Attachment 05 - Industry Day Consolidated Questions - Final.pdf
PDF 223 KB Posted
- Solicitation number
- FA521526N0002
About this file
This document is an Industry Day Questions and Answers record for federal contract opportunity FA521526N0002 regarding Maui Base Operations Support Services and Construction.
The Government is pursuing a two-contract acquisition strategy: one Base Operations Support (BOS) contract and one construction Multiple Award Construction Contract (MACC) with an anticipated 4-12 awardees using NAICS code 236330. Both contracts are expected to be solicited separately in Fiscal Year 2027, with a draft RFP and official RFP anticipated sometime during that period. The contract type will be Firm Fixed Price (FFP) with one or more FFP Not to Exceed CLINs for Over and Above projects and travel, estimated at approximately $30 million per year in construction and over-and-above work volume. No set-aside has been determined at this time, though historically this requirement was met under the 8(a) program. The incumbent contractor holds a collective bargaining agreement with the International Brotherhood of Electrical Workers, Local 1260 (AFL-CIO). Payment and performance bonding will be required per RFO Part 28 unless otherwise stated in the solicitation.
The requirement covers 15 facilities on Maui under 15th Space Surveillance Squadron cognizance, including operations at the summit of Haleakala at over 10,000 feet elevation. Key performance outcomes include timely performance, control of project costs, and positive working relationships. A new 40,000 square-foot MILCON facility in Kihei is expected to reach beneficial occupancy in December 2027, with transition anticipated prior to any new BOS contract award. The Government will provide access and training to Builder, NextGen, and Defense Property Accountability System logistics systems, with mandatory use required. A 60-to-90-day phase-in period will overlap with the incumbent contract, with zero lapse in service expected. All key personnel must be based on Maui, though select administrative positions may be negotiated. Clearance requirements, detailed facility information, baseline asset condition data, historical workload data, performance expectations (KPIs, SLAs, response times), and various appendices will be provided in the anticipated draft RFP.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maui Base Operations Support Services and Construction
Industry Day Questions
FA521526N0002
Q1: Under the current single-package structure, one program manager oversees IT operations, construction delivery, and facility O&M at the same time. How does the Government expect a single prime to maintain qualified, cleared, expert-level leadership across all three at once, and has it considered whether dedicated program managers per scope would produce better-prioritized execution?
A1: The Government is considering a multitude of approaches and will take this question in consideration when discussing an acquisition strategy. Currently each section has a function area lead that manages each section.
Q2: Given the notice's reference to one or more contract solutions, what is the Government's leading acquisition strategy at this point, a single integrated award, separate awards by scope (BOS, construction, IT), or a hybrid such as a stand-alone construction MACC paired with a BOS or IT prime?
A2: While a solution has not been finalized the Government’s current preference is a two-contract solution: one Base Operations Support (BOS) contract and one construction Multiple Award Construction Contract (MACC).
Q3: What is the projected timeline for the draft RFP release, final RFP, and award, and does the Government plan to release a draft PWS for industry comment before the final solicitation?
A3: Draft PWS was included in the sources sought and industry day posts. Please refer back to notices FA521526N0001 and FA521526N0002. The Government does anticipate sending a Draft Request for Proposal (RFP) and an official RFP sometime in FY27.
Q4: Is a set-aside or socioeconomic preference being contemplated (8(a), SDVOSB, HUBZone, WOSB, SDB, or full and open), and would that preference apply uniformly across all scopes or vary by scope?
A4: There is no set aside at this time. Historically this requirement has been met under the 8(a) program.
Q5: The notice references a possible Multiple Award Contract for construction projects.
Will the construction MAC be issued under a separate solicitation from BOS, what is the anticipated number of awardees, and what NAICS code will it use?
A5: The anticipated NAICS for any resulting MACC is 236330. If a two-contract solution is determined, they will be solicited separately. The Government anticipates anywhere between 4-12 MACC contractors. The final number will be determined at a later date.
Q6: How will the new 40,000 sq ft MILCON facility at Lipoa Parkway change the BOS, O&M, and IT scopes once operational, and is that transition reflected in the planned period of performance?
A6: The Government anticipates the transition to the MILCON facility to take place prior to award of any new BOS contract.
Q7: What is the current Government oversight structure for the bundled contract (KO, COR, and QAEs by scope), and how is that oversight model expected to evolve under the next acquisition?
A7: The Government oversight structure shall follow all DAFI instructions and FAR Regulations.
Q8: What lessons learned has the Government captured from the current 2023 sole-source contract, particularly around inter-scope prioritization and transition continuity, that are shaping the next acquisition strategy?
A8: All lessons learned are being used in shaping the acquisition strategy and requirement.
Q9: What are the Government's top three performance outcomes for this contract beyond simply meeting the stated PWS requirements and AQLs?
