This is a Questions and Answers document for solicitation FA520926Q0065, addressing contractor clarifications regarding the scope of work for purchasing and installing one stationary air compressor at Yokota Air Base. The document clarifies four key points of responsibility between the contractor and the Government.
The Government will be responsible for removal and disposal of existing equipment, upgrade of electrical infrastructure (including circuit breaker and wiring replacements necessary to support the larger compressor), and installation of the new ventilation system in Building 530 to ensure proper airflow rates of 4,500 m³/h. The contractor is required to procure and install the stationary air compressor and include a Carbon Monoxide monitor in the new installation, as confirmed in the Q&A response. A site visit was scheduled for August 6, 2026 at 0930 hours. The solicitation is issued by the Department of the Air Force Pacific Air Forces, and notice is provided that funds are not presently available; the Government reserves the right to cancel the solicitation before or after the closing date without obligation to reimburse offerors for any costs incurred.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment - FA520926Q00650001.pdf | ||
| Atc_1_SC - Stationary AC.pdf | ||
| Solicitation - FA520926Q0065.pdf | ||
| Procedures for Business w U.S. Government.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 FA520926Q0065 Purchase and Install Stationary AC
| Question | Answer | |
| 1 | Removal and Disposal of Existing Equipment: The specifications do not explicitly mention the removal and disposal of the existing equipment. Could you please clarify if the contractor is required to perform the removal and disposal, or if this will be handled by the Government? | The disposal of existing equipment will be handled by the government. |
| 2 | Electrical Infrastructure Upgrade (Breaker and Wiring): Since the new compressor is larger than the existing one, the power supply infrastructure will need to be upgraded (specifically, a 60A motor breaker or a 125A molded-case circuit breaker, along with 22mm² wiring is recommended). Could you please confirm whether the Government will handle the replacement/upgrade of the circuit breaker and wiring? | The government will be handling the upgrade of the electrical infrastructure. |
| 3 | Ventilation System Upgrade in Bldg. 530: Due to the limited space inside the existing room in Bldg. 530, replacing the ventilation system is necessary to ensure proper operation (a ventilation airflow rate of 4,500 m³/h is recommended). Could you please clarify whether the replacement of the ventilation equipment will be performed by the Government or included in the contractor's scope of work? | The government will be handling the installation of the new ventilation system. |
| 4 | CO Monitor Requirement: The existing compressor system includes a Carbon Monoxide (CO) monitor to check the CO concentration in the discharged air. However, a CO monitor is not specified in the current solicitation scope. Could you please confirm whether a CO monitor is required for this new installation? | Yes, a CO monitor is required for the new installation. |