FA524023R0009 Attachment 1 - Performance Work Statement (PWS).pdf

PDF 260 KB Posted

Attached to
HVAC Water Testing and Treatment Services Federal contract opportunity
Solicitation number
FA524023R0009
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. October 2022

PERFORMANCE WORK STATEMENT

FOR

HVAC Water Testing and Treatment Services

36th Civil Engineering Squadron

Andersen Air Force Base, Guam

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform continuous and safe operations of Heating Ventilation Air Conditioning (HVAC) water treatment systems on Andersen Air Force Base (AAFB), as defined in this PWS.

This maintenance requirement signifies an HVAC service provider (contractor) that takes total service responsibility for all equipment identified. The fixed price includes all inspections, water testing, maintenance of chemical feeding systems, and providing treatment chemicals for water treatment systems. The contractor assumes all responsibility and determines the amount of service visits and types of service required to keep all HVAC systems operating properly and safely within the performance objectives in the Performance Requirements Summary.

Work conducted on HVAC systems shall be In Accordance With (IAW) applicable references listed in Paragraph 6.0, industry standards, and the recommendations of the Original Equipment Manufacturer (OEM).

1.2 Background: The 36th Civil Engineering Squadron provides management and the safe operation of HVAC systems located throughout AAFB. The HVAC systems include closed loop chillers, open loop chillers, boilers, and water softener treatment systems. These systems require testing, inspections, and maintenance/repairs of chemical injection systems, and chemicals for water treatment systems on a recurring basis.

1.3 Period of Performance (PoP): The Period of Performance shall be One Base Period of 9-months and Two 12-month option years.

Base Period: 1 April 2023 – 31 December 2023 Option Year 1: 1 January 2024 – 31 December 2024 Option Year 2: 1 January 2025 – 31 December 2025

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 7:30 a.m. to 4:30 p.m. on Monday through Friday except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. The Contracting Officer’s Representative (COR) or Contracting Officer (CO) must approve in advance, excluding legal holidays, any exceptions to work hours and designated workdays. The contractor must submit a “Request to Work Outside Normal Hours Worksheet” (Technical Exhibit 5), 15 days prior to any work commencing. The performance shall be at AAFB, Guam.

The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.

1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation.

Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance.

The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days (except where otherwise specified in this PWS, i.e. emergencies):

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS, applicable standards, and codes listed in references in Paragraph 6.0. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS).

The QCP shall demonstrate how the contractor ensures quality performance during the contract period of performance. The contractor shall maintain the QCP throughout the period of performance of the contract. The CO shall be provided updates to the QCP as they occur during the period of performance. The QCP shall identify the procedures in writing for inspections, individual responsible, periodic inspection (PI) & preventive maintenance (PM) program, and the location of all inspection records and key control logs which shall always be available to the Government upon request. The QCP shall have the inspection forms and records which shall be used for the service. The contractor shall identify to the CO/COR the responsible quality control inspector to notify in case of customer complaints. A final QCP shall be submitted to the COR NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s acceptance in writing of any proposed changes to its QCP.

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR/CO. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office.

The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation. All commercial vehicles must enter and exit at the North Gate AAFB.

1.4.5.2 The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, names of employees and subcontractor employees, and level of security clearance needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The CO will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.

1.4.5.3 During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

1.4.5.4 When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Integrated Defense, and DODMAN5200.02_AFMAN 16-1405, Air Force Personnel Security Program.

1.4.5.5 Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

1.4.5.6 Failure to comply with these requirements may result in withholding of final payment.

1.4.5.7 For contractors that do not require CAC, but require access to a DoD Facility and/or Installation. The contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)

1.4.5.8 All contractor personnel shall obtain access to the installation by participating in the Defense Biometric Identification System (DBIDS) or by obtaining passes each day from the Base Pass and Identification Office. Cost for obtaining passes through the DBIDS program is the responsibility of the contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge.