A9: Beyond the PWS requirements, the government desires timely performance, control of project costs, and a positive working relationship.
Q10: Section 2.1 sets a goal of achieving VPP “Star” site certification. Is this a hard contractual requirement with a milestone date, or a performance incentive/goal? What support (or restrictions) will the government provide toward this objective?
A10: VPP “Star” site certification is no longer required. This requirement shall be removed from the official RFP.
Q11: Which performance areas have historically presented the greatest challenges or risks under previous contracts, and where would the Government most like to see innovation and improvement?
A11: The IT/Core communications functional area was first brought in under the current contract. The government is open to innovation and improvement in all functional areas.
Q12: Would the Government support contractor-proposed performance dashboards, predictive analytics, and continuous improvement initiatives that provide real-time visibility into quality, safety, logistics, facilities, and IT performance?
A12: Refer to the PWS for Quality Control requirements. As stated previously, the government is open to innovation and improvement in all functional areas.
Q13: What would the Government consider the characteristics of an exceptional contractor partner that materially improves mission readiness, operational efficiency, and stakeholder satisfaction over the life of the contract?
A13: Good communication and responsiveness are two valued characteristics.
Refer to the PWS for further expectations.
Q14: We understand that the PWS covers 15 Facilities on Maui under the 15 SPSS cognizance, but what % of personnel responsibilities are anticipated to be located at each of the SPSS facilities (i.e. MSSC, Kihei Headquarters, Kahului Logistics Center, etc.?)
A14: Locations of personnel are to be determined post MILCON Building move.
The percentage may fluctuate depending on the services required per location.
Q15: Which key personnel positions are anticipated to be required to be based on Maui and which positions are allowed to be in a few hours proximity (i.e. Oahu or Big Island)?
A15: Key personnel must all be on Maui. Please reference PWS for emergency response times. Select administrative positions may be negotiated but must adhere to work hours as stated in the PWS.
Q16: Scope & Boundaries - Can the Government provide a definitive list of facilities, infrastructure, IT systems, and any exclusions within the MBSS scope, including delineation of responsibilities between MBSS and other on-site entities?
A16: The Government will provide this information in the anticipated draft RFP.
Q17: Baseline & Asset Condition - Will the Government provide baseline data on the current condition of facilities, infrastructure, and IT systems?
A17: The Government will provide this information in the anticipated draft RFP.
Q18: Workload & Demand Drivers Can the Government share historical workload data (maintenance, logistics, IT tickets) and identify any seasonal or mission-driven surge requirements?
A18: The Government will provide this information in the anticipated draft RFP.
Q19: Performance Expectations - What are the anticipated KPIs, SLAs, and required response/resolution times across facilities, logistics, and IT services?
A19: The Government will provide this information in the anticipated draft RFP.
Q20: Incumbent & Staffing - Can the Government provide incumbent staffing levels, labor categories, and any expectations regarding workforce transition or retention?
A20: The Government expects offerees to develop and submit their own proposed staffing plans for this requirement.
Q21: IT Scope & Cyber Requirements - What IT systems and networks are included in MBSS-IT, and what cybersecurity frameworks (e.g., RMF, IL levels) will apply?
A21: The Government will provide this information in the anticipated draft RFP.
Q22: Logistics & Government-Furnished Property - What systems are currently used for property accountability and logistics, and what GFE/GFP will be provided?
A22: The Government will provide this information in the anticipated draft RFP.
Q23: Facilities Projects & A/E Support - Are there known major repair, renovation, or demolition projects, and what level of A/E and construction management support is expected?
A23: Projects for FY28 and beyond are not known at this time. All available information will be shared at solicitation if in the best interest of the government.
Q24: Transition Approach - What is the anticipated phase-in period, and what transition support (data, systems, incumbent knowledge transfer) will be provided?
A24: The Government anticipates a 60-to-90-day phase in period. Please reference draft PWS Phase In/Phase out, Section 10.
Q25: Future Scope & Growth - How should offerors account for evolving mission requirements, emerging technologies, and potential scope growth?
A25: Any changes to the contract shall be made via contract modification if deemed necessary.
Q26: Contract Structure - What contract type and CLIN structure is the Government considering, particularly for variable or emerging requirements?
A26: The anticipated contract type is Firm Fixed Price (FFP) with one or more FFP Not to Exceed (NTE) CLINs for Over & Above projects and Travel.
Q27: Site & Mission Considerations - Are there Maui-specific constraints (logistics, environment, access) or tenant coordination challenges that will impact performance?
A27: Logistics: 15 SPSS is a geographically separated unit with facilities located on the summit of Haleakala over 10,000 feet in altitude, with 1–2-hour commute times to the summit.
Environment: The Government must abide by Federal and State Env regulations and work in cooperation with community stakeholders.
