1_MARKET SURVEY QUESTIONNAIRE-final.pdf
PDF 682 KB Posted
- Attached to
- Natural Gas (City Gas) at NAF Atsugi
- Solicitation number
- FA520924GASATSUGI
About this file
This document is a Market Survey Questionnaire related to a federal contract opportunity for natural gas (city gas) supply at Naval Air Facility Atsugi in Japan.
The key details are:
- The requirement is for a contractor to provide 24/7 natural gas (city gas) supply to the Main Boiler Plant at NAF Atsugi for a 5-year contract period from September 1, 2025 to August 31, 2030.
- The projected maximum hourly flow is 1,700 m3/h and the projected average annual consumption is 6,700,000 m3/yr. The gas supply pressure at the plant must be 0.3 - 1.0 MPa and the gas type is City Gas 13A with a heat content of 40.6 MJ/Nm3 (LHV).
- The questionnaire asks the respondent to indicate if they can meet various contractual terms and conditions related to load factors, gas resource cost adjustments, excess flow charges, minimum orders, and payment terms.
- The government is also considering expanding the requirement to include Yokosuka Naval Base, with a total average usage of 58,800,000 m3/year. Respondents are asked if they can accommodate this expanded scope.
- Respondents are asked about their price structure, offer validity period, and compliance with Section 804 of the NDAA regarding Russian-affiliated companies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2_Technical Description Atsugi-Draft.pdf | ||
| 3_Atch 1 Est consumption Atsugi.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARKET SURVEY QUESTIONNAIRE
For Natural Gas Supply at Atsugi
厚木航空基地における都市ガス供給に関する市場調査
This Market Survey is to define the Japanese commercial practice whether it meets U.S. Government Natural Gas requirements. This information will not be used with other contractors or organizations, outside of the U.S.
Government. We greatly appreciate your input.
本市場調査は、在日米軍基地向け都市ガスの供給入札にあたり、日本における商習慣が米軍の要求内容
にどこまで沿うものなのかを見るものです。頂きましたご回答は、米国政府以外他の業者及び団体には
公表・使用されることは一切ございませんので、何卒ご協力の程宜しくお願い申し上げます。
Requirement: Natural Gas (City Gas) Supply. The Contractor shall provide city gas twenty four (24) hours a day, seven (7) days a week to the Main Boiler Plant, Building 1600, at NAF Atsugi via a gas pipe line indicated on Attachment 2, Supply and Gas Line Connection Point. The Contractor shall coordinate with General Gas Pipeline Service Provider (Tokyo Gas Network) and conduct periodic and emergency inspections on Government-owned gas line from the supply point listed above to the connection point in accordance with Japanese Gas Business Act (Act No. 51 of March 31, 1954) and all other relevant laws. The distance from the existing gas supply gas point at the property boundary to the Main Boiler Plant connection point is approximately 1,007 meters.
Scheduled Contract Period: 5 years Scheduled Award: 1 Sep 2025 – 31 Aug 2030 Projected Hourly Maximum Flow: 1,700m3/h Projected Average Annual Consumption: 6,700,000 m3/yr Supply Pressure at the plant: Middle Pressure 0.3 – 1.0 MPa Type of gas/ Quality of gas/heat content: City Gas 13A, 40.6 MJ/Nm3 (LHV)
要求概要:都市ガスの供給。契約業者は、別紙 2 に示したガス管を経由し、厚木航空基地建物番号 1600 に設置のボイラーに継続的な都市ガスの供給をする。契約業者は、日本のガス事業法に沿って、一般ガ
ス導管事業者(東京ガスネットワーク)と調整し、上記供給地点から接続地点までの、米軍所有のガス
管の定期的及び緊急点検、保守を行う。敷地境界の既存ガス供給地点からメインガスボイラープラント
接続地点までの距離は、約 1,007 メートル。
予定契約期間: 5 年間 契約予定:2025 年 9 月 1 日より 2030 年 8 月 31 日 予定最大時間流量:1,700m3/h 年間平均予定使用量:6,700,000m3/yr 供給圧力:中圧 0.3 – 1.0 MPa 種類及び熱量:都市ガス 13A, 40.6 MJ/Nm3 (LHV)
Area of Performance: Naval Air Facility Atsugi (NAF Atsugi) 供給地点:厚木航空基地 (厚木基地)
Other Conditions:
Approx. distance from a nearest Tokyo Gas’s gas line to NAF Atsugi connection point is 900m
その他状況: 東京ガス所有のガス管から厚木基地への接続地点までの距離は約 900m。
Questions 質問 YES NO Q1. In above requirement, the following standards and numbers are based on the conditions of a local Gas Retailer or General Gas Pipeline Service Provider (Tokyo Gas Network Co., Ltd) such as general gas supply conditions, optional supply condition and/or general provision for wheeling services. Are you able to offer with the following conditions?