1.4.5.9 The contractor shall furnish a completed Employment Eligibility Verification (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer. All contractor personnel shall obtain access to the installation by obtaining passes from the AAFB Visitor Control Center for Andersen Air Force Base, Guam properties.

1.4.5.10 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter.

General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) is located on the ADLS website and refresher OPSEC training is conducted annually (at Commander's Call). The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. As required if AAFB Security Forces determines the need for access to the installation.

http://static.e-publishing.af.mil/production/1/af_a4/publication/afi31-101/generic_wms.pdf https://static.e-publishing.af.mil/production/1/saf_aa/publication/dodman5200.02_afman16-1405/dodm5200.02_afman16-1405.pdf

1.4.5.11 Company Vehicle Identification. The company name and logo shall be displayed on each of the contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid Guam license plate that complies with the Guam Vehicle Code. Vehicles shall meet all other requirement of the Guam Vehicle Code, such as safety standards, and shall carry proof of insurance and Guam registration, if applicable. All vehicles shall be maintained with a clean and orderly appearance. Vehicles shall not be cleaned, washed, or rinsed off on Government property or facilities.

1.4.5.12 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.

Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.6 Physical Security/Access to Buildings. The contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas shall have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas shall wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The contractor shall secure all buildings and facilities entered during non-duty hours and shall secure all building and facilities under the contractor’s cognizance at the end of each work day or shift period.

1.4.6.1. Schedule Coordination. The contractor shall be responsible for coordinating all phases of their operations with the appropriate base personnel through the COR/CO. The facilities shall remain in operation while the contractor is working, and it is up to the contractor to coordinate around the normal activities of the facility. The Government may issue keys to the contractor.

The contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from their action or inaction.

1.4.6.1.1 Contractor shall contact 36 CES, Customer Service at 366-2916/17/18 to apply for any service interruption. Utility outage requests shall be submitted at least thirty (30) calendar days before any outage and coordinated with COR/CO, affected tenants, and customers.

1.4.6.2 The contractor shall make arrangements for Government escort into secured areas requiring escort. The CO shall provide information on applicable buildings, spaces, and the appropriate point of contact. The contractor may experience delays while waiting for escorts.

The Government estimates the wait period can be up to 30 minutes. The contractor shall notify the COR and appropriate point of contract if an escort is not available after 30 minutes or access to accomplish the work is denied. Unscheduled requirements, e.g., trouble calls, may require a longer wait for an escort.

1.4.6.3 Key Control. NOTE: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall include procedures covering key control in the QCP.

1.4.6.3.1 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.

1.4.6.3.2 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the CO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system, and will deduct the total cost from the monthly payment due the contractor.

1.4.6.3.3 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the CO.

1.4.6.4 Lock Combinations: The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.4.7 Special Qualifications: The contractor shall ensure all employees possess the required training, certifications, and licenses for conducting HVAC water testing and treatment services in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information.

(NOTE: The Government does not provide training to contractors.)

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the CO in accordance with FAR 42.5. The CO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the CO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the CO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the CO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the CO within 10 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract;

procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the CO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the CO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the CO. In the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.5 Performance of Services during Crisis Declared by The National Command Authority or The Local Installation Commander. This service meets the criteria for continuation of performance during a crisis.

1.6 Environmental Control. The contractor shall comply, and assure that all subcontractors comply, with all applicable federal, territory, and local laws, regulations, ordinances, policies, and standards related to environmental matters. Where applicable, the contractor shall use environmentally safe products in the course of completion of their project. The contractor shall maintain, in company vehicle on site, Safety Data Sheets (SDS) for all chemicals. A copy of all SDS shall be provided to the CO and COR. The SDS data is subject to random checks by the government. Contractor shall maintain, and provide on demand, an inventory of materials being brought on the Government facility. The contractor shall complete, and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the Government facility. If the contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the contractor shall immediately notify the CO, COR, and appropriate emergency responders. The contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The contractor shall maintain a spill plan as required by federal, territory, and local laws and regulations.

