Schedule of Material Submittals.xls

XLS spreadsheet 116 KB Posted

Attached to
Maintain Exterior Electrics Phase 6 Federal contract opportunity
Solicitation number
FA5575-08-R-0007
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Maintain Exterior Electrics Phase 6, newest first.
File Type Posted
Questions and Answers.doc DOC document
Attachment 4 - PPI Questionnaire.doc DOC document
Attachment 3 - PPI reference list.doc DOC document
FA5575-08-R-0007 Solicitation Doc.doc DOC document
Drawings.zip ZIP file
AF 3052.xls XLS spreadsheet
Spanish Specifications.zip ZIP file
English Specifications.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 97-1007 P6PROJECT TITLE:
SUS EXTERIOR ELECTRICS PHASE 6SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
SECTION 01011
1Safety Plan4Award+14
2Mobility Plan4Commencing+5
3Waste & construction debris management4Final Inspection
4As-Built drawings4FI+30
5Project sign4Award+10
6Warranty letter4FI+30
SECTION 16301
7Conduits44Award+30
8Electric manholes44Award+30
9Cables, 1 x type/cross section44Award+30
10Safety switch with fuses44Award+30
11Ground rods44Award+30
12Ground megger4Award+30
13Connections and terminals4Award+30
14Workmen's competency4Award+30
SECTION 16335
15Concrete pole44Award+30
16Guys44Award+30
17Wood crossarms44Award+30
18Hardware44Award+30
19Lighting arresters44Award+30
20Expulsion fuses44Award+30
21Insulators, 1 x type44Award+30
22Copper rod44Award+30
23Prefabricated concrete shelter44Award+30
24Riser panel44Award+30
25Transformer protection panel44Award+30
26High voltage cable RHZ144Award+30
27Transformer protection panel44Award+30
28Low voltage panelboard44Award+30
29Prefabricated concrete panelboard44Award+30
30Laboratory and Tests44Award+30
SECTION 16402
31Circuit breakers4Award+30
32Consuit and fittings, 1 x type4Award+30
33Wires and cables4Award+30
34Junction boxes4Award+30
35Panel board44Award+30
36600 volt wiring4Award+30
SECTION 16520
37Luminaires4144Award+30
38Lamps4Award+30
39Ballasts4Award+30
40Lighting contactors4Award+30
41Photocell switch4Award+30

&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP)&RPage &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 97-1007 F6TÍTULO DE PROYECTO:
SUS INSTALACIONES ELÉCTRICAS EXTERIORES FASE 6SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
APROBADODESAPROBADO
SECCIÓN 01011
1Plan de seguridad4Adjud+30
2Plan de movilización4Comienzo+5
3Gestión de residuos y escombros4Inspección final
4Planos As-Builts4IF+30
5Cartel informativo de obra4Adjud+30
6Carta de garantía4IF+30
SECCIÓN 16301
7Conductos44Adjud+30
8Arqueta eléctrica44Adjud+30
9Cables, 1 x tipo/sección44Adjud+30
10Seccionador con fusibles44Adjud+30
11Picas de tierra44Adjud+30
12Megaóhmetro4Adjud+30
13Dispositivos terminales empalmes4Adjud+30
14Cualificación del personal4Adjud+30
SECCIÓN 16335
15Poste de hormigón44Adjud+30
16Vientos44Adjud+30
17Crucetas de madera44Adjud+30
18Herrajes44Adjud+30
19Autoválvulas44Adjud+30
20Seccionador-fusibles44Adjud+30
21Aisladores, 1 x tipo44Adjud+30
22Varilla de cobre44Adjud+30
23Centro de hormigón prefabricado44Adjud+30
24Celda de remonte44Adjud+30
25Celda de protección del trnsformador44Adjud+30
26Cable de media tensión RHZ144Adjud+30
27Transformador44Adjud+30
28Cuadro de baja tensión44Adjud+30
29Cuadro de hormigón prefabricado44Adjud+30
30Laboratorios y pruebas44Adjud+30
SECCIÓN 16402
31Interruptores automáticos4Adjud+30
32Tubos y accesorios, 1 x tipo4Adjud+30
33Conductores y cables, 1 x tipo4Adjud+30
34Cajas de conexión4Adjud+30
35Cuadros eléctricos44Adjud+30
36Cableado 600 voltios4Adjud+30
SECCIÓN 16520
37Luminarias4144Adjud+30
38Lámparas4Adjud+30
39Reactancias4Adjud+30
40Contactor de alumbrado4Adjud+30
41Interruptores de fotocélula4Adjud+30

&L&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP)&RPágina &P de &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

File details come from the government source that posted it. Updated .