FA5587-16-Q-0001_Attachment_1_-_SOW.docx
DOCX document 19 KB Posted
- Attached to
- Wifi Pipeline (Bldg 1087) Federal contract opportunity
- Solicitation number
- FA5587-16-Q-0001
About this file
RFP Attachment 1 - Statement of Work (SOW)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5587-16-Q-0001_Amendment_0001_Wifi_Pipeline_RFQ.docx | DOCX document | |
| FA5587-16-Q-0001_Wifi_Pipeline_RFP.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
WIFI Internet pipe For RAF Lakenheath
Prepared by
48 CS/SCXP
Unit 5180 Box 305 RAF Lakenheath
APO AE 09461
19 Jan 2016
STATEMENT OF WORK
1. SCOPE
This statement of work (SOW) is for a contractor to install a commercial wireless access point in B1087 to deliver internet to our Wi-Fi network called We Are Liberty.
2. APPLICABLE DOCUMENTS N/A
3. GENERAL DESCRIPTION
The contractor shall provide all design, labor, and materials to install infrastructure/equipment to the current ‘We Are Liberty” Network QOL currently being used throughout RAF Lakenheath.
The following is a summary of work:
3.1 Install equipment/cabling needed to provide:
100Mb business internet leased line UNCONTENDED in B1087 current head end location. The contractor is required to connect the pipeline to the existing “We Are Liberty” network.
3.2 Provide 100mbs internet with unlimited data.
3.3 Provide fixes to issues within the next business day.
4. INSTALLATION
The contractor shall provide all equipment and supplies necessary to support this requirement. The Contractor shall provide a list of all components installed per this project, as well as a list of the components removed if any.
4.1 Testing and Acceptance
4.1.1 Testing
The contractor will ensure installation is operational and meets all required commercial, local, and international industry standards, military instructions, standards, policies, guidelines, regulations and practices, and 48 CS standards. The testing procedures will be provided in writing to the 48 CS and also a copy of the outcome of the performed test.
4.1.2 Acceptance
The expansion shall operate with minimal failure after acceptance testing and activation of service. The contractor shall provide all support necessary during this period to resolve any issues that may arise.
5. PLACE OF PERFORMANCE
The location of installation is on RAF Lakenheath UK. The contractor is expected to work normal business hours, 0730 to 1630, with sufficient time to allow for entrance and exit of base security points before during and after the normal work hours.
6. HOURS OF WORK
The contractor shall perform all work during normal duty hours, 0730 to 1630, Monday through Friday; excluding UK holidays.
7. POINTS OF CONTACT (POC):
Point of Contacts will be provided at time of award of the contract.
8. CUSTOMER SUPPORT:
Other than next-business-day fixes, customer support shall be available equivalent to that of standard commercial practices.
9. ADDITIONAL REQUIREMENT:
All work area shall be kept as clean as possible during working hours. Debris will not be allowed to accumulate on work site. All debris will be deposited in an authorized container supplied by the contractor.
File details come from the government source that posted it. Updated .