Schedule of Material Submittals.xls

XLS spreadsheet 147 KB Posted

Attached to
Repair Fire Department Bay Doors, Bldg 1427
Solicitation number
FA5575-08-R-0014
Issued by

About this file

Material Submittals

View the file

Other files

File Type Posted
FA5575-08-R-0014-0001 Amendment 0001.doc DOC document
AF 3052 RevKtor.xlsx XLSX spreadsheet
FA5575-08-R-0014 Solicitation Document.doc DOC document
Attachment 4 - PPI Questionnaire.doc DOC document
Attachment 3 - PPI reference list.doc DOC document
Photos fotos.zip ZIP file
Drawings Planos.zip ZIP file
Spa Specifications.zip ZIP file
Eng Specifications.zip ZIP file
AF 3052.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 08-1023PROJECT TITLE
RPR FIRE DEPARTMENT BAY DOORS, BLDG #1427SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
SECTION 01011
1Safety Plan4Award+14
2Mobility Plan4Commencing+5
3Waste & construction debris management4Final Inspection
4As-Built drawings4FI+30
5Project sign4Award+10
6Warranty letter4FI+30
SECTION 02050
7Program and schedule of the works4NTP+30
8Demolition plan4NTP+30
SECTION 08316
9Doors444NTP+30
SECTION 09900
10Each type of coating and/or other product furnished4NTP+30
SECTION 16402
11Circuit breakers4NTP+30
12Conduit nad fittings , 1 of each type4NTP+30
13Wires and cables4NTP+30
14Junctions boxes4NTP+30
15Panelboard444NTP+30
16Single diagram4NTP+30
170.6/1 kV insulation4NTP+30

&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP)&RPage &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 08-1023TÍTULO DE PROYECTO:
REPARAR PUERTAS DE LAS NAVES DE BOMBEROS, EDIF. 1427SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
APROBADODESAPROBADO
SECCIÓN 01011
1Plan de seguridad4ADJUD+14
2Plan de movilización4Comienzo+5
3Gestión de residuos y escombros4Inspección final
4Planos As-Builts4IF+30
5Cartel informativo de obra4ADJUD+10
6Carta de garantía4IF+30
SECCIÓN 02050
7Programa y plan de obras4NTP+30
8Plan de demolición4NTP+30
SECCIÓN 08316
9Puertas444NTP+30
SECCIÓN 09900
10Recubrimientos y/o todo producto suministrado4NTP+30
SECCIÓN 16402
11Interruptores magnetotérmicos4NTP+30
12Tubos y accesorios, 1 por tipo4NTP+30
13Conductores y cables4NTP+30
14Cajas4NTP+30
15Cuadros eléctricos444NTP+30
16Esquemas unifilares4NTP+30
17Aislamiento de cableado de 0.6/1 kV4NTP+30

&L&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP)&RPágina &P de &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

File details come from the government source that posted it. Updated .