Questions and Answers.pdf

PDF 44 KB Posted

Attached to
Heat Treating Furnace Federal contract opportunity
Solicitation number
FA558720Q1061
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Other files attached to Heat Treating Furnace, newest first.
File Type Posted
Attachment 2 - Quote Sheet.pdf PDF
Heat Treating Furnace Solicitaion FA558720Q1061 Updated.pdf PDF
Amendment 0001.pdf PDF
Attachment 2 - Quote Sheet.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Heat Treating Furnace Solicitaion FA558720Q1061.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

1. Is it necessary that the two furnaces stand on top of each other in a double chamber or can the furnaces simply stand next to each other with the quench tank?

Answer: The furnaces won’t be standing on top of each other. It’s simply the design of a single unit by the manufacturer. The heat treating unit we are currently replacing is essentially the same design. There is a circulating air furnace on bottom and a still air oven on top. They are a single unit. The terminology of “Dual” is describing a unit with a still air oven and a circulating furnace. One chamber is for processes that require a higher temperature range than the other. Most importantly, we have limited work space and this unit has the most conducive footprint for the required needs.

2. You require a furnace for the heat treatment of aluminum up to 2000 ° F/ 1093°C, but the melting temperature for aluminum alloys starts at approx. 580°C. Will you accept a product with a lower melting point?

Answer: No, the purpose of a heat treating oven isn’t to melt the parts that you place inside of it but to modify its molecular grain structure. In order to achieve the desired grain structure we must bring the metal to the required temperatures stated in the Technical Order 1-1A-9. The stated temperature range of 2000 ° F is needed for the ferrous materials (steel parts) heat treatment processes.