Access: Commercial vehicle access to the summit must be coordinated through the National Park Service (NPS). Requests can have long lead times for approval.
Other: There are a multitude of other organizations and contractors working at 15 SPSS sites. This requires robust communication and coordination.
Q28: Sec 1.2. What Key Personnel are required to be based full time on Maui? What positions could be based on Oahu?
A28: Key personnel must all be based on Maui. Please reference PWS for emergency response times. Select administrative positions may be negotiated but must adhere to work hours as stated in the PWS.
Q29: Sec 1.2 SS-1 a) For key personnel when you state they cannot be dual-hatted does that apply to only positions in this contract?
A29: The expectation is that key personnel are dedicated to the contract and only one position on the contract.
Q30: General - Does the contractor need to have a business license with the State of Hawaii?
A30: Contractor must follow all federal and state regulations. Certain facilities reside on state land.
Q31: What specific issues do you face that are unique to area where these facilities are located, the facilities themselves, or their use?
A31: See answer to Question 27.
Q32: Are there one or more pain points that need solutions? What problems are you trying to solve?
A32: All pain points will be captured as PWS requirements.
Q33: In what areas could improvements or innovation improve execution of tasking?
A33: As stated previously, the government is open to innovation and improvement in all functional areas.
Q34: Are there resources integral to the execution of tasking that you would like to remain regardless of contractor?
A34: There are no known integral resources that must remain at this time.
Q35: In what areas could improvements or innovation potentially improve execution of tasking?
A35: As stated previously, the government is open to innovation and improvement in all functional areas. There are no specific areas the government has deemed higher in priority.
Q36: Several appendices referenced throughout the draft Primary PWS and Supplemental IT PWS (Appendix X) were not included in the posted package. For example, the logistics/supply workload factors (Appendix 28), the Preventive Maintenance Task Listing, grounds and custodial performance standards, equipment/inventory lists, water and wastewater workload estimates, and the mission-critical equipment list. Will the Government release these appendices, along with any existing OEM maintenance agreements for major installed systems (chillers/BAS, fire suppression, elevators/inclinators, and bridge cranes), with or in advance of the solicitation so vendors can scope staffing and recurring maintenance accurately?
A36: The Government will provide this information in the anticipated draft RFP.
Q37: To support transition planning, will the Government provide incumbent workforce information with the solicitation, including current staffing levels by labor category, applicable wage determinations and any collective bargaining agreement, the incumbent clearance inventory, and any anticipated phase-in constraints or timelines?
A37: As stated previously, the Government expects offerees to develop and submit their own proposed staffing plans for this requirement. The applicable wage determinations shall be incorporated into any solicitation and resulting contract. The incumbent contractor does have a collective bargaining agreement with the International Brotherhood of Electrical Workers, Local 1260 (AFL-CIO) (IBEW1260). The Government will provide a copy of the collective bargaining agreement if able. The government anticipates a 60-to-90-day phase in period, which will overlap with the incumbent contract. See Section 10 of the draft PWS for Phase-in/Phase-out requirements.
Q38: For the Mt. Haleakala summit site, can the Government identify any access constraints that contractors should plan around, including Haleakala National Park permitting, vehicle or delivery restrictions, and any high-elevation or hours-of-access limitations affecting recurring maintenance, deliveries, and emergency response? Given the virtual format of this event, will the Government also offer a site visit for both the Kihei and Haleakala locations at a later point?
A38: The contractor must adhere to the National Park Services (NPS) Site access rules. Site access restrictions and guidance will be included in the solicitation.
The Government does anticipate offering an in-person site visit. Any site visit will be announced on sam.gov and in the solicitation.
Q39: Will the Government release the appendices referenced in the draft Primary
Performance Work Statement (PWS) and the Information Technology PWS (Appendix
X) but omitted from the posted package, specifically the logistics and supply workload factors (Appendix 28), the Preventive Maintenance Task Listing, grounds and custodial performance standards, equipment and inventory lists, water and wastewater workload estimates, and the mission critical equipment list, along with any existing original equipment manufacturer (OEM) maintenance agreements for major installed systems, with or before the formal solicitation?
A39: The Government will provide this information in the anticipated draft RFP.
Q40: Will the Builder equipment and condition data, and the Builder and NextGen historical cost data, be released to all offerors with the request for proposal, or only to the awardee after award?
A40: The Government will provide this information in the anticipated draft RFP.
Q41: If the Government adopts the Base Operations Support (BOS) plus Multiple Award
Construction Contract (MACC) structure, will the MACC be competed separately and on what anticipated timeline, and will the BOS contractor's construction management role over MACC awardees be a separately priced line item or a level of effort within the BOS scope?
A41: If a two-contract solution (one BOS and one MACC) is determined, they will be solicited separately. The Contract Line-Item structure has not been finalized.
