Airfield Forms_SOW_PreSolicitation Notice.pdf
PDF 269 KB Posted
- Solicitation number
- FA520927QFORMS
About this file
This is a Statement of Work (SOW) for the purchase and delivery of airfield concrete paving forms to Yokota Air Base, Japan, issued by the 819th RED HORSE Squadron on November 17, 2026.
The Contractor shall furnish and deliver ninety (90) new steel airfield concrete paving forms meeting specific salient characteristics: 16-inch height, 1/4-inch gauge steel thickness, 10-foot individual form length, straight configuration suitable for airfield concrete paving, heavy-duty construction, stable base/support configuration, end connections for secure assembly, integrated stake pockets or anchoring provisions, and manufacturer standard finish. All forms must be new and of current production; used, refurbished, repaired, or previously installed forms are unacceptable. The Contractor must provide complete, defect-free equipment with all standard OEM components, proper packaging, and preservation. Documentation deliverables include electronic and hard-copy manufacturer product specification sheets, assembly/handling/installation/operation/maintenance instructions, packing lists, pre-delivery inspection documentation, warranty documentation, authorized service contact information, and written certification that delivered forms meet salient characteristics. Delivery must occur no later than March 1, 2027, to Material Control/374th CES/CEOEM at Building 935, Yokota Air Base, Fussa-City, Tokyo, Japan (Zip Code 197-0001), with coordination required at least ten business days prior to delivery. Delivery shall occur during normal duty hours (09:00 AM to 04:00 PM Japan Standard Time) unless otherwise approved. The Government shall provide offloading support and base access subject to Yokota Air Base security procedures. The Contractor bears liability for damage resulting from negligence, unsafe practices, or improper transportation and must correct all deficiencies at no additional cost, including repair, replacement, re-delivery, and associated labor. The Contractor shall provide a primary point of contact authorized to coordinate delivery, address deficiencies, and facilitate warranty support, comply with all federal, local, and installation safety requirements, and provide OEM standard commercial warranty covering engine, hydraulic system, frame, roller tubes, vibration system, steering system, and installed components.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment to Pre-solicitation Notice Ref. No. FA520927QFORMS
STATEMENT OF WORK
FOR
AIRFIELD CONCRETE FORMS
PURCHASE AND DELIVERY
TO
YOKOTA AIR BASE JAPAN
(Subject to Change)
819th RED HORSE Squadron
Date: 17 Nov 2026
Table of Contents
1. DESCRIPTION OF WORK
2. SCHEDULE
3. LIABILITY
4. GOVERNMENT-FURNISHED SERVICES
5. GENERAL INFORMATION
6. SECURITY
7. MILITARY EXERCISES
8. DELIVERY LOCATION
9. REFERENCE STANDARDS
1. DESCRIPTION OF WORK
The Contractor shall furnish and deliver ninety (90) new steel airfield concrete paving forms to Yokota Air Base, Japan. The Government shall furnish offloading support. The paving forms shall be complete, free from defects, and ready for Government use upon acceptance.
All forms shall be new and of current production. Used, refurbished, repaired, or previously installed forms are not acceptable. The Contractor shall provide all items necessary for delivery, including transportation, packaging, preservation, required documentation, and coordination with the Government Points of Contact (POC*).
* Colton Schwab/Operations Management Journeyman/Phone: 011-81-42-225-8844/Email:
colton.schwab@us.af.mil
* Angel Kenney/General Supply Specialist/Phone: 011-81-42-225-8844/Email:
angel.kenney@us.af.mil
1.1 Salient Characteristics
The Contractor shall provide steel airfield concrete paving forms meeting or exceeding the following salient characteristics.
Characteristic Minimum Requirement
Product type Steel airfield concrete paving forms
Quantity Ninety (90) individual forms
Form height 16 inch
Form material Steel
Steek thickness 1/4 inch gauge steel
Form configuration Straight paving form suitable for airfield concrete paving operations
Individual form length 10 feet
Duty rating
Heavy-duty construction suitable for strict paving specifications and support of heavy-duty paving equipment
Base/support configuration
Stable base or support configuration suitable for maintaining grade and alignment during concrete placement and paving operations mailto:colton.schwab@us.af.mil mailto:angel.kenney@us.af.mil
Connections
End connections sufficient to securely connect adjacent forms and maintain continuous line and grade
Stake pockets/anchoring
Integrated stake pockets, anchoring provisions, or equivalent means to securely position the forms during paving operations
Accessories/components
All standard components required for normal assembly, interconnection, and use of the forms shall be included
Finish
Manufacturer standard finish suitable for outdoor construction and normal concrete paving operations
1.2 Equipment Condition and Included Components
The Contractor shall provide equipment that is:
1. New, complete, and free from damage and manufacturing defects.
2. Manufactured from 1/4 inch thick steel or greater.
3. Uniform in height and profile to support consistent concrete paving operations.
4. Free from bends, twists, dents, cracked welds, excessive corrosion, damaged end connections, or other conditions that could prevent proper alignment, secure connection, or safe use.
