AMENDMENT 1 Q_A.docx

DOCX document 16 KB Posted

Attached to
36 CES/CEF CONNEX-CONTAINERS
Solicitation number
FA524023Q3001
Issued by

View the file

Other files

File Type Posted
AMENDMENT 1 Q_A.pdf PDF
image3.jpg JPG image
image001.jpg JPG image
image2.jpg JPG image
image1.jpg JPG image
image002.jpg JPG image
COMBO_CONNEX_signed.pdf PDF
Attachment 2-Salient Characteristics for Connex.pdf PDF
Attachment 1-STATEMENT OF WORK Connex.pdf PDF
Attachment 3- Provision and Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 1, QUESTIONS AND ANSWERS.

1. I would like to request a site inspection to see the area we will need to lift the existing container off the stilts and place new units on. Pictures were submitted within the solicitation on SAM.gov. Please use them for reference.

2. Most containers are made in China. Are containers made in China acceptable to offer? Yes, None U.S Containers will be accepted.

3. Solicitation calls for NEW containers are single use containers acceptable? Most new containers are loaded with cargo for its first trip to cut the cost of shipping. Container must be New.

4. Are single use containers acceptable if the production dates are more than 4 years old? No Containers shall be New, IAW PWS.

5. 1.1 REQUIREMENTS: Contractor will remove and dispose of the current Heavy-duty typhoon proof wire for both the 8’ X 40‘and 8’ X 20’ Steel Storage container located at Andersen Fire Department Training Grounds. Contractors will move both (8’ X 40‘and 8’ X 20’) containers from the stilts to the side and place them on a flat level grass area no more than 200 feet away. Placement of both Conn-ex Containers will be determined by a Fire Department POC. Contractor will deliver both NEW 8’ X 40‘and 8’ X 20’ Steel Storage Containers to Andersen Fire Department Training Grounds. Contractor will place both 8’ X 40‘and 8’ X 20’ Steel Storage container on stilts that are already in place. Contractor will secure both 8’ X 40‘and 8’ X 20’ Steel Storage container to the stilts using heavy-duty typhoon proof wire (2 for each Conn-ex Container. One in the front end and one on the back end on both). Contractor will dispose of any excess material. In the absence of other agreements negotiated with respect to time provided for government review, deliverables will be inspected, and the contractor notified of the POC's findings within 10 work days of the submission of the deliverable by the contractor. 36 CES/CEF is responsible for the final inspection and acceptance of all deliverables under this requirement. The CO and CES will coordinate and be responsible for the final inspections and acceptance.

6. 3.1 PASS AND IDENTIFICATION ITEMS: Escort will be provided to the contractor by Andersen Fire Department personnel. The contractor shall ensure that the contactors have proper identifications that is real-identification compliant (real-ID driver’s license w/ gold star or passport) or a driver’s license accompanied with a birth certificate to get on to the installation. If our employees have a dbids ID are these additional ID's still required? Is the location of the jobsite on the runway or other area that will require escorts if our employees/drivers have a dbids ID? ID's used to enter Andersen AFB will suffice. Job site is at the North West Training Field.

7. 3.8 MILITARY EXERCISES: No compensation will be claimed for any delays resulting from re-entry procedures due to exercises. Will the contracting office advise us of any exercises so that we do not send our employees out and not be able to access the work site? Yes, Once awarded we will work out the details.