The structure will be available in the anticipated draft RFP.
Q42: For the projected over and above and construction volume of up to approximately
30 million dollars per year, what payment and performance bonding will the Government require, and will it apply at the task order or project level, in the aggregate, or both?
A42: Payment and performance bonding shall be required in accordance with
RFO (Revolutionary FAR Overhaul) Part 28 - Bonds and Insurance, unless otherwise stated in the solicitation.
Q43: For draft PWS Table 7-1, does the Government intend to remove or adjust the 50 labor hour threshold, and do the labor hour and material thresholds operate independently, such that exceeding either one reclassifies the work as a facility project?
A43: Exceeding any threshold within table 7-1 shall reclassify the work as a facility project. However, the government may make changes to any or all of the thresholds in Table 7-1. The anticipated draft RFP will include any of these changes.
Q44: Will the Government confirm the required clearance level by labor category, specifically Secret, Top Secret, or Top Secret with Sensitive Compartmented Information access, and whether a documented phase in clearance plan is acceptable for positions filled or transitioned after award?
A44: All clearance requirements will be provided in the anticipated draft RFP. See draft PWS Section 3 for additional information regarding clearance requirements.
Q45: Will the Government provide incumbent workforce information with the solicitation, including staffing by labor category, the applicable wage determinations and any collective bargaining agreement, and the cleared personnel inventory by clearance level?
A45: See answer to Question 37.
Q46: For the Mt. Haleakala summit site, will the Government identify access constraints affecting recurring maintenance, deliveries, and emergency response, including
Haleakala National Park permitting and vehicle or delivery restrictions, and will it offer an in-person site visit to both sites before the request for proposal?
A46: See answer to Question 38.
Q47: For the new military construction facility at Kihei to be occupied in 2028, will the
Government provide design and as built documentation, equipment submittals, commissioning data, and OEM warranty information at occupancy, and will warranty period maintenance be excluded from the contractor's preventive and corrective maintenance responsibility?
A47: The government shall provide all documentation available in the anticipated draft RFP. The government does anticipate all warranty work to be managed by the selected contractor for this effort (actual work to be coordinated with the warranty originator/builder).
Q48: Will the Government furnish access, licenses, and training for the Builder, NextGen, and Defense Property Accountability System (DPAS) based logistics systems, or must the contractor provide its own systems, and will use of the Government systems be mandatory?
A48: The government shall provide access and training to these systems. Use of these government systems shall be mandatory.
Q49: Regarding the 2023 fuel release at the installation, will any ongoing remediation, monitoring, or compliance obligations transfer to the BOS contractor, and will the related documentation be provided with the solicitation?
A49: No ongoing remediation, monitoring, or compliance obligations shall be transferred to a future prime contractor under this effort. However, the prime shall be responsible for the overall site environmental program.
Q50: Will the Government communicate the set aside determination and the single contract versus BOS plus MACC decision in the draft request for proposal, or earlier?
A50: The government anticipates set-aside determinations to be provided with the draft RFP.
Q51: What major construction projects (cost, magnitude, and schedule) are planned to be conducted at the site during the proposed period of performance?
A51: See answer to Question 23.
Q52: Is there currently a CBA on the contract?
A52: See answer to Question 37.
Q53: What level of clearance is required? What percentage of the employees have to have the clearance?
A53: See answer to Question 44.
Q54: Will the contractor provide CMMS for contract operations?
A54: There is no requirement for the contractor to provide CMMS for contract operations at this time.
Q55: Is the Government using this vehicle to consolidate multiple existing or previous needs, such as the existing Kupono contract FA521523C0003 and/or the previous Calista contract FA521517C8005?
A55: Contract FA521523C0003 is the incumbent contract and contract FA521517C8005 is the previous incumbent contract. This requirement is a follow-on for contract FA521523C0003. This effort does not consolidate any existing or previous requirements.
Q56: Noting that these requirements have historically been 8(a), is the government considering or open to this requirement being full and open competition?
A56: No set-aside has been determined at this time. Market research is being conducted to determine the most advantageous acquisition strategy for the government. However, please note the requirements of Title 13 of the CFR section 124.504(d).
Q57: Does the government anticipate that bundling the construction, and/or construction management, into a single solicitation to be advantageous? If so, how does the government anticipate evaluating this capability?
A57: Market research is being conducted to determine the most advantageous acquisition strategy for the government. While a solution has not been finalized the Government’s current preference is a two-contract solution (one BOS contract and one MACC).
Q58: Noting the updated guidance regarding acquisition strategy, does the government anticipate this award being a fixed-price contract? If so, does the government anticipate favoring companies with experience operating similar contracts as fixed price?
A58: The government does anticipate a firm fixed price contract at this time. See answer to Question 26. Evaluation factors will be contained within the anticipated draft solicitation.