1.7 Asbestos.

1.7.1 The contractor shall be responsible to have a trained “Competent Person” as defined in 29 CFR 1926.32(f) onsite that meets the requirements specified in 29CFR 1926.1101 and is trained in accordance with 40 CFR 763.92(a)(2). It is the Competent Person’s responsibility to ensure any known or suspect Asbestos Containing Materials (ACM) encountered during the performance of this PWS are managed in accordance with all Federal, territory, and local regulations as may be applicable. Any questions regarding suspect or known ACM should be directed to 36 CES Asbestos Program manager.

1.7.2 Miscellaneous Asbestos Debris. The contractor is hereby given notice that miscellaneous asbestos debris from TSI or other sources may be encountered in wall or ceiling cavities, crawl spaces, or chase ways. Any fibrous materials encountered in these areas shall be treated as friable Presumed Asbestos Containing Material (PACM) unless tested and found to be asbestos free.

Any disturbance of ACM or PACM shall comply with all applicable sections of 29 CFR1926.1101. Any abatement activities shall be performed in accordance with 29 CFR1926.1101 or 29 CFR1901.1001 as may be applicable and OAC 3701-34. Any removal or disposal activities shall be performed in accordance with 40CFR 61M and OAC3745-20.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AAFB Andersen Air Force Base AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager CO Contracting Officer COR Contracting Officer’s Representative DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s)

OCI Organizational Conflict of Interest PII Personally Identifiable Information POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Reserved

3.2 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall perform water testing, inspections, and maintenance of chemical injection systems, and providing all treatment chemicals for water treatment systems on a recurring basis. The contractor shall repair chemical feeding systems part of the maintenance to water treatment systems. The contractor shall ensure treatment chemicals are stored IAW hazardous material storage requirements. See Technical Exhibit 3 for HVAC water treatment systems.

5.1 Closed Loop Chiller Water Treatment Systems: The contractor shall determine proper treatment chemicals and procedures to ensure the chiller system functions properly. The contractor shall test water monthly to ensure proper concentration of treatment chemicals, pH levels, and bacteria contamination. The contractor shall use the test results to determine if the system is functioning properly and adjust treatment requirements to ensure continuous and safe operation. See Technical Exhibit 4 for estimated chemical usage.

5.2 Open Loop Chiller Water Treatment Systems: The contractor shall determine proper treatment chemicals and procedures to ensure the chiller system functions properly. The contractor shall test water weekly to ensure proper concentration of treatment chemicals, pH levels, and for bacteria contamination. The contractor shall use test results to determine if the system is functioning properly and adjust treatment requirements to ensure continuous and safe operation. The contractor shall provide all treatment chemicals as a firm fixed price under this contract. See Technical Exhibit 4 for estimated chemical usage.

5.3 Boiler Water Treatment Systems: The contractor shall determine proper treatment chemicals and procedures to ensure the boilers function properly. The contractor shall test water weekly to ensure proper pH levels, phosphates, hardness, chlorides, dissolved solids, sulfites conductance, and dissolved oxygen. The contractor shall use test results to determine if the system is functioning properly and adjust treatment requirements to ensure continuous and safe operation.

The contractor shall provide all treatment chemicals as a firm fixed price under this contract. See Technical Exhibit 4 for estimated chemical usage.

5.4 Water Softeners: The contractor shall maintain and adjust water softeners to ensure proper water hardness for attached HVAC systems monthly. The contractor shall supply salt and refill bins on a recurring basis as a firm fixed price under this contract. See Technical Exhibit 4 for estimated salt usage.

5.5 Repairs: The contractor shall repair deficiencies identified during periodic inspections and preventative maintenance services as well as service calls.

5.5.1 Minor Repairs: During the routine maintenance and required service calls the contractor shall be responsible for any repairs to the systems at the contractor’s expense if the material cost is $2,500.00 or less per system. The contractor shall absorb the labor expenditure. Once identified, the contractor shall ensure all minor repair work is completed within twenty-four (24) hours, unless granted an extension by the COR; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a repair detailed completion report for all repairs to the COR IAW Paragraph 5.7.

