This is a Statement of Work (SOW) for the purchase and delivery of a triple tube roller screed to Yokota Air Base, Japan, issued by the 819th RED HORSE Squadron on November 17, 2026, as an attachment to Pre-solicitation Notice Ref. No. FA520927QSCREED.

The contractor must furnish and deliver one new 22-foot triple tube roller screed/paver that is complete, fully assembled, operational, free of defects, and ready for Government use upon acceptance. The equipment must be new and of current production; used, refurbished, rebuilt, remanufactured, demonstration, or previously titled equipment is not acceptable. The specified model is an Allen TRTP275 or equal. Minimum requirements include three 10-inch diameter roller tubes, a self-propelled configuration with a liquid-cooled diesel engine of at least 74 horsepower, a hydraulically controlled gang vibration system capable of consolidating concrete to at least 24 inches below grade with a minimum vibration frequency of 11,000 vibrations per minute, hydraulic steering, a minimum 60-gallon hydraulic oil reservoir, and hydraulic spray/fogging and tube-cleaning systems. The contractor must provide all transportation, packaging, preservation, required documentation, and coordination with Government Points of Contact. Documentation deliverables include OEM operator's manual, maintenance and service manual, parts manual, product specification sheet, pre-delivery inspection checklist, warranty documentation, preventative maintenance schedule, authorized service points of contact, and written certification of salient characteristics compliance. Equipment must be delivered no later than March 1, 2027, coordinated with Government representatives at least ten business days prior, during normal duty hours (09:00 AM to 04:00 PM Japan Standard Time). Delivery location is Material Control/374th CES/CEOEM, Building 935, Carswell Street #9, Yokota Air Base, Fussa-City, Tokyo, Japan, Zip Code 197-0001. The Government will furnish offloading support and personnel. The contractor is liable for any damage to Government property resulting from negligence, unsafe practices, improper transportation, or failure to comply with delivery and installation requirements, including repair, replacement, re-delivery, and associated labor at no additional cost. The contractor must provide the OEM's standard commercial warranty and comply with all Yokota Air Base access control, security, traffic, and safety procedures, with no additional compensation authorized for delays from military exercises or emergency operations unless written approval is provided by the Contracting Officer.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment to Pre-solicitation Notice Ref. No. FA520927QSCREED

STATEMENT OF WORK (SOW)

FOR

TRIPLE TUBE ROLLER SCREED

PURCHASE AND DELIVERY

TO

YOKOTA AIR BASE JAPAN

(Subject to Change)

819th RED HORSE Squadron

Date: 17 Nov 2026

Table of Contents

1. DESCRIPTION OF WORK

2. SCHEDULE

3. LIABILITY

4. GOVERNMENT-FURNISHED SERVICES

5. GENERAL INFORMATION

6. SECURITY

7. MILITARY EXERCISES

8. DELIVERY LOCATION

9. REFERENCE STANDARDS

1. DESCRIPTION OF WORK

The Contractor shall furnish and deliver for one (1) new 22-foot triple tube roller screed/paver to

Yokota Air Base, Japan. The Government shall furnish offloading support. The equipment shall be complete, fully assembled, operational, free of defects, and ready for Government use upon acceptance. The delivered equipment shall be new and of current production. Used, refurbished, rebuilt, remanufactured, demonstration, or previously titled equipment is not acceptable. The

Contractor shall provide all items necessary for delivery of the equipment, including transportation, packaging, preservation, required documentation, and coordination with the

Government Points of Contact (POC*).

* Colton Schwab/Operations Management Journeyman/Phone: 011-81-42-225-8844/Email:

colton.schwab@us.af.mil

* Angel Kenney/General Supply Specialist/Phone: 011-81-42-225-8844/Email:

angel.kenney@us.af.mil

1.1 Salient Characteristics

The Contractor shall provide an Allen TRTP275 22-foot triple tube roller screed/paver or equal. Brand-name information is provided for reference only. Proposed equal products must meet or exceed all listed salient characteristics.

Characteristic Minimum Requirement

Equipment type Self-propelled triple roller tube concrete paver/screed

Quantity One (1) unit

Paving/screed width 22 feet

Roller tubes Three roller tubes

Roller tube diameter 10 inches minimum

Frame Heavy-duty sectionalized truss system or equivalent

Engine Liquid-cooled diesel engine

Engine power 74 horsepower minimum

Vibration system Hydraulically controlled gang vibration system mailto:colton.schwab@us.af.mil mailto:angel.kenney@us.af.mil

Vibrator configuration

Pendulum shaft-driven spud vibrators with variable speed, or equivalent

Vibration depth Capable of consolidating concrete to at least 24 inches below grade

Vibrator frequency 11,000 vibrations per minute minimum

Steering Hydraulic steering leg(s)

Hydraulic reservoir Minimum 60-gallon hydraulic oil reservoir

Spray system Hydraulic spray/fogging system to reduce concrete adhesion to screeding tubes

Tube cleaning Drive tube scrapers or equivalent system to reduce concrete buildup

Operator station Operator console integral to or located within the main equipment frame for safe operational visibility

Transport configuration

Vibration rack or equivalent system capable of retracting or securing for transport

1.2 Equipment Condition and Included Components

The Contractor shall provide equipment that is:

1. New, complete, and free from damage and manufacturing defects.

2. Fully assembled and configured in the required 22-foot configuration

3. Furnished with all standard OEM components, safety devices, controls, guards, hoses, fittings, and accessories required for safe operation.