Q59: What has been the most successful element of the existing contract?
A59: Contract performance under the incumbent contract cannot be disclosed.
Q60: What has been the least successful element, or most challenging element, of the contract?
A60: Contract performance under the incumbent contract cannot be disclosed.
Q61: Is the government open to the inclusion of advanced technologies, to include geospatial technologies, predictive maintenance platforms, and/or IoT sensors integration, into the Base Operations methodology of this contract, and if so, would they be willing to favor companies that proposed advanced technologies that demonstrate value to the Government?
A61: As stated previously, the government is open to innovation and improvement in all functional areas. Evaluation factors will be contained within the anticipated draft solicitation.
Q62: Mission Readiness & Operational Risk: Based on your experience with current and prior MBSS performance, which specific elements across civil engineering, IT/core communications, logistics, environmental, or mission-support operations present the greatest current or emerging risks to mission readiness? For each area identified, what indicators or trends are driving concern, and where can industry provide the most meaningful risk-reduction support?
A62: The Government cannot identify or prioritize specific current or emerging mission-readiness vulnerabilities, performance concerns, or operational risk indicators beyond information released through the solicitation and associated industry-day materials. Offerors should base their proposed approaches on the stated Performance Work Statement (PWS), historical information or attachments made available equally to all prospective offerors, site conditions, and their independent assessment of the requirements. Any additional Government-validated requirements, performance data, or clarifications will be provided through the formal solicitation process and made available to all prospective offerors.
Q63: Labor Environment & Workforce Requirements: Reflecting on prior performance at
MSSC and RME, what labor-related requirements, such as union agreements, paid travel time, mandated work rules, or unique site conditions, have historically created the greatest performance or cost risk? What insights does the Government want the next contractor to understand or plan for differently?
A63: See answers to Questions 27 and 37.
Q64: Local Workforce & Leadership Integration: What challenges has the Government observed when mainland or off-island leadership integrates with the local Maui workforce, and what leadership approach, communication methods, or local-hire expectations are most critical to ensuring a successful contractor–Government partnership?
A64: No challenges have been directly observed by the Government. The leadership approach, communication methods, and hiring practices are in the purview of the contractor.
Q65: High-Altitude Operational Challenges: The summit elevation has historically affected personnel sustainment and retention. Which roles or functions have been most impacted by altitude, weather, or commute demands, and what mitigation strategies has the Government found most effective, or expects the next contractor to implement, to ensure reliability and continuity of operations?
A65: High-Altitude operational challenges include inclement weather, loss of commercial power, long commutes to and from summit, and additional physical demand on the body. The contractor should be flexible and proactively plan for these challenges.
Q66: Transition Risks & Legacy Conditions: Are there any known legacy conditions, workforce sensitivities, operational constraints, or site-specific practices that have previously complicated contractor transitions? What should industry proactively plan for to ensure a smooth, interruption-free transition from day one?
A66: See answer to Questions 24 and 27.
Q67: Are you having problems/operational difficulties finding local subcontractors to go to Maui? Are you experiencing consequences from drydock on Oahu?
A67: Maui’s geographical location and population may present challenges to contractors operating there. There are no known consequences from “drydock” on Oahu affecting this contract.
Q68: Is there any concern about incumbent Alaka'ina being acquired by Alaskan Native (ANC) by Bering Strait?
A68: There are no concerns.
Q69: Do you have a project list for Construction? What types, values, timelines, etc?
A69: See answer to Question 23.
Q70: With this having such a large IDIQ for CON, what kind of past performance are you looking for to qualify both construction and O&M?
A70: The anticipated draft solicitation will provide relevancy and recency requirements for past performance if used as an evaluation factor.
Q71: What prompted the direct award/sole source on the incumbent contract?
A71: This information is not available.
Q72: What acquisition strategy is the Government currently considering (8(a), small business, or another approach), and what factors will drive the final decision?
A72: The Government will provide this information in the anticipated draft RFP.
Q73: Is the Government leaning toward consolidating construction requirements or separate acquisitions?
A73: See answer to Question 2.
Q74: What concerns are driving the evaluation of consolidated versus separate construction approaches?
A74: The Government evaluates (at a minimum) all decisions based on cost, performance, and schedule.
Q75: If construction remains part of the requirement, what capabilities and experience will be most important when evaluating offerors?
A75: The Government will provide this information in the anticipated draft RFP.
The anticipated draft solicitation will provide relevancy and recency requirements for past performance if used as an evaluation factor
Q76: Does the Government anticipate using a similar evaluation approach as the 2016 procurement (Limited Tradeoff LTO best value?)
A76: No acquisition strategy has been selected at this time. The Government will provide this information in the anticipated draft RFP.
