CADJ 20-0004 Attachment 2 - Site Layout and Drawings.pdf
PDF 552 KB Posted
- Attached to
- Dining Hall Chabelley Airfield Djibouti, Africa
- Solicitation number
- FA5422-20-Q-30013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CADJ 20-0004 Attachment 3 - AF Form 66.pdf | ||
| CADJ 20-0004 SOW - Dining Hall.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCT DINING FACILITY
CADJ 19-0002
CHABELLEY AIRFIELD, DJIBOUTI
776TH EXPEDITIONARY AIRBASE SQ
HOST BASE COORDINATION/SIGNATURES
PROJECT/
CONTROL NUMBER
ASBESTOS CONTAINING MATERIAL(ACM)
& LEAD BASED PAINT(LBP) STATEMENT
ACM/LBP MATERIALS WILL BE LEFT IN PLACE FOR THIS PROJECT.
ACM/LBP MATERIALS WILL BE REMOVED UNDER THIS PROJECT.
NO SUSPECTED ACM/LBP WAS FOUND DURING VISUAL INSPECTIONS.
THIS PROJECT WILL NOT DISTURB ANY ACM/LBP MATERIALS.
BASE ENVIRONMENTAL
REVIEWED/SIGNED BY:
GENERAL NOTES:
1. ALL DIMENSIONS GIVEN FOR EXISTING CONSTRUCTION ARE TO BE
CONSIDERED APPROXIMATE AND SHALL BE FIELD VERIFIED.
2. VERIFIED DIMENSIONS SHALL APPEAR ON CONTRACTOR SHOP
DRAWINGS PRIOR TO BEING SUBMITTED FOR APPROVAL.
3. SHEET NOTES PERTAIN SPECIFICALLY TO THE SHEET THEY APPEAR ON
UNLESS NOTED OTHERWISE.
4. PATCH AND REPAIR ALL HOLES CREATED BY ABANDONED AND REMOVED
MECH. OR ELECT. PIPING, DUCTWORK AND/OR MATERIALS.
5. THE WORK SHALL PROVIDE A COMPLETE, FINISHED, OPERATING/
FUNCTIONING ASSEMBLY, OR APPARATUS READY FOR USE BY OTHER
CONTRACTORS TO WHICH CONNECTION OR USE IS REQUIRED, AND FOR
ACCEPTANCE BY GOVERNMENT.
6. EACH CONTRACTOR SHALL PROVIDE ALL NECESSARY INCIDENTALS AS
REQUIRED BY HIS WORK EVEN IF NOT SHOWN OR SPECIFICALLY
MENTIONED ON THE DRAWINGS OR IN THE SPECIFICATIONS,
INCLUDING SPECIFIC ITEMS REQUIRED BY CODE TO MAKE THE WORK
COMPLETE.
7. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE PROJECT
PRIOR TO BID. HE SHALL VISIT THE SITE, CHECK & VERIFY ALL
CONDITIONS. STUDY ALL SHEETS OF DRAWINGS AND READ THE
PROJECT STATEMENT OF WORK.
8. ANY SURFACE FINISHES DAMAGED BY DEMOLITION OR NEW
CONSTRUCTION SHALL BE REPAIRED TO MATCH PRIOR CONDITION
UNLESS NOTED OTHERWISE.
9. ALL MATERIALS, EQUIPMENT, DEVICES & INSTALLATION THEREOF
SHALL CONFORM WITH THE FOLLOWING CODES, STANDARDS,
REGULATIONS AND EDITIONS: INTERNATIONAL BUILDING CODE (IBC)
NATIONAL FIRE PROTECTION ASSOC. VOLS 1-16 (NFPA)
INTERNATIONAL PLUMBING CODE (IPC) UNDERWRITERS LABORATORY
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PARTS OF HIS WORK
WHICH MAY BE SHOWN ON ANY SHEET OF THIS SET OR CONTAINED ON
ANY PAGE OF THE SPECIFICATIONS & SHALL EXECUTE ALL WORK IN
A PROFESSIONAL AND EXPEDIENT MANNER.
ANTI-TERRORISM OFFICE:
COMMUNICATIONS:
CHIEF OF PROJECT MANAGEMENT:
ENGINEERING FLIGHT CHIEF:
GROUND SAFETY:
CORROSION CONTROL:
FIRE DEPARTMENT:
CE OPERATIONS:
BASE CIVIL ENGINEER:
THIS FACILITY CONTAINS NO ACM/LBP MATERIAL.
PROJECT INSPECTOR:
PROJECT MANAGER:
AIRFIELD MANAGEMENT:
USING AGENCY:
CHECKED BY:
DRAFTER(S):
BIOENVIRONMENTAL ENGINEERING:
C O
N S
T R
U C
T M
U N
IT
IO
N S
S T
O R
A G
E A
R E
A
C H
A B
E L L E
Y A
IR
F
IE
L D
D
J
IB
O U
T I
T
H E
A B
S
C O V E R
P A G E
CADJ 19-0002
O C T
G-1 1 8
DRAWING INDEX:
DWG. NO. DESCRIPTION SHEET NO.
