Attach 1 - PWS Heavy Equipment.pdf
PDF 126 KB Posted
- Solicitation number
- FA521524QAR02
About this file
This document is a Performance Work Statement (PWS) for Heavy Equipment Rental Services at Saipan International Airport. The U.S. Air Force requires the contractor to provide various types of heavy equipment, including dump trucks, water distributor trucks, flatbed trucks, and skid-steers, for a period of 3-15 April 2024. The contractor is responsible for maintenance, fuel, and ensuring the equipment is operational at all times to support government operations. The solicitation number is FA521524QAR02, with a quote due date of 27 March 2024 at 1000 Hawaii Standard Time. The Department of the Air Force Pacific Air Forces is the procuring agency. The PWS outlines the specific equipment required, including capacities and weights, as well as the maintenance and fuel requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 2 - Clauses and Provisions.pdf | ||
| FA521524QAR02 - Heavy Equipment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
AR24 Heavy Equipment Rental Services, Saipan International Airport
1.0 SCOPE OF WORK.
In accordance with the schedule of supplies and services, the Contractor shall support the U.S. Air Force members who require heavy equipment at Saipan International Airport.
The Contractor shall provide the heavy equipment listed in this PWS to include maintenance and fuel services.
2.0 DESCRIPTION OF SERVICES.
The Contractor is responsible for supplying the heavy equipment as outlined in this PWS.
CLIN Description Qty Unit of Issue 0001 Dump Truck with Pintle Hook – Para 2.1 13 Days 0002 Water Distributor Truck – Para 2.2 13 Days 0003 16’ Flatbed Truck – Para 2.3 (3 each) 13 Days 0004 Skid-Steer – Para 2.4 13 Days
2.1 Dump Truck with Pintle Hook:
Load capacity: 10 Ton Transmission: Automatic Fuel: Gas or Diesel Weight: Approx. 15,000 kg
2.2 Water Distributor Truck:
Load capacity: 3,000 Gallons Transmission: Automatic Fuel:
Gas or Diesel Weight: Approx. 15,000 kg Weight: Approx. 15,000 kg 4 Wheel Drive with Lift Gate
2.3 16 Flatbed Truck:
Load capacity: Approx. 7,000 lbs Transmission: Automatic Fuel: Gas or Diesel Weight: Approx. 19,000 lbs 2 Wheel Drive
2.4 Skid-Steer:
Load capacity: Approx. 6,000 kg Transmission: Automatic Fuel: Gas or Diesel Weight: Approx. 4,000 kg Fork & Bucket Attachments
3.0 MAINTENNACE
Contractor shall provide preventive maintenance and 24-hr maintenance to support for mechanical or serviceability issue.
4.0 FUEL
The Contractor must keep all equipment are fueled and operational at all times to prevent any interruption in Government operations.
5.0 LOCATION
Saipan International Airport 4P9H+V8R, I Fadang, Saipan 96950, CNMI
6.0 LOCAL CONTRACTOR COORDINATION
The Contracting Officer and appointed Contractor Coordination Representative will be responsible for ensuring the Contractor to provide the requested services, overseeing initial installation, and reporting service interruptions.
Contractor Coordination Representative:
Capt Parker Searing, parker.searing.1@us.af.mil MSgt Robert Taron, robert.taron@us.af.mil
1st Lt Kai Chatfieldkinjo, kai.chatfield-kinjo.2@us.af.mil MSgt Aaron Washington, aaron.washington.2@us.af.mil
7.0 PERIOD OF PERFORMANCE
3 – 15 April 2024
8.0 POINTS OF CONTACTS AND AUTHORITIES
The Contracting Officer is the sole individual authorized to approve any changes to the requirements of this contract and provisions contained elsewhere in this contract; the authority remains solely with the Contracting Officer. In the event the Contractor affects any change in the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority, and no adjustment will be made in the contract price as a result of the change.
9.0 CONTRACTUAL RELATIONSHIPS
Contractor personnel shall always be under the supervision of the Contractor and not under the supervision of the Government or any of its employees. The Contracting Officer will bring discrepancies or noncompliance with the contract clauses, specifications, or PWS to the Contractor’s supervisor or foreman for necessary corrective action.
10.0 LIABILITY
The U.S. Government accepts no liability for the actions of the Contractor or their employees.