Q77: Will the Government require technical, management, staffing, transition, or key personnel proposal volumes that were not required in the 2016 procurement?
A77: The staffing requirements may change based on mission requirements. The Government will provide any changes in the anticipated draft RFP. Note that the most recent procurement was accomplished in 2023 and did differ from the 2016 contract.
Q78: How does the Government anticipate evaluating affiliate-company, sister-company, predecessor-company, joint venture, and subcontractor past performance, and what weight will be given to directly performed prime-contract experience relative to corporate-family experience?
A78: See answer to Question 70.
Q79: Is the Government primarily seeking proven execution and low-risk operations, or are modernization, innovation, automation, and AI-enabled capabilities areas of interest?
A79: The government is open to innovation and improvement in all functional areas.
Q80: What does success look like for the follow-on contractor?
A80: Timely completion of all PWS requirements, as well as over and above projects.
Q81: What aspects of the current contract are working particularly well and what areas would the Government most like improved?
A81: Contract performance under the incumbent contract cannot be disclosed.
Q82: What are the biggest operational challenges facing MSSC, AMOS, and related facilities today?
A82: See answer to Question 27.
Q83: What workforce challenges exist today, including recruiting, retention, and cleared staffing?
A83: The primary challenge of note is the high cost of living on Maui.
Q84: What transition risks concern the Government most?
A84: The transition of all functional areas are of concern to the Government. The expectation is to have a successful transition (over the 60-to-90-day transition period) with 0 lapse in service.
Q85: Will the government confirm if the qualified SME QCM overseeing the
Construction project efforts is a separate requirement from the QC Manager outlined in
Section 1.2.6 – QC Manager?
A85: The current draft PWS doesn’t have a SME QCM position. Note, this is subject to change. Any changes will be incorporated in the anticipated draft RFP.
Q86: Section 2.9.1 is referenced for IT specific QC requirements, however is not included. Please advise if Attachment_02_FA521526N0001_Supplemental_IT_PWS_Appendix_X contains all IT-specific QC requirements.
A86: Yes. Attachment 2 (Supplemental IT PWS Appendix X) contains all IT-specific Quality Control requirements. The citation in Main PWS paragraph 1.9.4 referencing Section 2.9.1 is an incomplete reference rather than an omission of requirements. Offerors are advised that IT Quality Control requirements are located within Appendix X under Section 2.7 (Quality Control Plan), Section 2.9.1 (Self Inspection/Management Program - MICT), and Chapter 10 (Service Summary Items), in addition to the overarching quality requirements in Section 1.9 of the Main PWS.
Q87: If additional space is needed, is mobilizing an office trailer to the summit site an option?
A87: Government will require additional information if pursuing additional worksite facilities and the facilities must adhere to federal and state regulations.
There is no guarantee any accommodation of this nature will be approved.
Q88: Is there an option to take over the incumbent contractors current warehouse and storage space?
A88: The current warehouse is a contractor leased facility and is not in the purview of the Government. Note that the MILCON facility will have space for logistics operations if the transition to the MILCON is made prior to award of this effort.
Disclaimer: Artificial Intelligence tools were used to transcribe the following questions from recordings:
Q89: Have you experienced issues with having outside vendors trying to do work on Maui?
A89: We have not had any issues with outside vendors trying to do work on Maui.
Q90: Do you guys have issues with people coming from outside trying to execute the work?
A90: We have not had any issues with outside vendors trying to execute work on Maui.
Q91: So like your engineer, if they could support multiple projects? Your ARCGIS person, if they could support multiple projects?
A91: Multi-skilled engineers are desirable.
Q92: Does the contractor need to have a business license within the state of Hawaii?
A92: Contractor must follow all federal and state regulations. Certain facilities reside on state land.
Q93: When are you guys going to make that decision on what you're going to do with the construction?
A93: Any decision will be publicized on Sam.gov.
Q94: You mentioned 30 million a year, is that funding pretty steady coming in or is that something that you never know if you're going to have it or not? Or can you talk about that at all?
A94: Over and above projects are funded at the project level, and actual work volume is dependent on the needs and funding available to the Department of the Air Force.
Q95: If you guys were to split that off and have the construction contract, would you... in the BOSS contract have a level of that work that you up to say $1,000,000 a year or 2 million or 3,000,000 something like that, is that something you'd consider?
A95: In the event of a two-contract solution, the BOS contract is expected to still have an over and above CLIN for smaller projects. The CLIN ceiling has not yet been determined.
Q96: Is there any of the 30 million going to be as the task orders or is that going to be require a bond?
A96: See answer to Question 42.
Q97: Are you looking at or considering any sort of you know past performance rating to where there's favorability applied for people that do contingency environments or remote environments?
A97: See answer to Question 70.
Q98: The previous [Tunista] contract, is that Tunista family contract, is that part of that that's getting rolled into this as well? Is this [going] be side by side? Is there any overlap there?