G-1 COVER PAGE 1
C-1 DINING FACILITY SITE LAYOUT - DEMO 2
C-2 DINING FACILITY SITE LAYOUT - NEW 3
A-1 FLOOR PLAN 4
A-2 EQUIPMENT LAYOUT 5
A-3 DETAILS 6
E-1 POWER PLAN 7
M-1 HVAC PLAN 8
*NOTE: FOR LARGER PROJECTS CREATE/USE ADDITIONAL SHEET*
BASE/VICINITY MAP
ECP
N
S
EW
Feet
13.5
Meters
5.42.70
PROJECT
LOCATION
DINING FACILITY SITE LAYOUT - DEMO
SCALE: 1:500
N
S
EW
GENERAL NOTES:
1. THE CONTRACTOR SHALL VERIFY THE EXACT
LOCATIONS OF ALL OF THE AREAS SHOWN DURING
THE DESIGN PHASE.
2. ALL DESIGNS SHALL BE SUBMITTED FOR REVIEW,
APPROVED/ACCEPTED BY THE PROJECT ENGINEER
PRIOR TO CONSTRUCTION.
PROJECT/
CONTROL NUMBER
SHEET OF
C O
N S
T R
U C
T D
IN
IN
G F
A C
IL
IT
Y C
H A
B E
L L E
Y A
IR
F
IE
L D
D
J
IB
O U
T I
T
H E
A B
S
D I N I N G
F A C I L I T Y
S I T E
L A Y O U T
D E M O
CADJ 19-0002
S S G T
W H A L E N
C-1 2 8
LEGEND
C O
N C
E P
T
BDOC
224A 224B
220A 220B
SDC
BDOC
BDOC
SDC
KEY NOTES:
EXISTING HESCOS TO BE REMOVED FOR DFAC
SITING, AND REPLACED ONCE CONSTRUCTION IS
COMPLETE.
EXISTING VEHICLE MAINTENANCE TENT TO BE
REMOVED AND RELOCATED BY THE GOVERNMENT.
EITHER WAY
P O W E R
P L A N T
R D
DEMO
EXISTING
DINING FACILITY SITE LAYOUT - NEW
SCALE: 1:500
N
S
EW
GENERAL NOTES:
1. THE CONTRACTOR WILL GRADE, AND LEVEL THE
CONSTRUCTION SITE PER THE STATEMENT OF
WORK.
2. CONTRACTOR WILL VERIFY THE ORIENTATION OF
THE FACILITY WITH THE GOVERNMENT
REPRESENTATIVE AND THE CONTRACTING
OFFICER.
PROJECT/
CONTROL NUMBER
SHEET OF
C O
N S
T R
U C
T D
IN
IN
G F
A C
IL
IT
Y C
H A
B E
L L E
Y A
IR
F
IE
L D
D
J
IB
O U
T I
T
H E
A B
S
D I N I N G
F A C I L I T Y
S I T E
L A Y O U T
N E W
CADJ 19-0002
S S G T
W H A L E N
C-2 3 8
C O
N C
E P
T
BDOC
224A 224B
220A 220B
SDC
BDOC
BDOC
SDC
KEY NOTES:
EXISTING REEFER CONEXES TO BE MOVED BY
THE GOVERNMENT AFTER CONSTRUCTION IS
COMPLETE.
EITHER WAY
P O W E R
P L A N T
R D
VEHICLE
FOOD DROP
OFF LOCATION
LEGEND
NEW
DINING FACILITY FLOOR PLAN - PROPOSED
SCALE: NTS
GENERAL NOTES:
1. THE CONTRACTOR WILL VERIFY THE ORIENTATION
OF THE FACILITY WITH THE GOVERNMENT
REPRESENTATIVE.
PROJECT/
CONTROL NUMBER
SHEET OF
C O
N S
T R
U C
T D
IN
IN
G F
A C
IL
IT
Y C
H A
B E
L L E
Y A
IR
F
IE
L D
D
J
IB
O U
T I
T
H E
A B
S
D I N I N G
F A C I L I T Y
S I T E
L A Y O U T
D E M O
CADJ 19-0002
S S G T
W H A L E N
A-1 3 8
ADDITIONAL
REFERENCES AS
REQUIRED
SHEET NUMBER
WHERE DETAIL,
SECTION OR
ELEVATION IS
TAKEN FROM
REFERENCE SYMBOL
DETAIL, SECTION
OR ELEVATION
REFERENCE
ADDITIONAL
REFERENCES AS
REQUIRED
SHEET NUMBER
WHERE DETAIL,
SECTION OR
ELEVATION IS
TAKEN FROM
SHEET NUMBER
WHERE DETAIL,
SECTION OR
ELEVATION IS
SHOWN
DETAIL, SECTION
OR ELEVATION
REFERENCE
NOTE: THIS SYMBOL ONLY APPLIES IF DETAILS,
SECTIONS ARE PLACED ON ANOTHER DRAWING SHEET
C O
N C
E P
T
100'
55'
15'
83'-5"
41'-1113
1 1
4 4
KEY NOTES:
30" WIDTH, STAINLESS STEEL COUNTERTOP
WALL WITH METAL ROLLING SHUTTER DOORS
MAIN DINING ROOM. TABLES, CHAIRS,
REFRIGERATORS, AND TRASH RECEPTACLES,
WILL BE PROVIDED BY THE GOVERNMENT.
