| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR ROOF OF BLDG 302 | 0.00 € | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| WO#16200 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ARCHITECTURAL WORKS | ||||||||||
| TRABAJOS DE ARQUITECTURA |
| Eliminación y envío a vertedero de capa de proteccion | |||
| Removal and disposal of protection layer | |||
| 1 | Remove gravel layer of roof | ||
| Eliminacion de capa de grava en cubierta | JOB | LS | |
| 2 | Transport and disposal waste to authorized dump | ||
| Transporte y envío a vertedero de material sobrante | JOB | LS | |
| Total eliminación envío vertedero de capa de protec | |||
| Total Removal and disposal of protection layer |
| Moisture Protection Works | |||
| Trabajos de impermeabilizacion | |||
| 3 | Joint backing installation and miscelaneous works | ||
| Aplicación de fondo de juntas y pequeño material | JOB | LS | |
| 4 | Apply two coats of waterproofing material | ||
| Aplicar dos capas de material impermeabilizante | m² | ||
| Total Moisture Protection Works | |||
| Total trabajos de impermeabilización |
| ARCHITECTURAL WORK |
| RESUMEN TRABAJOS DE ARQUITECTURA |
| Eliminación y envío a vertedero de capa de proteccion |
| Removal and disposal of protection layer |
| Moisture Protection Works |
| Trabajos de impermeabilizacion |
| TOTAL ARCHITECTURAL |
| TOTAL TRABAJOS DE ARQUITECTURA |
| SUMMARY |
| RESUMEN |
| TOTAL ARCHITECTURAL WORK |
| TOTAL TRABAJOS ARQUITECTURA |
| GRAND TOTAL |
| GRAN TOTAL |
| ` | ||
| TOTAL MATERIAL COSTS | 0.00 |
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00
SUBTOTAL 0.00
PROFIT 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
BY:
&"Times New Roman,Regular"CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N