A98: This requirement is a follow on of the current contract with Kupono Government Services, LLC (contract # FA521523C0003), which was a follow on of the contract with Tunista (contract # FA521517C8005).
Q99: [in reference to internship opportunities]...and I'm not aware of other potential vocational schools or community colleges that we might be able to tap into. So that was one of my questions.(Asking about alternatives to the University of Hawaii Maui on the island) A99: The Government does not have information available at this time regarding local internship opportunities.
Q100: There's mention of transportation for MBSS employees. I understand it correctly, it's up to the Haleakala facility.
A100: The government has previously and currently provides GOVs for the contractor to use, and any GFE will be available in the anticipated draft RFP.
Q101: Is it a sort of like a daily shuttle situation or is it more ad hoc?
A101: There is no shuttle available. Please reference answer to Question 100 for additional transportation information.
Q102: Are there any CMMS requirements?
A102: See answer to Question 54.
Q103: Is the Air Force is looking into using Oasis plus or GSA mass?
A103: The is no intent to use these services at this time.
Q104: What is most important to you and the customer on site?
A104: Of most importance is timely adherence to the PWS while following all state and federal regulations.
Q105: It was mentioned that the 50 hours you seem concerned about might be removed. Was there a reason for it being removed and the thresholds?
A105: The Government is considering removing the 50-hour threshold as in some cases it has created an unnecessary limit on timely completion of work. See answer to Question 43.
Q106: What are the 15th SPSS's and the 766's goals or objectives that you need to achieve in transition, making sure there's a smooth transition between contracts?
A106: Reference the phase in/phase out requirements contained section 10 of the draft PWS.
Q107: ..as the Space Force continues to grow, where do you see the challenges as you go into the future, especially with the new MILCON building and just as the INDOPACOM dynamics shifts, what do you see as the biggest challenges for the Maui location?
A107: See answer to Question 6 regarding the new MILCON building. The most significant upcoming challenge is expected to be the increase in magnitude of over & above projects over the life of this effort.
Q108: ...when you think about the priorities that you have, again some of those we just mentioned, what will prevent you from achieving those top priorities and goals?
A108: The contractor must be successful in all functional areas. There are no specific areas the government has deemed higher in priority
Q109: Given that unique environment, what does that look like for you when you're looking for something that you might expect at a more normal location? Is it efficiencies? Is it, you know, certain processes that quality standards?
A109: See answer to Question 27 regarding challenges in Maui.
Q110: The current base operations, what are they staffed at?
A110: See answer to Question 20.
Q111: How many FTE [Full-Time Equivalents] do they have on site?
A111: See answer to Question 20.
Q112: How are they reporting on work orders? Like corrective maintenance or service calls. What? How are? How is that happening right now? Like if the users are up at camp and they said, “Hey my windows broken”, how do they report that? Is that a call center? Is that demo? Is that a service ticket?"
A112: The Government provides systems to submit and track work orders.
Q113: So question, do we have attic stock for majority like ceiling tiles? Do we have attic stock? Is that something we would be expected to keep on hand? Like if we were to ramp up, we get the contract A113: Reference section 4.2.8 regarding critical spares.
Q114: Do we have a turnover place? Where they have attic stock of just the real basic PM and corrective maintenance such as ceiling tiles?
A114: See answer to Question 113. The incumbent contractor may also have existing onsite inventory of non-critical spare materials. These materials are not property of the Government.
Q115: Will we have access to like a year's worth of trouble of calls just because if you know if it's a common occurrence, if we have like floor tiles, we've had 75 calls for floor tiles...? Are we Privy to? Are we going to have that opportunity to see a year's worth of service calls so we can... have a plan, a proposal that addresses it all?
A115: This information is stored in the Government owned system, NextGen. The Government will provide this information in the anticipated draft RFP.
Q116: Is it Tier 1 Tier 2 help desk types of responsibility as well, or is there external support to for those networks? So we're looking at Tier 1, Tier 2 help desk, IT help desk support?
A116: Tier 1 and Tier 2 help desk support/responsibilities are required (IT Communication focal point requirements).
Q117: Who is going to map the silver swords? Is that part of the environmental [work]...?"
A117: Mapping of silversword plants (critically endangered plants on the summit of Haleakala) is a part of the environmental work under this effort.
Q118: Is there warehouse space down by 550 or somewhere on the island? Is that for us to find or do you have warehouse space that is already [available]?
A118: See answer to Question 88.
Q119: When will the MILCON building be completed?
A119: The tentative construction completion date is June 2027 and the anticipated beneficial occupancy December 2027. These dates are subject to change.
Q120: If we had to bring cranes and other specialty equipment up, will that be reimbursable or is that expected to come at risk?