5.5.2 Major Repairs: For all repair work above $2,500.00 in labor and material costs, the contractor shall provide a detailed written repair quote to the COR within twenty-four (24) hours of finding the deficiency, and request authorization to proceed. The written repair quote shall include, at a minimum, the following: a complete listing and estimated cost of all material, the labor hours needed to complete the repairs, and the projected time the equipment shall be out of service. The contractor shall be financially compensated for material and labor costs only if CO authorization is granted. At no time shall work in excess of $2,500.00 be completed without CO approval. The contractor shall ensure all major repair work commences within two (2) days of CO approval. The contractor shall ensure that all repair work is completed within ten (10) days of its commencement; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a detailed repair completion report for all repairs to the COR IAW par 5.7.

5.6 Service Calls: In the event that a part of the system fails or malfunctions, the contractor shall respond to service calls within one (1) business day upon notification by the COR. Due to the urgency of mission requirements, the contractor shall ensure that all repair work is completed within two (2) business days unless a major repair is discovered resulting in additional repair time as stated in Paragraph 5.5.2.

5.7 Reports and Documentation: The contractor shall prepare and submit written reports and documentation for the inspections, water testing, and work performed on each system. The reports and documentation shall be forwarded to the COR within two (2) business days of the completion of any service where system deficiencies are found. Otherwise, the reports will be submitted monthly with the invoice. The reports and documentation shall include but not limited to: location, type, manufacturer, and model number of each system; water testing results; work or adjustments performed; repairs completed (if applicable); and overall condition of the equipment. At no time shall any maintenance, modification, or repair be considered complete until a report has been received and accepted by the COR.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition

Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/ current/index.html or https://www.acquisition.gov/dfars

Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/trav elreg.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)

01/23/2014 (Change 1:

07/28/2020) http://www.esd.whs.mil/Directives/issuanc es/dodm

Federal Information Processing Standards (FIPS) Publication 201-

Personal Identity Verification

(PIV) of Federal Employees and Contractors

(paragraph 9)

August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST .FIPS.201-2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program

(PSP)

04/03/2017 https://www.esd.whs.mil/Directives/issuan ces/dodm/

DoDI 5200.46

DoD Investigative and Adjudicative Guidance for Issuing the Common Access Card (CAC)

09/09/14 (Change 1:

05/04/2018) https://www.esd.whs.mil/Directives/issuan ces/dodi/

Homeland Security Presidential Directive (HSPD)-12 Policy for a Common

Identification Standard for Federal Employees and Contractors

08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs

01/29/2019 ces/dodi/

DoD 5400.11-R

Department of Defense Privacy Program

05/14/2007 https://www.esd.whs.mil/Directives/issuan ces/dodm/ DoDD 8140.01

Cyberspace Workforce Management

10/05/2020 ces/dodd/

DoD 8570.01-M

Information Assurance Workforce Improvement Program

12/19/2005 (Change 4:

11/10/2015)

DoD 5220.22-M 02/28/2006 https://www.esd.whs.mil/Directives/issuan https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars http://www.esd.whs.mil/Directives/issuances/dodm http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/

National Industrial Security Program Operating Manual

(NISPOM)

(Change 2:

05/18/2016)

AFI 10-245

Antiterrorism

03/28/2013 (Certified current 03/30/2017) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID

=1&series=-1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and

Procedures

08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID

=1&series=-1&modID=449&tabID=131

AFMAN 31-113

Security Forces Standards and Procedures

03/05/2013 Change 1:

12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID

=1&series=-1&modID=449&tabID=131

AFPD 17-1

Information Dominance Governance and Management

04/12/2016 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID

=1&series=-1&modID=449&tabID=131

AFMAN 17-1301

Computer Security (COMPUSEC) 02/12/2020 https://www.e-publishing.af.mil/Product-

Index/#/?view=pubs&orgID=10141&catID =1&series=-1&modID=449&tabID=131

AFI 10-701

Operations Security

7/24/2019 (Change 1:

06/09/2020) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID

=1&series=-1&modID=449&tabID=131

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

DD 1172-2

Application for Identification Card/DEERS Enrollment

Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm

I-9 Employment Eligibility

Verification

10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i- 9.pdf

DD 441

Department of Defense Security Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms000 1-0499.htm

DD 250

Material Inspection and

Receiving Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/ http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance Objective Performance Standard

Acceptable Quality Levels

(AQL)

Surveillance Method / By

Whom

5.1 Closed Loop Chiller Water

Treatment Systems

The contractor shall determine proper treatment chemicals and procedures to ensure the chiller system functions properly.

The contractor shall test water monthly to ensure proper concentration of treatment chemicals, pH levels, and bacteria contamination. The contractor shall use the test results to determine if the system is functioning properly and adjust treatment requirements to ensure continuous and safe operation.

Meets the standard 95% of the time.

Periodic Inspection / COR

5.2 Open Loop

Chiller Water Treatment Systems

The contractor shall determine proper treatment chemicals and procedures to ensure the chiller system functions properly.

The contractor shall test water weekly to ensure proper concentration of treatment chemicals, pH levels, and for bacteria contamination. The contractor shall use test results to determine if the system is functioning properly and adjust treatment requirements to ensure continuous and safe operation. The contractor shall provide all treatment chemicals as a firm fixed price under this contract.

Meets the standard 95% of the time.

Periodic Inspection / COR

5.3 Boiler Water

Treatment Systems

The contractor shall determine proper treatment chemicals and procedures to ensure the boilers function properly. The contractor shall test water weekly to ensure proper pH levels, phosphates, hardness, chlorides, dissolved solids, sulfites conductance, and dissolved oxygen. The contractor shall use test results to determine if the system is functioning properly and adjust treatment requirements to ensure continuous and safe operation. The contractor shall provide all treatment

Meets the standard 95% of the time.

Periodic Inspection / COR chemicals as a firm fixed price under this contract.

5.4 Water

Softeners

The contractor shall maintain and adjust water softeners monthly to ensure proper water hardness for attached HVAC systems.

The contractor shall supply salt and refill bins on a recurring basis as a firm fixed price under this contract.

Meets the standard 95% of the time.

Periodic Inspection / COR

5.5.1 Minor Repairs

The contractor shall perform minor repairs and replacements of the chemical feeder systems as part of the monthly inspections and maintenance services. Minor repairs are defined as repairs under $2,500.

Meets the standard 99% of the time.

Periodic Inspection / COR

5.5.2 Major Repairs

…If during the maintenance/repair/inspection, the contractor recommends work not priced elsewhere in contract, the contractor shall submit an Over and Above Work Order

Request with a detailed cost estimate to the COR within twenty-four (24) hours. All

Over and Above requests exceeding $2,500.00 shall be routed by the COR to the CO for a fair and reasonable determination.

The contractor shall not proceed with the over and above repair work until the work order has been approved by the CO…

Meets the standard 99% of the time.

Periodic Inspection / COR

5.6 Service Calls

In the event that a part of the system fails or malfunctions, the contractor shall respond to service calls within one (1) business day upon notification by the COR…

Meets the standard 99% of the time.

Periodic Inspection / COR

5.7 Reports and

Documentation

The contractor shall prepare and submit written reports and documentation for the inspections, water testing, and work performed on each system. The reports and documentation shall be forwarded to the COR within two (2) business days of the completion of any service where system deficiencies are found…

Meets the standard 95% of the time.

