-Apr-23 7-Apr-25

1441 3-May-22 2-May-24

1443 3-May-22 3-May-24

1445 3-May-22 3-May-24

1447 3-May-22 3-May-24

1448 3-May-22 3-May-24

1449 3-May-22 3-May-24

1451 3-May-22 3-May-24

1452 3-May-22 3-May-24

1455 3-Sep-21 2-Sep-23 3-Sep-25

1456 3-May-22 3-May-24

1458 2-Sep-21 2-Sep-23 2-Sep-25

1459 5-May-22 5-May-24

1461 5-May-22 5-May-24

1463 3-May-22 3-May-24

1465 3-May-22 3-May-24

1466 3-May-22 3-May-24

1574 2-Sep-21 1-Sep-23 2-Sep-25

1575 2-Sep-21 1-Sep-23 2-Sep-25

1577 2-Sep-21 1-Sep-23 2-Sep-25

Facility 2021 2022 2023 2024 2025

1578 2-Sep-21 1-Sep-23 2-Sep-25

1593 2-Sep-21 1-Sep-23 2-Sep-25

1595 3-Sep-21 2-Sep-23 3-Sep-25

1599 2-Sep-21 1-Sep-23 2-Sep-25

1604 13-Jul-22 12-Jul-24

1606 2-Sep-21 1-Sep-23 2-Sep-25

1607 2-Sep-21 1-Sep-23 2-Sep-25

1608 2-Sep-21 1-Sep-23 2-Sep-25

1609 2-Sep-21 1-Sep-23 2-Sep-25

1610 2-Sep-21 1-Sep-23 2-Sep-25

1611 2-Sep-21 1-Sep-23 2-Sep-25

1612 2-Sep-21 1-Sep-23 2-Sep-25

1613 2-Sep-21 1-Sep-23 2-Sep-25

1614 2-Sep-21 1-Sep-23 2-Sep-25

1615 2-Sep-21 1-Sep-23 2-Sep-25

1616 2-Sep-21 1-Sep-23 2-Sep-25

1617 2-Sep-21 1-Sep-23 2-Sep-25

1620 3-Sep-21 2-Sep-23 3-Sep-25

1621 3-Sep-21 2-Sep-23 3-Sep-25

1622 3-Sep-21 2-Sep-23 3-Sep-25

1623 8-Apr-21 7-Apr-23 8-Apr-25

1624 8-Apr-21 7-Apr-23 8-Apr-25

1625 8-Apr-21 7-Apr-23 8-Apr-25

1626 8-Apr-21 7-Apr-23 8-Apr-25

1627 3-Sep-21 2-Sep-23 3-Sep-25

1628 3-Sep-21 2-Sep-23 3-Sep-25

1651 13-Jul-21 12-Jul-23 13-Jul-25

1652 13-Jul-21 12-Jul-23 13-Jul-25

1655 2-Sep-21 1-Sep-21 2-Sep-25

1656 13-Jul-21 12-Jul-23 13-Jul-25

1659 13-Jul-21 12-Jul-23 13-Jul-25

1660 13-Jul-21 12-Jul-23 13-Jul-25

1663 13-Jul-21 12-Jul-23 13-Jul-25

1664 13-Jul-21 12-Jul-23 13-Jul-25

1667 13-Jul-21 12-Jul-23 13-Jul-25

1668 13-Jul-21 12-Jul-23 13-Jul-25

6001 27-Apr-22 26-Apr-24

6002 27-Apr-22 26-Apr-24

6003 27-Apr-22 26-Apr-24

6004 27-Apr-22 26-Apr-24

6005 27-Apr-22 26-Apr-24

6006 27-Apr-22 26-Apr-24

6007 27-Apr-22 26-Apr-24

6008 27-Apr-22 26-Apr-24

6010 7-Apr-21 24-Apr-23 23-Apr-25

6011 7-Apr-21 25-Apr-23 24-Apr-25

6012 7-Apr-21 24-Apr-23 23-Apr-25

6013 7-Apr-21 24-Apr-23 23-Apr-25

6014 10-Apr-21 24-Apr-23 23-Apr-25

6015 7-Apr-21 24-Apr-23 23-Apr-25

6016 7-Apr-21 24-Apr-23 23-Apr-25

6017 7-Apr-21 25-Apr-23 24-Apr-25

6018 7-Apr-21 24-Apr-23 23-Apr-25

6019 7-Apr-21 25-Apr-23 24-Apr-25

6020 7-Apr-21 25-Apr-23 24-Apr-25

6022 7-Apr-21 2-May-23 1-May-25

6024 7-Apr-21 2-May-23 1-May-25

6030 7-Apr-21 2-May-23 1-May-25

6031 9-Apr-21 8-May-23 7-May-25

6032 9-Apr-21 8-May-23 7-May-25

6033 9-Apr-21 2-May-23 1-May-25

6034 10-Apr-21 2-May-23 1-May-25

6035 9-Apr-21 2-May-23 1-May-25

6036 7-Apr-21 2-May-23 1-May-25

6037 7-Apr-21 15-May-23 14-May-25

6040 27-Apr-22 27-Apr-24

6041 27-Apr-22 27-Apr-24

6042 10-Apr-21 15-May-23 14-May-25

6043 10-Apr-21 22-May-23 21-May-25

6044 10-Apr-21 15-May-23 14-May-25

6045 10-Apr-21 15-May-23 14-May-25

6046 10-Apr-21 22-May-23 21-May-25

6047 10-Apr-21 22-May-23 21-May-25

6048 15-May-21 15-May-23 14-May-25

6049 10-Apr-21 22-May-23 21-May-25

6050 9-Apr-21 15-May-23 14-May-25

6051 9-Apr-21 15-May-23 14-May-25

6052 10-Apr-21 8-May-23 7-May-25

6053 9-Apr-21 8-May-23 7-May-25

6054 9-Apr-21 8-May-23 7-May-25

6055 9-Apr-21 8-May-23 7-May-25

6056 9-Apr-21 8-May-23 7-May-25

6057 9-Apr-21 22-May-23 21-May-25

6058 10-Apr-21 22-May-23 21-May-25

6059 10-Apr-21 22-May-23 21-May-25

6170 5-May-22 4-May-24

6171 22-Apr-22 21-Apr-24

6172 22-Apr-22 21-Apr-24

6173 22-Apr-22 21-Apr-24

6174 5-May-22 4-May-24

6175 22-Apr-22 21-Apr-24

6180 10-Aug-22 9-Aug-24

6430 3-Sep-21 2-Sep-23 3-Sep-25

6431 3-Sep-21 2-Sep-23 3-Sep-25

6432 7-Apr-21 6-Apr-23 7-Apr-25

6433 7-Apr-21 6-Apr-23 7-Apr-25

6434 3-Sep-21 2-Sep-23 3-Sep-25

6460 3-Sep-21 2-Sep-23 3-Sep-25

6461 3-Sep-21 2-Sep-23 3-Sep-25

6462 3-Sep-21 2-Sep-23 3-Sep-25

6463 3-Sep-21 2-Sep-23 3-Sep-25

6464 3-Sep-21 2-Sep-23 3-Sep-25

MUNS Area 1 24-Jun-22

MUNS Area 2 24-Jun-24

MUNS Area 5

Total by Inspection

2021 2022 2023 2024 2025

Professional Appraisal 9 1 39 0 46

Technical Inspection 85 42 55 43 48

Sched 2 Area Insp. 0 1 0 1 0

Total Inspections 94 44 94 44 94

4 Ad Hoc Inspections per year are also allotted.