Schedule of Material Submittals.xls
XLS spreadsheet 116 KB Posted
- Attached to
- Maintain Exterior Electrics Phase 6 Federal contract opportunity
- Solicitation number
- FA5575-08-R-0007
About this file
Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.doc | DOC document | |
| Attachment 4 - PPI Questionnaire.doc | DOC document | |
| Attachment 3 - PPI reference list.doc | DOC document | |
| FA5575-08-R-0007 Solicitation Doc.doc | DOC document | |
| Drawings.zip | ZIP file | |
| AF 3052.xls | XLS spreadsheet | |
| Spanish Specifications.zip | ZIP file | |
| English Specifications.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||||||||||||||||||||||
| QUUG 97-1007 P6 | PROJECT TITLE: | |||||||||||||||||||||||
| SUS EXTERIOR ELECTRICS PHASE 6 | SOLICITATION / CONTRACT NO. | |||||||||||||||||||||||
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DISAPPROVED | |||||||||||||||||||||||
| SECTION 01011 | ||||||||||||||||||||||||
| 1 | Safety Plan | 4 | Award+14 | |||||||||||||||||||||
| 2 | Mobility Plan | 4 | Commencing+5 | |||||||||||||||||||||
| 3 | Waste & construction debris management | 4 | Final Inspection | |||||||||||||||||||||
| 4 | As-Built drawings | 4 | FI+30 | |||||||||||||||||||||
| 5 | Project sign | 4 | Award+10 | |||||||||||||||||||||
| 6 | Warranty letter | 4 | FI+30 | |||||||||||||||||||||
| SECTION 16301 | ||||||||||||||||||||||||
| 7 | Conduits | 4 | 4 | Award+30 | ||||||||||||||||||||
| 8 | Electric manholes | 4 | 4 | Award+30 | ||||||||||||||||||||
| 9 | Cables, 1 x type/cross section | 4 | 4 | Award+30 | ||||||||||||||||||||
| 10 | Safety switch with fuses | 4 | 4 | Award+30 | ||||||||||||||||||||
| 11 | Ground rods | 4 | 4 | Award+30 | ||||||||||||||||||||
| 12 | Ground megger | 4 | Award+30 | |||||||||||||||||||||
| 13 | Connections and terminals | 4 | Award+30 | |||||||||||||||||||||
| 14 | Workmen's competency | 4 | Award+30 | |||||||||||||||||||||
| SECTION 16335 | ||||||||||||||||||||||||
| 15 | Concrete pole | 4 | 4 | Award+30 | ||||||||||||||||||||
| 16 | Guys | 4 | 4 | Award+30 | ||||||||||||||||||||
| 17 | Wood crossarms | 4 | 4 | Award+30 | ||||||||||||||||||||
| 18 | Hardware | 4 | 4 | Award+30 | ||||||||||||||||||||
| 19 | Lighting arresters | 4 | 4 | Award+30 | ||||||||||||||||||||
| 20 | Expulsion fuses | 4 | 4 | Award+30 | ||||||||||||||||||||
| 21 | Insulators, 1 x type | 4 | 4 | Award+30 | ||||||||||||||||||||
| 22 | Copper rod | 4 | 4 | Award+30 | ||||||||||||||||||||
| 23 | Prefabricated concrete shelter | 4 | 4 | Award+30 | ||||||||||||||||||||
| 24 | Riser panel | 4 | 4 | Award+30 | ||||||||||||||||||||
| 25 | Transformer protection panel | 4 | 4 | Award+30 | ||||||||||||||||||||
| 26 | High voltage cable RHZ1 | 4 | 4 | Award+30 | ||||||||||||||||||||
| 27 | Transformer protection panel | 4 | 4 | Award+30 | ||||||||||||||||||||
| 28 | Low voltage panelboard | 4 | 4 | Award+30 | ||||||||||||||||||||
| 29 | Prefabricated concrete panelboard | 4 | 4 | Award+30 | ||||||||||||||||||||
| 30 | Laboratory and Tests | 4 | 4 | Award+30 | ||||||||||||||||||||
| SECTION 16402 | ||||||||||||||||||||||||
| 31 | Circuit breakers | 4 | Award+30 | |||||||||||||||||||||
| 32 | Consuit and fittings, 1 x type | 4 | Award+30 | |||||||||||||||||||||
| 33 | Wires and cables | 4 | Award+30 | |||||||||||||||||||||
| 34 | Junction boxes | 4 | Award+30 | |||||||||||||||||||||
| 35 | Panel board | 4 | 4 | Award+30 | ||||||||||||||||||||
| 36 | 600 volt wiring | 4 | Award+30 | |||||||||||||||||||||
| SECTION 16520 | ||||||||||||||||||||||||
| 37 | Luminaires | 4 | 1 | 4 | 4 | Award+30 | ||||||||||||||||||
| 38 | Lamps | 4 | Award+30 | |||||||||||||||||||||
| 39 | Ballasts | 4 | Award+30 | |||||||||||||||||||||
| 40 | Lighting contactors | 4 | Award+30 | |||||||||||||||||||||
| 41 | Photocell switch | 4 | Award+30 |
