Justification and Approval for Other Than Full and Open Competition (RAF/USAF LPG Consolidation)
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For Official Use Only
COORDINATION AND APPROVAL DOCUMENT
CONTRACTING ACTIVITY: 48th Contracting Squadron (48CONS), RAF Lakenheath PROGRAM/PROJECT: LPG Consolidation Bridge Reacquisition AUTHORITY: 10 U.S.C. 2304(c)(1), as implemented by FAR 6.302-1(a)(2)
ESTIMATED TOTAL CONTRACT COST: £356,703 / $600,207
TYPE OF J&A: Individual
COORDINATION:
48 CES
Requiring Official: ______________________________________________ _____________ Mr. Keiron Mullen, 48 CES/CEOO Date Signed
DSN: 314-226-1932, COMM: (44) 01638-52-1932
100CES
Requiring Official: ______________________________________________ _____________ Mr. Darren Jeffery, 100 CES/CEOSC Date Signed
DSN: 314-226-1906, COMM: (44) 01638-52-1906
REVIEWED BY:
48CONS/LGCB
Contracting Officer: ______________________________________________ _____________ Mr. Steven F. Quillin, 48 CONS/LGCB Date Signed
DSN: 314-226-2393, COMM: (44) 01638-52-2393
APPROVED BY:
48CONS/DBO
Chief of Contracting Office: ___________________________________ _____________ Mr. Michael N. Hogan, 48CONS/DBO Date Signed
DSN: 314-226-2094, COMM: (44) 01638-52-2094
JUSTIFICATION FOR OTHER THAN
FULL AND OPEN COMPETITION
I. CONTRACTING ACTIVITY.
The contracting agency responsible for the proposed contracting action is the 48th Fighter Wing (48FW), 48th Contracting Squadron (48 CONS), RAF Lakenheath, Unit 5070, Box 270, APO, AE 09461. This Justification for Other than Full and Open Competition is prepared with regard to the acquisition of liquid petroleum gas (LPG) utility services (supply and incidental system maintenance) in support of a sole-source contract action for the 48FW, 48th Civil Engineer Squadron (48 CES), RAF Lakenheath (RAFL), and the 100th Air Refueling Wing, Civil Engineer Squadron (100 CES), RAF Mildenhall (RAFM).
II. NATURE AND/OR DESCRIPTION OF THE ACTION BEING PROCESSED.
The resultant contract action will be procured IAW FAR Part 12 – Commercial Items, FAR Part 13
– Simplified Acquisition Procedures and FAR Part 41 – Utility Services. The contract will be awarded as a new, hybrid Firm-Fixed Price (FFP) contract with provision to negotiate and subsequently change pricing associated with the primary cost driver under this contract action, LPG. Because LPG is a direct derivative of crude oil, the associated raw cost is strictly dependent upon crude oil pricing; resultantly changing on an unpredictable basis that cannot be realistically fixed. As prescribed by FAR Part 41 for Utility Services, the application of FAR Clause 52.241-8, CHANGE IN RATES OR TERMS AND CONDITIONS OF SERVICE FOR UNREGULATED
SERVICES will be utilized under the contract to change rates, as a means to accommodate upward and downward fluctuations in the resultant contract price. The process for price negotiations and subsequent changes in contract pricing will be specifically prescribed under the aforementioned clause; ultimately as a means to achieve pricing that is fair and reasonable to both the Government and the contractor, on an ever-changing basis.
Calor Gas Ltd’s current sole-source contract FA5587-12-P-0024 expired 30 September 2012 and the maximum six (6) month option period to extend services under this contract were exercised through 31 March 2013. The extension of services was exercised for this timeframe to accommodate the pending results of a concurrent solicitation fulfilling the same requirements for LPG on a United Kingdom (UK)/MOD-wide basis, issued by the Ministry of Defense (MoD) Glasgow UK Central Contracting Office. Utilization of MoD’s contractual framework by 48 CES and 100 CES for LPG utility services will be commensurate with like requirements for other base utilities at RAFL and RAFM such as water, electric, and oil. As the MoD was strategically-sourcing LPG on a UK-wide basis for the MoD, cost savings were anticipated due to the larger volume ordered (i.e. economies of scale). Based on the annual LPG consumption levels at the various tank locations at RAFL and RAFM, the pricing under MoD’s contract resulted in a pence per liter price for LPG which represent an approximate cost savings of $320K annually. Not accounted however was the expected likelihood that under UK LPG law and regulation, the incumbent contractor currently under contract with 48 CES and 100CES, Calor Gas Ltd, would need to transfer ownership of their LPG tanks and associated distributions to the MoD’s awardee, or entirely new tanks/systems be installed and commissioned. Nor was the aspect of transition/transfer considered or offered by the MoD during the pre-award phase of their acquisition by means of allowing the opportunity of competing LPG suppliers to attend a site visit/assessment or feasibility study at RAFL and RAFM.