4. Furnished with all operating fluids at appropriate levels, unless prohibited by transportation or installation requirements.

5. Free from fuel, oil, hydraulic-fluid, coolant, or other leaks.

6. Furnished with all required warning decals, data plates, serial number identification, and operating controls in English.

7. Furnished without additional accessories beyond the standard equipment and components required to meet this Statement of Work.

1.3. Manuals and Documentation

The Contractor shall provide on electronic copy and one hard-copy set, in English, of the following items at delivery:

1. OEM operator’s manual.

2. OEM maintenance and service manual.

3. OEM parts manual, including parts listings and diagrams where available.

4. OEM product specification sheet for the delivered equipment.

5. Pre-delivery inspection checklist.

6. Warranty documentation and instructions for obtaining warranty service.

7. Recommended preventative maintenance schedule.

8. List of authorized service and warranty-support points of contact.

9. Written certification that the delivered equipment meets or exceeds the salient characteristics in Paragraph 1.1.

2. SCHEDULE

The Contractor shall deliver the equipment no later than 1 March 2027 to the specified delivery address. The Contractor shall coordinate the delivery date and time with the

Government Point of Contact at least ten (10) business days before delivery. Delivery coordination shall include the anticipated delivery date, estimated arrival time, delivery vehicle information, and the name and contact information of the delivery driver or delivery representative. Delivery shall occur during normal duty hours (09:00 AM through 04:00 PM Japan Standard Time) unless otherwise approved by the Contracting

Officer or designated Government representative.

3. LIABILITY

The Contractor shall be liable for damage to Government property, facilities, pavements, utilities, vehicles, equipment, or other assets resulting from Contractor negligence, unsafe practices, improper transportation, or failure to comply with applicable delivery and installation requirements. The Contractor shall be responsible for correcting all deficiencies identified before Government acceptance. Correction of deficiencies includes repair, replacement, transportation, re-delivery, and associated labor at no additional cost to the

Government.

4. GOVERNMENT-FURNISHED SERVICES/EQUIPMENT

The Government shall:

1. Provide access to the designated delivery location, subject to applicable Yokota Air

Base access and security procedures.

2. Furnish equipment and personnel necessary to offload the roller screed/paver from the Contractor’s delivery vehicle.

The Contractor remains responsible for coordinating safe offloading operations with the

Government representative and for ensuring the delivery vehicle is compatible with the

Government-furnished offloading method.

5. GENERAL INFORMATION

5.1 Contractor Point of Contact (POC)

The Contractor shall provide a primary POC for contractual, delivery, warranty, and equipment-support matters. The Contractor POC shall have the authority to coordinate delivery, address deficiencies, and facilitate warranty support.

5.2 Safety

The Contractor shall comply with all applicable federal, local, installation, and facility safety requirements while performing under this contract. Contractor personnel shall use appropriate personal protective equipment and comply with Government instructions concerning vehicle movement, delivery operations, parking, restricted areas, and offloading activities.

5.3 Warranty

The Contractor shall provide the OEM’s standard commercial warranty for the delivered equipment. Warranty coverage shall include, as applicable, the engine, hydraulic system, frame, roller tubes, vibration system, steering system, and installed components. The

Contractor shall provide complete warranty terms, duration, limitations, warranty-claim procedures, and service contact information at the time of delivery.

6. SECURITY

6.1 Installation Access

The Contractor shall comply with all Yokota Air Base access-control, identification, vehicle-registration, inspection, escort, and security procedures applicable at the time of performance. The Contractor shall submit all required information for Contractor personnel and delivery vehicles within the timeframe established by the Government. Installation access approval is subject to Government security requirements.

6.2 Traffic and Vehicle Requirements

Contractor personnel shall comply with all installation traffic laws, posted speed limits, vehicle-inspection requirements, parking restrictions, and directions issued by security forces or authorized Government personnel.

6.3 Protection of Government Property

The Contractor shall take reasonable precautions to prevent damage to Government property during delivery and offloading. The Contractor shall immediately report any damage, incident, or unsafe condition to the Government POC.

7. MILITARY EXERCISES

The Contractor shall comply with installation procedures associated with military exercises, emergency operations, force-protection conditions, or restricted-access events. No additional compensation will be authorized for delays resulting from installation-access restrictions, military exercises, emergency operations, or related security procedures, unless authorized in writing by the Contracting Officer.

8. DELIVERY LOCATION

The Contractor shall coordinate with the Government POC and deliver the equipment to the following location:

Material Control/374th CES/CEOEM

Carswell St #9

Bldg: 935, Yokota Air Base

Fussa-City, Tokyo, Japan

Zip-Code: 197-0001

The Government will furnish offloading support at the designated delivery location. The

Contractor shall coordinate with the Government POC to ensure the delivery vehicle, load configuration, and delivery timing are compatible with the Government’s offloading capabilities.