5. Furnished with all standard OEM components necessary for normal assembly and interconnection of the delivered forms.
6. Properly packaged and protected to prevent damage during transportation and delivery.
1.3. Manuals and Documentation
The Contractor shall provide on electronic copy and one hard-copy set, in English, of the following items at delivery:
1. Manufacturer product specification sheet for the delivered paving forms.
2. Manufacturer assembly, handling, installation, operation, and maintenance instructions, if available.
3. Packing list identifying the quantity and description of all delivered forms and standard components.
4. Pre-delivery inspection documentation.
5. Warranty documentation and instructions for obtaining warranty service, if applicable.
6. List of authorized service and warranty-support POC, if applicable
7. Written certification that the delivered forms meet or exceed the salient characteristics in Paragraph 1.1.
2. SCHEDULE
The Contractor shall deliver the equipment no later than 1 March 2027 to the specified delivery address. The Contractor shall coordinate the delivery date and time with the Government POC at least ten (10) business days before delivery.
Delivery coordination shall include the anticipated deliver date, estimated arrival time, delivery vehicle information, and the name and contact information of the delivery driver or delivery representative. Delivery shall occur during normal duty hours (09:00 AM through 04:00 PM Japan Standard Time) unless otherwise approved by the Contracting Officer or designated Government representative.
3. LIABILITY
The Contractor shall be liable for damage to Government property, facilities, pavements, utilities, vehicles, equipment, or other assets resulting from Contractor negligence, unsafe practices, improper transportation, or failure to comply with applicable delivery and installation requirements. The Contractor shall be responsible for correcting all deficiencies identified before Government acceptance. Correction of deficiencies includes repair, replacement, transportation, re-delivery, and associated labor at no additional cost to the Government.
4. GOVERNMENT-FURNISHED SERVICES/EQUIPMENT
The Government shall:
1. Provide access to the designated delivery location, subject to applicable Yokota
Air Base access and security procedures.
2. Furnish equipment and personnel necessary to offload the roller screed/paver from the Contractor’s delivery vehicle.
The Contractor remains responsible for coordinating safe offloading operations with the Government representative and for ensuring the delivery vehicle is compatible with the Government-furnished offloading method.
5. GENERAL INFORMATION
5.1 Contractor Point of Contact (POC)
The Contractor shall provide a primary POC for contractual, delivery, warranty, and equipment-support matters. The Contractor POC shall have the authority to coordinate delivery, address deficiencies, and facilitate warranty support.
5.2 Safety
The Contractor shall comply with all applicable federal, local, installation, and facility safety requirements while performing under this contract. Contractor personnel shall use appropriate personal protective equipment and comply with Government instructions concerning vehicle movement, delivery operations, parking, restricted areas, and offloading activities.
5.3 Warranty
The Contractor shall provide the OEM’s standard commercial warranty for the delivered equipment. Warranty coverage shall include, as applicable, the engine, hydraulic system, frame, roller tubes, vibration system, steering system, and installed components. The Contractor shall provide complete warranty terms, duration, limitations, warranty-claim procedures, and service contact information at the time of delivery.
6. SECURITY
6.1 Installation Access
The Contractor shall comply with all Yokota Air Base access-control, identification, vehicle-registration, inspection, escort, and security procedures applicable at the time of performance. The Contractor shall submit all required information for Contractor personnel and delivery vehicles within the timeframe established by the Government.
Installation access approval is subject to Government security requirements.
6.2 Traffic and Vehicle Requirements
Contractor personnel shall comply with all installation traffic laws, posted speed limits, vehicle-inspection requirements, parking restrictions, and directions issued by security forces or authorized Government personnel.
6.3 Protection of Government Property
The Contractor shall take reasonable precautions to prevent damage to Government property during delivery and offloading. The Contractor shall immediately report any damage, incident, or unsafe condition to the Government POC.
7. MILITARY EXERCISES
The Contractor shall comply with installation procedures associated with military exercises, emergency operations, force-protection conditions, or restricted-access events. No additional compensation will be authorized for delays resulting from installation-access restrictions, military exercises, emergency operations, or related security procedures, unless authorized in writing by the Contracting Officer.
8. DELIVERY LOCATION
The Contractor shall coordinate with the Government POC and deliver the equipment to the following location:
Material Control/374th CES/CEOEM
Carswell St, #9
Bldg: 935, Yokota Air Base
Fussa-City, Tokyo, Japan
Zip-Code: 197-0001
The Government will furnish offloading support at the designated delivery location.
The Contractor shall coordinate with the Government POC to ensure the delivery vehicle, load configuration, and delivery timing are compatible with the Government’s offloading capabilities.