EXTRA-WIDE DOORS WITH CYPHER LOCKS.
N
DINING FACILITY FLOOR PLAN - EQUIPMENT LAYOUT CONCEPT
GENERAL NOTES:
1. ALL EQUIPMENT TO INCLUDE: TABLES, CHAIRS,
FRIDGES,FOOD PREP EQUIPMENT, AND TRASH
RECEPTACLES WILL BE PROVIDED BY THE
GOVERNMENT.
PROJECT/
CONTROL NUMBER
SHEET OF
C O
N S
T R
U C
T D
IN
IN
G F
A C
IL
IT
Y C
H A
B E
L L E
Y A
IR
F
IE
L D
D
J
IB
O U
T I
T
H E
A B
S
E Q U I P M E N T
L A Y O U T
C O N C E P T
CADJ 19-0002
S S G T
W H A L E N
A-2 4 8
C O
N C
E P
T
100'
55'
N
5'
5'
5'-117
5'-3 3
MAIN DINING
FOOD PREP
ENTRANCE
EXIT
PROJECT/
CONTROL NUMBER
SHEET OF
C O
N S
T R
U C
T D
IN
IN
G F
A C
IL
IT
Y C
H A
B E
L L E
Y A
IR
F
IE
L D
D
J
IB
O U
T I
T
H E
A B
S
D E T A I L S
CADJ 19-0002
S S G T
W H A L E N
A-2 6 8
GENERAL NOTES:
1.ALL MEASUREMENTS ARE APPROXIMATE.
2. CONTRACTOR WILL PROVIDE THE PRE-ENGINEERD BUILDING,
AND RELATED EQUIPMENT.
C O
N C
E P
T
42'
3'
5'
OVERALL GUIDE WIDTH
FINISHED FLOOR
SLIDE LOCKHANDLE
CLEAR OPENING WIDTH
OVERALL FRAME WIDTH
SHAFT EXTENSION
CHARGE WHEEL
SERVING LINE WALL
SHEET OF
C O
N S
T R
U C
T D
IN
IN
G F
A C
IL
IT
Y C
H A
B E
L L E
Y A
IR
F
IE
L D
D
J
IB
O U
T I
T
H E
A B
S
P O W E R
P L A N
CADJ 19-0002
S S G T
W H A L E N
E-1 7 8
GENERAL NOTES:
1. CONTRACTOR WILL VERIFY THE PLACEMENT OF ALL
ELECTRICAL COMPONENTS WITH THE GOVERNMENT
REPRESENTATIVE, AND CONTRACTING OFFICER.
2. INSTALL TWO ELECTRICAL PANELS, ONE IN THE FOOD
PREP AREA, AND ONE IN THE MAIN DINING AREA.
3. GOVERNMENT WILL DO MAIN POWER HOOK-UP FROM
FACILITY MAIN ELECTRICAL PANEL TO SDC.
C O
N C
E P
T
POWER PLAN
SCALE: NTS
GFI
G F I
G F I
G F I
G F I
G F I
G F I
G F I
G F I
G F I
LEGEND
SINGLE DUPLEX OUTLET
ELECTRICAL PANEL
KEY NOTES:
OUTLETS IN THE FOOD PREP AREA WILL BE
INSTALLED ABOVE THE COUNTERTOP, AND WILL
BE DOUBLE DUPLEX.
1 1
DOUBLE DUPLEX OUTLET
N
PP1
P P
SHEET OF
C O
N S
T R
U C
T D
IN
IN
G F
A C
IL
IT
Y C
H A
B E
L L E
Y A
IR
F
IE
L D
D
J
IB
O U
T I
T
H E
A B
S
H V A C
P L A N
CADJ 19-0002
S S G T
W H A L E N
M-1 8 8
GENERAL NOTES:
1. CONTRACTOR WILL VERIFY THE PLACEMENT OF ALL
HVAC COMPONENTS WITH THE GOVERNMENT
REPRESENTATIVE, AND CONTRACTING OFFICER.
C O
N C
E P
T
HVAC PLAN
SCALE: NTS
LEGEND
MAIN ELECTRICAL PANEL
2 TON SPLIT HVAC UNIT
PP1
P P
N
File details come from the government source that posted it. Updated .