9. REFERENCE STANDARDS

The Contractor shall comply with the following, as applicable:

1. OEM operating, maintenance, safety, and warranty requirements for the delivered equipment.

2. Applicable transportation, delivery, and hazardous-material requirements.

3. Applicable diesel-engine emissions requirements.

4. Applicable Yokota Air Base access, security, traffic, and safety procedures.

1. DESCRIPTION OF WORK
1.1 Salient Characteristics
1.2 Equipment Condition and Included Components
The Contractor shall provide equipment that is:
1. New, complete, and free from damage and manufacturing defects.
2. Fully assembled and configured in the required 22-foot configuration
3. Furnished with all standard OEM components, safety devices, controls, guards, hoses, fittings, and accessories required for safe operation.
4. Furnished with all operating fluids at appropriate levels, unless prohibited by transportation or installation requirements.
5. Free from fuel, oil, hydraulic-fluid, coolant, or other leaks.
6. Furnished with all required warning decals, data plates, serial number identification, and operating controls in English.
7. Furnished without additional accessories beyond the standard equipment and components required to meet this Statement of Work.
1.3. Manuals and Documentation
The Contractor shall provide on electronic copy and one hard-copy set, in English, of the following items at delivery:
1. OEM operator’s manual.
2. OEM maintenance and service manual.
3. OEM parts manual, including parts listings and diagrams where available.
4. OEM product specification sheet for the delivered equipment.
5. Pre-delivery inspection checklist.
6. Warranty documentation and instructions for obtaining warranty service.
7. Recommended preventative maintenance schedule.
8. List of authorized service and warranty-support points of contact.
9. Written certification that the delivered equipment meets or exceeds the salient characteristics in Paragraph 1.1.
2. SCHEDULE
3. LIABILITY
The Contractor shall be liable for damage to Government property, facilities, pavements, utilities, vehicles, equipment, or other assets resulting from Contractor negligence, unsafe practices, improper transportation, or failure to comply with applica...
4. GOVERNMENT-FURNISHED SERVICES/EQUIPMENT
The Government shall:
1. Provide access to the designated delivery location, subject to applicable Yokota Air Base access and security procedures.
2. Furnish equipment and personnel necessary to offload the roller screed/paver from the Contractor’s delivery vehicle.
The Contractor remains responsible for coordinating safe offloading operations with the Government representative and for ensuring the delivery vehicle is compatible with the Government-furnished offloading method.
5. GENERAL INFORMATION
5.1 Contractor Point of Contact (POC)
The Contractor shall provide a primary POC for contractual, delivery, warranty, and equipment-support matters. The Contractor POC shall have the authority to coordinate delivery, address deficiencies, and facilitate warranty support.
5.2 Safety
The Contractor shall comply with all applicable federal, local, installation, and facility safety requirements while performing under this contract. Contractor personnel shall use appropriate personal protective equipment and comply with Government in...
5.3 Warranty
The Contractor shall provide the OEM’s standard commercial warranty for the delivered equipment. Warranty coverage shall include, as applicable, the engine, hydraulic system, frame, roller tubes, vibration system, steering system, and installed compon...
6. SECURITY
6.1 Installation Access
The Contractor shall comply with all Yokota Air Base access-control, identification, vehicle-registration, inspection, escort, and security procedures applicable at the time of performance. The Contractor shall submit all required information for Cont...
6.2 Traffic and Vehicle Requirements
Contractor personnel shall comply with all installation traffic laws, posted speed limits, vehicle-inspection requirements, parking restrictions, and directions issued by security forces or authorized Government personnel.
6.3 Protection of Government Property
The Contractor shall take reasonable precautions to prevent damage to Government property during delivery and offloading. The Contractor shall immediately report any damage, incident, or unsafe condition to the Government POC.
7. MILITARY EXERCISES
The Contractor shall comply with installation procedures associated with military exercises, emergency operations, force-protection conditions, or restricted-access events. No additional compensation will be authorized for delays resulting from instal...
8. DELIVERY LOCATION
The Contractor shall coordinate with the Government POC and deliver the equipment to the following location:
Material Control/374th CES/CEOEM
Carswell St #9
Bldg: 935, Yokota Air Base
Fussa-City, Tokyo, Japan
Zip-Code: 197-0001
The Government will furnish offloading support at the designated delivery location. The Contractor shall coordinate with the Government POC to ensure the delivery vehicle, load configuration, and delivery timing are compatible with the Government’s of...
9. REFERENCE STANDARDS
The Contractor shall comply with the following, as applicable:
1. OEM operating, maintenance, safety, and warranty requirements for the delivered equipment.
2. Applicable transportation, delivery, and hazardous-material requirements.
3. Applicable diesel-engine emissions requirements.
4. Applicable Yokota Air Base access, security, traffic, and safety procedures.