&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP)&RPage &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||||||||||||||||||||||
| QUUG 97-1007 F6 | TÍTULO DE PROYECTO: | |||||||||||||||||||||||
| SUS INSTALACIONES ELÉCTRICAS EXTERIORES FASE 6 | SOLICITACIÓN / CONTRATO NO. | |||||||||||||||||||||||
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | |||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | ||
| APROBADO | DESAPROBADO | |||||||||||||||||||||||
| SECCIÓN 01011 | ||||||||||||||||||||||||
| 1 | Plan de seguridad | 4 | Adjud+30 | |||||||||||||||||||||
| 2 | Plan de movilización | 4 | Comienzo+5 | |||||||||||||||||||||
| 3 | Gestión de residuos y escombros | 4 | Inspección final | |||||||||||||||||||||
| 4 | Planos As-Builts | 4 | IF+30 | |||||||||||||||||||||
| 5 | Cartel informativo de obra | 4 | Adjud+30 | |||||||||||||||||||||
| 6 | Carta de garantía | 4 | IF+30 | |||||||||||||||||||||
| SECCIÓN 16301 | ||||||||||||||||||||||||
| 7 | Conductos | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 8 | Arqueta eléctrica | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 9 | Cables, 1 x tipo/sección | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 10 | Seccionador con fusibles | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 11 | Picas de tierra | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 12 | Megaóhmetro | 4 | Adjud+30 | |||||||||||||||||||||
| 13 | Dispositivos terminales empalmes | 4 | Adjud+30 | |||||||||||||||||||||
| 14 | Cualificación del personal | 4 | Adjud+30 | |||||||||||||||||||||
| SECCIÓN 16335 | ||||||||||||||||||||||||
| 15 | Poste de hormigón | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 16 | Vientos | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 17 | Crucetas de madera | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 18 | Herrajes | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 19 | Autoválvulas | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 20 | Seccionador-fusibles | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 21 | Aisladores, 1 x tipo | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 22 | Varilla de cobre | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 23 | Centro de hormigón prefabricado | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 24 | Celda de remonte | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 25 | Celda de protección del trnsformador | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 26 | Cable de media tensión RHZ1 | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 27 | Transformador | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 28 | Cuadro de baja tensión | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 29 | Cuadro de hormigón prefabricado | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 30 | Laboratorios y pruebas | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| SECCIÓN 16402 | ||||||||||||||||||||||||
| 31 | Interruptores automáticos | 4 | Adjud+30 | |||||||||||||||||||||
| 32 | Tubos y accesorios, 1 x tipo | 4 | Adjud+30 | |||||||||||||||||||||
| 33 | Conductores y cables, 1 x tipo | 4 | Adjud+30 | |||||||||||||||||||||
| 34 | Cajas de conexión | 4 | Adjud+30 | |||||||||||||||||||||
| 35 | Cuadros eléctricos | 4 | 4 | Adjud+30 | ||||||||||||||||||||
| 36 | Cableado 600 voltios | 4 | Adjud+30 | |||||||||||||||||||||
| SECCIÓN 16520 | ||||||||||||||||||||||||
| 37 | Luminarias | 4 | 1 | 4 | 4 | Adjud+30 | ||||||||||||||||||
| 38 | Lámparas | 4 | Adjud+30 | |||||||||||||||||||||
| 39 | Reactancias | 4 | Adjud+30 | |||||||||||||||||||||
| 40 | Contactor de alumbrado | 4 | Adjud+30 | |||||||||||||||||||||
| 41 | Interruptores de fotocélula | 4 | Adjud+30 |
&L&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP)&RPágina &P de &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
File details come from the government source that posted it. Updated .