The MoD announced the award of their contract on 31 January 2013, which was resultantly protested. While the protest was not upheld, it led to a resultant delay in the commencement date of MoD’s contract until 12 February 2013. Subsequently, the site assessment timeframe by both 48 CES and 100 CES with the MoD’s awardee for purpose of consideration by both parties in conducting a feasibility study to transition the supply of LPG to the various tanks locations accordingly (from Calor to the MoD’s awardee), was further delayed. Resultantly, the sole source contract action subject to this J&A represents a continuation of performance with the incumbent contractor currently under contract, Calor Gas Ltd, with 48CONS, 48 CES and 100CES to bridge the provision of LPG supply to the various tank locations during the feasibility study by the MoD LPG supplier.
III. DESCRIPTION OF THE SUPPLIES/SERVICES REQUIRED TO MEET THE AGENCY’S
NEED.
Under the contemplated contract, Calor Gas Ltd will provide liquid petroleum gas (LPG) utility services (supply, maintenance and tank rental) in support of 41 each facility locations at RAFM and RAFL. Calor maintains the supply of LPG to their systems at or above 10% of the tanks capacity and perform inspection and maintenance each time supply of LPG is provided, to maintain the interoperability of associated pressure limits in safely supplying LPG to the associated base facilities. The period of performance for this effort will be six (6) months beginning 1 April 2013 and ending 30 September 2013. Approximately 758,943 liters of LPG at an estimated total cost of $600,207 will be acquired and the anticipated contract will be funded with fiscal year 2013 Operations and Maintenance funds (O&M - 3400).
IV. STATUTORY AUTHORITY PERMITTING OTHER THAN FULL AND OPEN
COMPETITION.
10 U.S.C. 2304(c), as implemented by FAR 6.302-1 -- Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements, further prescribed by FAR 6.302-1(b)(3), When acquiring utility services, circumstances may dictate that only one supplier can furnish the service.
V. DEMONSTRATION THAT THE CONTRACTOR’S UNIQUE QUALIFICATIONS OR
NATURE OF THE ACQUISITION REQUIRES THE USE OF THE AUTHORITY CITED
ABOVE (APPLICABILITY OF AUTHORITY).
The LPG distribution system to which this contemplated action for the utility of LPG pertains, is described in Section III below with relation to its’ purpose and capabilities. Calor Gas Ltd has been providing the supply of LPG and associated maintenance of its’ various tank locations most recently under contract FA5587-12-P-0024 since 1 October 2012, and previously under Blanket Purchase Agreement FA5587-05-A-0004. The timeframes, contractual framework/agreements, and stipulations regarding Calor’s installation and/or ownership of the various tank locations and associated LPG systems is unknown. Unique and stringent standards regarding the respective supply and maintenance by Calor of their tanks and systems is detailed below in the second subsection, and shall remain the same for the resultant bridge contract. Therefore, this acquisition is for continued performance of a highly specialized service.
The safe operating standards and tank pressure configurations of Calor’s LPG tanks and associated system were presumably commissioned by Calor under their initial contracts/agreements, and are continually required to meet “fail to safe” configurations IAW restrictive UK LPG statutory laws and regulations entailing Health & Safety at Work Act 1974 (HSAW), Gas Safety Installation And Use Regulations 1998 (GSIUR), and Pressure Systems Safety Regulations 2000 (PSSR). These LPG regulations are issued and enforced by UK-law under the premise that the provision of LPG is a highly specialized service, and must be strictly regulated by statute to ensure public safety.
Accordingly, the pressure limits and operational capacity of LPG tanks are considered technically unique to whomever performs the installation (in the case of the immediate requirement subject to this J&A, Calor Gas Ltd), and remain proprietary with that company until ownership is transferred independently, or another system installed by an alternate company.
Due to the highly specialized nature of this requirement, the Government does not and cannot develop the internal/organic expertise to maintain and/or supply Calor’s tanks and associated LPG systems, even if ownership rights were granted to re-compete the requirement. Accounting for the pending site visit/assessment and feasibility study under MoD’s recently awarded contract however, there may be potential for a direct transfer of ownership by Calor of their tanks/systems, or a new ones installed by MoD’s contractor; if cost duplication in either case does not prove to an extent that is disadvantageous to the Government. Accordingly, the only means for the Government to evaluate the potential for the supply of LPG at the various locations amongst RAFM and RAFL to transition to MoD’s successful offeror, is to conduct the associated site visit during the 6-month timeframe of the immediate bridge-contract action.
