This document is a Questions and Answers file for RFI FA5270-26-Q-A045 regarding gym court dividers for a federal facility.
The primary requirement is the supply and installation of replacement curtain material for an existing gym court divider system. The existing motor, ceiling anchors, and main support bar are in good condition and will remain in place; the contractor must provide all additional materials including cabling, grommets, pulleys, and the mesh curtain material itself. The contractor is responsible for removing the old curtain, wires, and debris. Delivery is required as soon as practical. The quote validity date is 30 September 2026, and appropriated funds are not currently available, with award anticipated before the quote validity date. The Final Destination DoDAAC for post-award invoicing via WAWF is FT9221.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Certificate of Conformance.pdf | ||
| Attachment 2 - Tracy Shipping Instructions .pdf | ||
| Solicitation - FA527026QA045.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI -FA5270-26-Q-A045 Gym Court Dividers
1. Question;
What is the required delivery date for this?
Answer; As soon as practical
2. Question;
Why the item is only curtain material and not the entire system?
Answer; The curtain has many problems (tears, worn grommets, holes) from years of use, the motor, stabilizer bar and anchors are all in good condition.
3. Question;
Does the client require any cabling, grommets, pulleys, etc? or is this strictly the mesh curtain material?
Answer; The motor, ceiling anchors and main support bar are to only items that will be on site, the contractor must provide the rest of the materials.
4. Question;
Are the existing support steel and track systems already in place, or is supply of the complete track system also required?
Answer; The motor, ceiling anchors and main support bar are in place and to be used.
5. Question;
Please provide any other relevant information.
Answer; The old curtain, wires and debris are to be removed by the contractor.
6. Question;
WAWF Final Destination DoDAAC: Attachment 2 (Tracy shipping Instructions) references “Final Destination DoDAAC XXXXX” as the Ship-To DoDAAC from WAWF invoice submission, but the actual DoDAAC Code appears as a placeholder. Could you please provide the correct Final Destination DoDAAC for post-award invoicing?
Answer; Final Destination DoDAAC is FT9221.
7. Question;
Funding Timeline: Per FAR 52.232-18 (Availability of Funds), appropriated funds are not currently available for this contract. Could you provide an estimated timeline for funding confirmation and whether award is anticipated before the quote validity date of 30 September 2026?
Answer; The quote validity date of 30 September 2026.