9. REFERENCE STANDARDS
The Contractor shall comply with the following, as applicable:
1. Manufacturer requirements for transportation, handling, assembly, use, and maintenance of delivered paving forms.
2. Applicable transportation, delivery, and hazardous-material requirements.
3. Applicable Yokota Air Base access, security, traffic, and safety procedures.
4. Manufacturer-provided specifications for the proposed airfield concrete paving forms.
5. Applicable contract terms and conditions.
| 1. DESCRIPTION OF WORK |
| 1.1 Salient Characteristics |
| 1.2 Equipment Condition and Included Components |
| The Contractor shall provide equipment that is: |
| 1. New, complete, and free from damage and manufacturing defects. |
| 2. Manufactured from 1/4 inch thick steel or greater. |
| 3. Uniform in height and profile to support consistent concrete paving operations. |
| 4. Free from bends, twists, dents, cracked welds, excessive corrosion, damaged end connections, or other conditions that could prevent proper alignment, secure connection, or safe use. |
| 5. Furnished with all standard OEM components necessary for normal assembly and interconnection of the delivered forms. |
| 6. Properly packaged and protected to prevent damage during transportation and delivery. |
| 1.3. Manuals and Documentation |
| The Contractor shall provide on electronic copy and one hard-copy set, in English, of the following items at delivery: |
| 1. Manufacturer product specification sheet for the delivered paving forms. |
| 2. Manufacturer assembly, handling, installation, operation, and maintenance instructions, if available. |
| 3. Packing list identifying the quantity and description of all delivered forms and standard components. |
| 4. Pre-delivery inspection documentation. |
| 5. Warranty documentation and instructions for obtaining warranty service, if applicable. |
| 6. List of authorized service and warranty-support POC, if applicable |
| 7. Written certification that the delivered forms meet or exceed the salient characteristics in Paragraph 1.1. |
| 2. SCHEDULE |
| 3. LIABILITY |
| The Contractor shall be liable for damage to Government property, facilities, pavements, utilities, vehicles, equipment, or other assets resulting from Contractor negligence, unsafe practices, improper transportation, or failure to comply with applica... |
| 4. GOVERNMENT-FURNISHED SERVICES/EQUIPMENT |
| The Government shall: |
| 1. Provide access to the designated delivery location, subject to applicable Yokota Air Base access and security procedures. |
| 2. Furnish equipment and personnel necessary to offload the roller screed/paver from the Contractor’s delivery vehicle. |
| The Contractor remains responsible for coordinating safe offloading operations with the Government representative and for ensuring the delivery vehicle is compatible with the Government-furnished offloading method. |
| 5. GENERAL INFORMATION |
| 5.1 Contractor Point of Contact (POC) |
| The Contractor shall provide a primary POC for contractual, delivery, warranty, and equipment-support matters. The Contractor POC shall have the authority to coordinate delivery, address deficiencies, and facilitate warranty support. |
| 5.2 Safety |
| The Contractor shall comply with all applicable federal, local, installation, and facility safety requirements while performing under this contract. Contractor personnel shall use appropriate personal protective equipment and comply with Government in... |
| 5.3 Warranty |
| The Contractor shall provide the OEM’s standard commercial warranty for the delivered equipment. Warranty coverage shall include, as applicable, the engine, hydraulic system, frame, roller tubes, vibration system, steering system, and installed compon... |
| 6. SECURITY |
| 6.1 Installation Access |
| The Contractor shall comply with all Yokota Air Base access-control, identification, vehicle-registration, inspection, escort, and security procedures applicable at the time of performance. The Contractor shall submit all required information for Cont... |
| 6.2 Traffic and Vehicle Requirements |
| Contractor personnel shall comply with all installation traffic laws, posted speed limits, vehicle-inspection requirements, parking restrictions, and directions issued by security forces or authorized Government personnel. |
| 6.3 Protection of Government Property |
| The Contractor shall take reasonable precautions to prevent damage to Government property during delivery and offloading. The Contractor shall immediately report any damage, incident, or unsafe condition to the Government POC. |
| 7. MILITARY EXERCISES |
| The Contractor shall comply with installation procedures associated with military exercises, emergency operations, force-protection conditions, or restricted-access events. No additional compensation will be authorized for delays resulting from instal... |
| 8. DELIVERY LOCATION |
| The Contractor shall coordinate with the Government POC and deliver the equipment to the following location: |
| Material Control/374th CES/CEOEM |
| Carswell St, #9 |
| Bldg: 935, Yokota Air Base |
| Fussa-City, Tokyo, Japan |
| Zip-Code: 197-0001 |
| The Government will furnish offloading support at the designated delivery location. The Contractor shall coordinate with the Government POC to ensure the delivery vehicle, load configuration, and delivery timing are compatible with the Government’s of... |
| 9. REFERENCE STANDARDS |
| The Contractor shall comply with the following, as applicable: |
| 1. Manufacturer requirements for transportation, handling, assembly, use, and maintenance of delivered paving forms. |
| 2. Applicable transportation, delivery, and hazardous-material requirements. |
| 3. Applicable Yokota Air Base access, security, traffic, and safety procedures. |
| 4. Manufacturer-provided specifications for the proposed airfield concrete paving forms. |
| 5. Applicable contract terms and conditions. |
File details come from the government source that posted it. Updated .