WAKE ISLAND POWER PLANT GENERATOR #3 REPLACEMENT
STATEMENT OF WORK
QUOTE REQUEST
22 May 2019
1. SCOPE: This Statement of Work (SOW) defines the effort required to replace/install generator #3 located at power plant at Wake Island Airfield.
2. BACKGROUND:
2.1. The Wake Atoll consists of three islands (Wake, Peale and Wilkes) with a combined area of 2.85 square miles, set just north of the Marshall Islands. The island houses 150 contractors and government employees and supports hundreds of transpacific flights yearly. Many of the facilities on the island were constructed in the 40’s, 50’s and 60’s.
2.2. Generator #3, located inside the site power plant, is approaching its operating overhaul duty hours and will require a replacement on or around October 2019, +/-, dependent on actual usage hours and funding. Ensure Generator #3 replacement is the exact make and model of the existing generator, can provide the same operations and functions, in tandem with the other generators, and can be installed to current replacement generator location, including all existing hookups such as exhaust locations, controls, electrical/bonding feeders, JP-5 diesel fuel supply, cooling lines, etc.
3. GENERAL:
3.1. ALL CHANGES to this statement of work must be approved by the Contracting Officer.
3.2. Unless otherwise noted in writing by the Contracting Officer, the Contracting Officer is the only person with the authority to change, modify, deny or approve any part and has the sole authority for all aspects of contract, SOW’s, contract changes, approvals, payments and project changes.
3.3. The Contractor shall provide all management, tools, equipment, transportation, materials, supervision and labor as may be required to accomplish the work as follows:
3.3.1. Replace Power Plant Generator #3 with the same make and model.
3.4. The Contractor shall perform all work in accordance with this Statement of Work (SOW). The
Contractor shall coordinate all work with the Contracting Officer.
3.5. Contractor will follow all NEC codes and OSHA regulations.
4. STATEMENT OF WORK:
BUILDING 1190; POWER PLANT GENERATOR #3 REPLACEMENT
PERFORMANCE REQUIREMENTS
4.1. Contractor shall provide all equipment, materials, labor, supervision, and transportation for the execution of sending/delivering the new power plant generator to Wake Island.
4.2. Work shall include removal of existing generator and installation of new generator defined below:
4.2.1. Model # DQFAA-A054M837
4.2.2. Generator Serial # C16093791 6
4.2.3. Spec F
4.2.4. Engine Serial # 37267790
4.2.5. EPA Family GCEXL030.AAD 3.2.1.6. Date of Mfg. 03/16
4.2.6. Model QST30-G5 NR2 3.2.1.8. Ref A034D634
WIA Generator Replacement 17 May 2019
4.3. Contractor will ensure generator is fully commissioned and tested by licensed Cummins personnel.
4.4. Contractor will utilize existing hookups such as exhaust locations, controls, electrical/bonding feeders, fuel supplies, cooling lines, etc.
4.5. Quote will have a detailed breakdown of labor hours, equipment and materials used, as well as supplier quotes with a detailed parts list including all spares and total freight.
4.6. TRANSPORTATION: Contractor is responsible for all cargo to/from Wake Island including all fees. Government rotator can be accessible upon availability for shipping generator to/from JBPHH to WI. Cargo requests on USAF-scheduled flights departing JBPHH must be processed through JBPHH Traffic Management Office (TMO) at least five weeks prior to targeted arrival date. Contact TMO for cargo flights schedules for departure from JBPHH to WI. Contractor to coordinate with government for shipment of generator from JBPHH to Wake Island.
5. SUBMITTALS
5.1. Schedule timeline within 30 days of award for all major project milestones that include at a minimum: material orders, shipments, construction start, project completion, etc.
5.2. Integrated Master Schedule (IMS) on AF Form 3064 within 30 days of award.
5.3. Demonstrating timeline for all major milestones including, but not limited to material orders, shipments, construction start, project completion, etc.
5.4. Submit any changes to the approved Integrated Master Schedule on a new AF Form 3064 with the next Weekly Progress Report for approval by the 611 CES/CEOES construction manager.
5.4.1. Weekly Progress Reports (WPR) utilizing AF Form 3065 throughout duration of the performance period will include at a minimum:
5.4.1.1. Percentage of work completed that week and overall:
5.4.1.2. Any delays experienced that week.
5.4.1.3. Upcoming problems and causes for concern.
5.4.1.4. Photos of all work completed that week and any concerns noted in the WPR.
5.5. Photos must be taken in such a way that work being accomplished may be determined suitable.
Photos must include a scale of some sort to aid in determining distance, length and sizes when possible. The correct date must appear on all photos taken.
5.6. Draft DD Form 1354, Transfer and Acceptance of Military Real Property, will be supplied within 10 days of Notice to Proceed (NTP)
5.7. Final DD Form 1354 Transfer and Acceptance of Military Real Property, will be supplied prior to final inspection walk through for review, and completed on the same day as the Beneficial Occupancy Date (BOD).
5.8. Manufacturer’s assembly drawings for planning and construction of the project and Safety Data Sheets for all permanently installed materials prior to procurement.
5.9. All required project close-out documentation within 10 days of construction completion, including:
5.9.1. As-Built drawings demonstrating any changes to the affected facility or system
5.9.2. All project submittals shall be accompanied by a completed AF Form 3000, Material
Approval Submittal.
5.10. Notify 611 CES/CEOES and ASUS PM three weeks prior to project site visits, construction start and work completion. Project cannot receive inspector approval in Wide Area Workflow from 611 CES/CEOES prior to final inspection or receipt of as-built drawings.
6. ATTACHMENTS
6.1. Building 1190 (Island Power Plant) generator #3 and facility
6.2. Nameplate information for Power Plant Generator #3.
6.3. Generator #3 base and setting
6.4. Power plant showing exhaust and cooling systems of all four generators.