Periodic Inspection / COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title Frequency Number of

Copies Medium/Format Submit To

1.4.1 Request to

Work Outside Normal Hours

Worksheet

15 days prior to any work commencing outside of normal work hours 1 Electronic COR

1.4.3 Quality

Control Plan

Within 30 calendar days of contract award 1 Electronic COR

1.4.5.2 List of

Employees

Within 15 calendar days of contract award and when adding or removing employees

1 Electronic Submission COR

1.4.7 Employee

Certifications

Within five (5) business days prior to certification/licensing 1 Electronic COR

1.4.10.1 Identification

Media

Return within 14 days of employee’s departure from contract performance

Original(s) Hard Copy CO

5.5.2 Major Repairs

Within 24 hours of deficiency to the COR 1 Electronic

Submission COR

5.7 Reports and

Documentation

Within two (2) business days of work 1 Electronic

Submission COR

TECHNICAL EXHIBIT 3

Estimated Workload Data

The estimated workload data is predicated on current known requirements and does not reflect a commitment or guarantee of firm work due to the dynamic mission of Andersen AFB. The quantities listed on the bid schedule reflect the HVAC systems that shall be serviced which could change due to mission requirements, facility modifications or budgetary constraints.

Facility Number Facility System Type Equipment Frequency

32 DET 2 Boiler 2 ea - PULSAtron electric metering pumps Weekly

25010 Magellan Inn Boiler 3 ea - PULSAtron electric metering pumps Weekly

26006 Top of the Rock Boiler 2 ea - PULSAtron electric metering pumps Weekly

1091 Sunrise Conference Center Closed Loop Chilled Pot Feeder

Monthly

17000 36 MXS Closed Loop Chilled Pot Feeder Monthly 17002 AMC Terminal Closed Loop Chilled Pot Feeder Monthly 18001 36 CES Closed Loop Chilled Pot Feeder Monthly 18006 36 MXS Closed Loop Chilled Pot Feeder Monthly 20011 36 COMM Closed Loop Chilled Pot Feeder Monthly

21006 Airman Leadership School Closed Loop Chilled Pot Feeder Monthly

23002 Comm Closed Loop Chilled Pot Feeder Monthly 22003 Wing HQ Closed Loop Chilled Pot Feeder Monthly 22024 Chapel 1 Closed Loop Chilled Pot Feeder Monthly

22026 Consolidated Support Closed Loop Chilled Pot Feeder Monthly

23020 Security Forces Closed Loop Chilled Pot Feeder Monthly 23028 36 MSG Closed Loop Chilled Pot Feeder Monthly 24016 Base Exchange Closed Loop Chilled Pot Feeder Monthly 25005 Gecko Lanes Closed Loop Chilled Pot Feeder Monthly 25010 Magellan Inn Closed Loop Chilled Pot Feeder Monthly 25014 Base Chiller Plant Closed Loop Chilled Pot Feeder Monthly

25014 Base Chiller Plant Open Loop Chilled

2 ea ‐ PULSAtron electric metering pumps

1 ea ‐ PULSAtron controller

Weekly

25010 Magellan Inn Water Softener Monthly 25014 Base Chiller Plant Water Softener Monthly 26006 Top of the Rock Water Softener Monthly

TECHNICAL EXHIBIT 4

The Estimated Chemicals are for previous treatment plans. The contractor will determine current needs and adjust treatment plans as necessary.

Chemicals Systems Total Annual Usage Salt Pellets (40lbs) Water Softeners x 3 1500 bags NALCO 3DT231 Open-Loop Chiller 330 gals NALCO ST70 Open-Loop Chiller 330 gals NALCO 90005 Open-Loop Chiller 165 gals NALCO BC2036 Boilers x3 110 gals NALCO 356 Boilers x3 220 gals NALCO 22352 Boilers x3 220 gals NALCO B2338 Boilers x3 110 gals Sodium Nitrite Closed-Loop Chillers x 18 330 gals

Technical Exhibit 5

REQUEST TO WORK OUTSIDE NORMAL DUTY HOURS

(Page intentionally left blank. The current form will be provided at award.)

Technical Exhibit 6

UTILITY OUTAGE COORDINATION

(Page intentionally left blank. The current form will be provided at award.)

TECHNICAL EXHIBIT 4

File details come from the government source that posted it. Updated .