Attachment_II_-_Minimum_Salient_Characteristics.pdf

PDF 42 KB Posted

Attached to
Engine Change Igloo Shelter
Solicitation number
FA558719Q1058
Issued by

About this file

Attachment II - Minimum Salient Characteristics

View the file

Other files

File Type Posted
COMBO_Final.pdf PDF
Attachment_I_-_Quote_Sheet.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Igloo Engine Shelter Minimum Salient Characteristics

- Must be able to function properly within a temperature range of -30°C to +70°C.

- At a minimum, able to withstand winds up to 25 knots.

- Minimum Size Dimensions: 120cm x 100cm x 100cm.

- Must have built in ballast pads and skirts and external coversheet.

- Must include reflective tape for night time operations.

- Must be able to allow full KC-135 engine changes, to include the use of cranes, bootstrap or engine lift trailers.

- Installation time: approximately no more than 5 minutes, requiring minimal man power to setup

- Must include insulated lining for winter operations.

- Must include lighting packages for night time operations.

- Fabric requirements: Anti-static, fire retardant, and resistant to fuel, oil, and hydraulic fluid.

- Must be able to be shipped as a fly-away kit for forward deploying.

File details come from the government source that posted it.