48 CES and 100 CES believe that award to any source other than Calor Gas will result in unacceptable delays in fulfilling the Air Force’s requirements. This delay would primarily result because the Government does not possess the internal/organic capability, nor authority, to assume or immediately transfer ownership of Calor’s tanks and associated specialized LPG systems. In the event MODs contractor is either authorized by Calor to assume ownership of their tanks/systems, or approved by MOD to install a new tanks/systems (resultant of the feasibility study by 48 & 100CES), the transfer and/or installation of LPG infrastructure of this nature and magnitude would take a minimum of six (6) months to complete. Resultantly, if a contract with Calor Gas is not executed to bridge and subsequently fulfill 48 CES’ LPG requirements in the interim, the utility of heating and hot water to military family housing areas, temporary living facilities, 48FW Hospital, and fire fighting training apparatuses will become nonexistent; significantly increasing operating costs while compromising the ability of the War-fighter to accomplish specific missions within the tri-base area of RAF’s Lakenheath, Mildenhall, and Feltwell.
VI. DESCRIPTION OF EFFORTS MADE TO ENSURE THAT OFFERS ARE SOLICITED
FROM AS MANY POTENTIAL SOURCES AS DEEMED PRACTICABLE.
The site assessment and feasibility study by 48 CES with the MoD and its’ awardee for purpose of consideration to transition the supply of LPG to the various tank/system locations at RAFM/RAFL accordingly, is resultant of MoDs acquisition; which has already solicited potential sources on a UK-wide basis. Soliciting an identical requirement concurrently was not considered practical or prudent, nor in the best interest of the Government.
VII. DETERMINATION BY THE CONTRACTING OFFICER THAT THE ANTICIPATED
COST TO THE GOVERNMENT WILL BE FAIR AND REASONABLE.
As LPG is a petroleum by-product, its price is largely dependent upon market conditions of crude oil and it is accounted that the continued volatility of associated markets may cause overly inflated prices on a fixed-priced basis. FAR Clause 52.241-8 CHANGE IN RATES OR TERMS AND CONDITIONS OF SERVICE FOR UNREGULATED SERVICES will be included in the contract to ensure that the anticipated cost to the Government and contractor will be fair and reasonable. This clause provides a contract mechanism to bi-laterally negotiate LPG rates monthly (on a pence per liter basis), which will ensure a fair and reasonable price not only to the Government, but also to the contractor. For the intended contract actions, the individual price elements of Calor’s quote will also be evaluated IAW FAR Part 13.106. The Government will rely upon nationally indexed and commercially publicized pricing of LPG in the UK, as well as other RAF Lakenheath/Mildenhall LPG requirements serviced by other UK LPG suppliers, to negotiate fair and reasonable rate changes. As 48 CONS does have other LPG suppliers under separate contracts, price analysis will also entail a comparison of current prices for LPG. Additionally, proposed pricing will be compared with independent government cost estimates, and negotiated with the contractor if necessary.
VIII. DESCRIPTION OF THE MARKET RESEARCH CONDUCTED AND THE RESULTS, OR
A STATEMENT OF THE REASONS MARKET RESEARCH WAS NOT CONDUCTED.
There is no formal market research performed to support this requirement as this contract, once awarded, only serves to bridge the gap between the current contract’s expiration date of 31 March 2013; as a means to potentially transition to MOD’s contract.
IX. ANY OTHER FACTS SUPPORTING THE USE OF OTHER THAN FULL AND OPEN
COMPETITION.
Due to UK LPG-legislation, even if the Government were to acquire or assume ownership of Calor's LPG tanks and associated LPG systems, it is unknown whether they could be legally provided as GFE to another LPG supplier. This approach requires further analysis and coordination between the Government and UK authorities, which will be explored during the pending site visit/feasibility study; hence the need for the immediate six (6) month bridge contract.
X. LIST OF SOURCES, IF ANY, THAT EXPRESSED INTEREST IN THE ACQUISITION.
No other sources expressed direct interest in the immediate contract action, subject to this J&A.
However, reference Section VI of this J&A which details interest by other sources under MoD’s LPG contract.
XI. A STATEMENT OF THE ACTIONS, IF ANY, THE AGENCY MAY TAKE TO REMOVE
OR OVERCOME ANY BARRIERS TO COMPETITION BEFORE MAKING
SUBSEQUENT ACQUISITIONS FOR THE SUPPLIES OR SERVICES REQUESTED.
The analysis and coordination between the Government and UK authorities which will be explored during the pending site visit/feasibility study, is resultant of the MoD’s contract award which did compete this requirement. To become part of the MoD’s contract will be commensurate with like requirements for other base utilities at RAF Lakenheath such as water, electric, and oil; which is currently the agencies action by 48CONS and 48/100CES, to overcome barriers to competition before making subsequent acquisitions for the supply of LPG to associated tanks/systems.
XII. CONTRACTING OFFICER’S CERTIFICATION.
The contracting officer’s signature on the Coordination and Approval document attached evidences this document to be both accurate and complete to the best of his/her knowledge and belief.
XIII. TECHNICAL/REQUIREMENTS PERSONNEL’S CERTIFICATION.
As evidenced by their signatures on the Coordination and Approval Document, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete to the best of his/her knowledge and belief.