EXHIBITS_A_B_C_-_Pricing_Schedules.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
PRE-STRESSED/PRE-CAST CONCRETE WALLS AND DOUBLE TEE BEAMS IDIQ
Solicitation number
FA5240-16-R-0002
Issued by

About this file

Exhibits A B C - Pricing Schedules

View the file

Other files

File Type Posted
Attachment_1_-_Statement_of_Work_28_JAN_2016.pdf PDF
FA5240-16-R-0002.pdf PDF
Attachment_3_-_PPQ.docx DOCX document
Attachment_3_-_Cover_Letter.pdf PDF
Attachment_2_-_Drawings_15_DEC_2015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ EXHIBITS A, B, C

EXHIBIT A PRE-STRESSED/PRE-CAST IDIQ REQUIREMENTS - BASIC YEAREXHIBIT B PRE-STRESSED/PRE-CAST IDIQ REQUIREMENTS - OPTION YEAR 1EXHIBIT C PRE-STRESSED/PRE-CAST IDIQ REQUIREMENTS - OPTION YEAR 2
CLINWall Type**PANEL HEIGHTQuantityUnit PriceTotalCLINWall/Roof TypePANEL HEIGHTQuantityUnit PriceTotalCLINWall/Roof TypePANEL HEIGHTQuantityUnit PriceTotal
A001W128 FT40B001W128 FT40C001W128 FT40
A002W228 FT4B002W228 FT4C002W228 FT4
A003W328 FT1B003W328 FT1C003W328 FT1
A004W428 FT4B004W428 FT4C004W428 FT4
A005W528 FT1B005W528 FT1C005W528 FT1
A006W628 FT4B006W628 FT4C006W628 FT4
A007W728 FT4B007W728 FT4C007W728 FT4
A008W828 FT4B008W828 FT4C008W828 FT4
A009W928 FT1B009W928 FT1C009W928 FT1
A010W1028 FT1B010W1028 FT1C010W1028 FT1
A011W1128 FT1B011W1128 FT1C011W1128 FT1
A012W1224 FT20B012W1224 FT20C012W1224 FT20
A013W1324 FT2B013W1324 FT2C013W1324 FT2
A014W1424 FT1B014W1424 FT1C014W1424 FT1
A015W1524 FT2B015W1524 FT2C015W1524 FT2
A016W1624 FT1B016W1624 FT1C016W1624 FT1
A017W1724 FT2B017W1724 FT2C017W1724 FT2
A018W1824 FT2B018W1824 FT2C018W1824 FT2
A019W1924 FT2B019W1924 FT2C019W1924 FT2
A020W2018 FT18B020W2018 FT18C020W2018 FT18
A021W2118 FT3B021W2118 FT3C021W2118 FT3
A022W2218 FT2B022W2218 FT2C022W2218 FT2
A023W2318 FT1B023W2318 FT1C023W2318 FT1
A024W2418 FT2B024W2418 FT2C024W2418 FT2
A025W2518 FT1B025W2518 FT1C025W2518 FT1
A026W2618 FT1B026W2618 FT1C026W2618 FT1
CLINRoof TypeBeam LengthQuantityUnit PriceTotalCLINRoof TypeBeam LengthQuantityUnit PriceTotalCLINRoof TypeBeam LengthQuantityUnit PriceTotal
A02724DT870 FT 6 IN39B02724DT870 FT 6 IN39C02724DT870 FT 6 IN39
A02824ST470 FT 6 IN3B02824ST470 FT 6 IN3C02824ST470 FT 6 IN3
A02924DT858 FT 6 IN13B02924DT858 FT 6 IN13C02924DT858 FT 6 IN13
A03024ST458 FT 6 IN1B03024ST458 FT 6 IN1C03024ST458 FT 6 IN1
A03124DT846FT 6 IN13B03124DT846FT 6 IN13C03124DT846FT 6 IN13
A03224ST446FT 6 IN1B03224ST446FT 6 IN1C03224ST446FT 6 IN1
TOTAL COST (BASIC YEAR)$ - 0TOTAL COST (OPTION YEAR 1)$ - 0TOTAL COST (BASIC YEAR 2)$ - 0
**Note: Actual wall order will denote with a "C1" or "C2" after wall panel number for wall panels that requires continuous corbel for Double T Placement. The number denoted will reference height from panel for proper sloping of roof. Example "W17-C1" or "W10-C2". Estimated costs are the same for both. Reference drawings for details regarding wall panels, continuous beam placement, sloping and roof types

TOTAL IDIQ COST (3 yr) $ - 0

FA5240-16-R-0002 Exhibits A, B, C 5 Jan 2016

File details come from the government source that posted it. Updated .