A120: For firm fixed priced work the Contractor assumes the risk. Over and above work is priced at the project level. If necessary, crane rental can be a line item on an over and above project.
Q121: Would experience in lieu of a degree apply? (Asking if 10 years of experience could trade off for degree requirements) A121: Degree requirements and experience will be reflected in the PWS. Any waiver will be granted on a case-by-case basis by the Contracting Officer with input from the Contracting Officer Representative.
Q122: How many TS's [Top Secret clearances] do you have on the island?
A122: This information is unavailable.
Q123: Will all the IT Folks be TS and the other folks be secret?
A123: The minimum clearance requirement is secret, and certain positions require top secret clearance. Reference draft PWS Section 1.
Q124: Do you have any really large new projects that maybe we should know about?
A124: See answer to Question 23.
Q125: What are you guys currently doing for QA or oversight for that 40,000 square foot building that you guys have, if that's something you guys are doing in house or contracted out?
A125: The prime contractor is expected to have internal quality assurance of their own work as well as for all subcontractors. Additionally, the Government shall conduct its own quality assurance on the prime and subcontractors.
Q126: What is the overarching objective is for possibly breaking it out the contract between [a BOS] and [MACC]?
A126: The overarching objective is to find the best approach for continued base operation support and the increased magnitude of over and above projects in the areas of cost, schedule, and performance.
Q127: Based on your experience with the current and prior MBSS performance, which specific elements across civil engineering, IT, core communications, logistics, environmental or mission support operations presents the greatest current or emerging risks to mission readiness?
A127: All functional areas of the contract are essential to mission readiness. As stated previously, there are no specific areas the government has deemed higher in priority.
Q128: What labor related requirements such as Union agreements, paid travel time, mandated work rules or unique site conditions have historically created the greatest performance or cost risks in your opinion?
A128: See answers to Question 37 on union agreements and Question 83 for labor related cost information.
Q129: What challenges has the government observed when mainland or off island leadership integrates with the local Maui workforce? And what leadership approach, communication methods rather or local higher expectations are most critical to ensure success?
A129: See answer to Question 64.
Q130: Were you also asking if we would involve local small business and not exclude, for example, small businesses that are in the neighborhood from participating?
A130: This requirement is subject to all small business requirements under Revolutionary FAR Overhaul (RFO) Part 19.
Q131: There was a union in place before. Is there still a union in place?
A131: See answer to Question 37.
Q132: I know in the past when I've been up there, there was a line item or some type that there's a bus that brings the folks up to the island [mountain]. Is that still ongoing?
Is that the something that the government accommodates or is that something that we bid into...?
A132: See answer to Question 100.
Q133: Is that other building in the Kihei facility? The one that you're going to bring on in 2028 [2027/2028]?
A133: See answer to Question 119.
Q134: I know that there's been problems in the past and I don't know this—I know this from contractors with the elevator maintenance. Is that getting a qualified person to certify—is that problem ongoing?
A134: There is no problem with elevator maintenance at this time.
Q135: Is your supply facility still in Kahului or are you—do you intend to move that into the new facility in Kihei?
A135: See answer to Question 88.
Q136:..is there an evacuation plan that the Air Force utilizes for evacuating the mountain, or is that something that you would like the contractor to propose?
A136: The Government has a safety position that coordinates emergency response plans to include evacuation of the summit. See draft PWS section 2.0 for Safety requirements and deliverables (CDRLs).
Q137: Do we require any piece of that be coordinated with by the contractor to submit that you're aware of?" (Replying to CO's statement that safety is government-managed) A137: Any changes to safety requirements will be incorporated in the anticipated draft RFP.
Q138: Will there be a joint inventory scheduled during transition? For all of the real property?
A138: See answer to Question 106.
Q139: How are you doing QASP for the existing contract and how are you tracking all of that? And what are your plans to stick to that methodology or evolve for the recompete.
(Asking about the Quality Assurance Surveillance Plan / quality oversight approach) A139: See answer to Question 125.
Q140: In the PWS there was a, you know, a goal of achieving the VPP [Voluntary Protection Program] star site certification. And we're curious whether that that was a hard contractual requirement or it was a performance incentive goal.
A140: See answer to Question 10.
Q141: "...that information should be getting captured somewhere and then some oversight on your part or maybe sharing with it and stuff like that? Do you do something like that now or are you thinking about doing something like that in the new contract?"
(Using preventative maintenance as an example of capturing quality records) A141: See answer to Question 115.
Q142: So your PWS is going to say do it in accordance with the playbook? (Clarifying whether playbooks and the Preventative Maintenance Task List [PMTL] are explicitly called out as compliance standards) A142: Yes, the PWS requires preventative and corrective maintenance to be accomplished in accordance with the Preventative Maintenance Task List (PMTL) in NextGen.