15_AF66_17-1014_Schedule_of_Material_Submittals.xlsx
XLSX spreadsheet 41 KB Posted
- Attached to
- RPR SEWER LINES, MFH Federal contract opportunity
- Solicitation number
- FA557519BA007
About this file
Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contractor_questions.pdf | ||
| Solicitation_-_FA557519BA007.pdf | ||
| 03_Especificaciones_Sp_17-1014_V2.pdf | ||
| 04_Drawings_17-1014.pdf | ||
| 03_Specs_En_17-1014_V2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 17-1014 | PROJECT TITLE |
RPR SEWER LINES, MFH
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NUMBER OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||||||||||
| CERTIFICATE OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | |||||||||||
| APPROVED |
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
SECTION 01 11 00
SCOPE OF WORK, DRAWINGS AND SPECIAL CONDITIONS
| 01 | Construction Schedule | 1 | NTP+7 |
| 02 | Work Plan | 1 | NTP+7 |
| 03 | Work Phasing Plan | 1 | NTP+7 |
| SECTION 01 11 01 |
GENERAL CONDITIONS
| 04 | Warranty letter | 1 | Acceptance+15 |
| 05 | Transit Control Plan | 1 | NTP+10 |
| 06 | Progress Schedule | 1 | NTP+10 |
| 07 | Mobility Plan | 1 | NTP+15 |
| 08 | Quality Control Plan | 1 | NTP+15 |
| 09 | Environmental protection plan | 1 | NTP+15 |
| 10 | Waste & construction debris management certificate | 1 | Acceptance+15 |
| 11 | As-Built drawings | 1 | Acceptance+15 |
| 12 | Spatial Data | 1 | As-Built+10 |
| 13 | Key Personnel | 1 | NTP+15 |
| 14 | Personel listing | 1 | NTP+15 |
| 15 | Health and safety program | 1 | NTP+15 |
| SECTION 02 41 00 |
DEMOLITION
| 16 | Demolition Plan | 1 | NTP + 15 |
| 17 | Management and disposal plan for waste from demolition | 1 | NTP+15 |
| SECTION 03 30 00 |
CAST-IN-PLACE CONCRETE
| 18 | Inspection certificate of the concrete batch plant | 1 | NTP + 15 | ||
| 19 | Concrete Control Test Program | 1 | 1 | NTP + 15 | |
| SECTION 31 00 00 |
EARTHWORK
| 20 | Shoring | 1 | |
| 21 | Borrow Site Testing | 1 | |
| 22 | Materials proposed as Backfill | 1 | |
| 23 | Materials proposed as Soil and Topsoil | 1 | |
| SECTION 33 30 00 |
SANITARY SEWER
| 24 | PVC pipe and fittings | 1 |
| 25 | Round manhole (less than 1.2 m depth) | 1 |
| 26 | Round manhole (more than 1.2 m depth) | 1 |
| 27 | Round manhole frame and cover | 1 |
| 28 | Sewer pipe protection film and sealant | 1 |
| 29 | Plan and topographic profile for new pipe installation | 1 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 17-1014 | TÍTULO DE PROYECTO: | |||
| REPARACIÓN LINEA DE SANEAMIENTO, MFH | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | |||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | NUMBER OF COPIES REQUIRED | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | |||||||||||
| CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | |||||||||||
| APROBADO |
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
SECCIÓN 01 11 00
OBJETO DEL TRABAJO, PLANOS Y CONDICIONES ESPECIALES
| 01 | Programa de obra | 1 | NTP+7 |
| 02 | Plan de obra | 1 | NTP+7 |
| 03 | Plan de fases del trabajo | 1 | NTP+7 |
| SECCIÓN 01 11 01 |
CONDICIONES GENERALES
| 04 | Carta de garantía | 1 | Recepción+15 |
| 05 | Plan de control de tránsito | 1 | NTP+10 |
| 06 | Programa de avance de obras | 1 | NTP+10 |
| 07 | Plan de movilización | 1 | NTP+15 |
| 08 | Plan de control de calidad | 1 | NTP+15 |
| 09 | Plan de protección medioambiental | 1 | NTP+15 |
| 10 | Certificado de gestión de residuos y escombros | 1 | Recepción+15 |
| 11 | Planos As-Builts | 1 | Recepción+15 |
| 12 | Datos espaciales | 1 | As-Built+10 |
| 13 | Personal clave | 1 | NTP+15 |
| 14 | Listado de personal | 1 | NTP+15 |
| 15 | Plan de salud y seguridad | 1 | NTP+15 |
| SECCIÓN 02 41 00 |
DEMOLICIÓN
| 16 | Plan de demolición | 1 | NTP+15 |
| 17 | Plan de Gestión y eliminación de residuos procedentes de demolición | 1 | NTP+15 |
| SECCIÓN 03 30 00 |
HORMIGÓN VERTIDO IN-SITU
| 18 | Certificado de inspección de la central de fabricación de hormigón | 1 | NTP+15 | ||
| 19 | Ensayos de control de hormigón | 1 | 1 | NTP+15 | |
| SECCIÓN 31 00 00 |
MOVIMIENTOS DE TIERRA
| 20 | Apuntalamientos | 1 | |
| 21 | Pruebas de Campo | 1 | |
| 22 | Materiales propuestos para relleno | 1 | |
| 23 | Material de relleno propuesto para suelo y tierra vegetal | 1 | |
| SECCIÓN 33 30 00 |
SISTEMAS DE ALCANTARILLADO SANITARIO
| 24 | Tubería y accesorios | 1 |
| 25 | Arquetas de registro circulares menores de 1.2 m de profundidad | 1 |
| 26 | Pozos de registro circulares mayores de 1.2 m de profundidad | 1 |
| 27 | Marcos y tapas de pozos de registro circulares | 1 |
| 28 | Lámina de protección y sellante para tubería de saneamiento | 1 |
| 29 | Planta y perfil topográfico para instalación de nueva tubería | 1 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N
File details come from the government source that posted it.