上記の要求内容では、下記の項目の基準や数値を当該地域のガス小売事業者もしくは一般ガス導管事業者
(厚木基地においては東京ガスネットワーク)の「一般ガス供給約款」、「選択約款」及び「託送約款」
等を基に作成をしているが、下記のそれぞれの項目において入札条件とすることは可能か?
a. [Yearly Load Factor] Standard Yearly Load Factor:75%
[年間負荷率] 年間負荷率の基準: 75% 可能である 可能でない
If no, what is your standard?
可能でない場合は貴社の基準を教えてください。
b. [Gas Resource Cost Adjustment] Calculation formula and association of each cost (Average Gas Resource Cost, Gas Resource Base, Gas Resource Adjustment Unit Price, etc..) Reference URL: https://www.tokyo-gas.co.jp/news/press/20240328-05_01.pdf [原料費調整] 原料費調整額の算出方法、及び各価格(平均原料価格、
基準平均原料価格、調整単位料金等)参考URL:https://www.tokyo-gas.co.jp/news/press/20240328-05_01.pdf
可能である 可能でない
If no, what is your standard? (It is possible if the U.S. Government (USG) assigns Gas Resource Base, etc.)
可能でない場合は貴社の基準を教えてください。(米軍で指定の基準原料価格なら可能等)
c. Excess of Hourly Max Flow Volume Charge: Do you charge a fee for exceeding the contracted Hourly Max Flow Volume?
[最大流量超過補償料] 契約最大流量超過料は課しているか
行っている 行っていない
If yes, what is your standard/conditions?
行っている場合、貴社の基準・条件を教えてください。
Q2. Minimum Order: Do you charge a settlement amount for not ordering the yearly minimum order amount?
引取量: 年間引取量未達精算額を課しているか?
行っている 行っていない
If yes, what is the minimum order amount as a percentage of the yearly contracted usage?
行っている場合、年間引取量は契約年間使用量の何パーセントか教えてください。
Q3. Is there a compensation fee if the contract year usage is exceeded? 契約年数使用
量を超えた場合、補償料はあるのか?
行っている 行っていない
行っている場合、貴社の基準・条件を教えてください。
Q4. Are there any clearing/compensation fees other than Q1c, Q2 and Q3?
Q1c、Q2、Q3 以外の清算・補償料はあるのか?
ある ない
ある場合、貴社の基準・条件を教えてください。
Q5. Payment Terms: Payment discount terms for USG are “Contractor will be paid within 30 day after USG receives a proper invoice. In case of the late payment, the payment will be made with the interest rate established by the U.S. Department of the Treasure.” Are these conditions acceptable?
支払条件:米軍では支払い条件は、「米軍が正当な請求書を受け取ってから、30 日で支払を行う。その
日を超えた後の支払いはアメリカ財務省の設定した延滞利息に基づき、延滞利息が請求額に上乗せをされ
て支払われる。」この支払い条件は受け入れ可能か? If no, what are your payment conditions (payment due date, date rate interest is accrued, interest rate, etc..)?
可能でない場合は貴社支払い条件(支払期日、延滞利息発生日、利率
等)
Q6. Contract Period: USG is planning to procure a five-year contract with fixed unit prices. Gas price shall be calculated as follows: Gas Price = Usage x (Unit Price ± Gas Resource Cost Adjustment Price) Price changes are possible at the time of revision of Wheeling Charge Provision. Are these conditions acceptable?
契約期間:米軍は今回の入札では 5 年 の契約期間の固定単価での入札
を予定しています。ガス料金は、次の通りの計算になります。ガス料
金=使用量 x(単価±ガス原料費調整価格) 託送約款改定時の料金変更
は可能。このような契約形態、期間の入札参加は可能か?
条件付で可能
である(Yes with conditions)
If yes with conditions, what are the conditions?
条件付きで可能の場合、その条件は?
Q7.a. Is it possible to supply natural gas to two locations, Yokosuka Naval Base and NAF Atsugi, starting with the 2029 contract? The total average usage is 58,800,000m3/year.
(Yokosuka: 52,100,000m3 /year, Atsugi: 6,700,000m3/year) There will be one contract for USG, but we are considering separate unit price, etc.
2029 年の契約から横須賀基地海軍基地と厚木基地の 2 箇所に対して、天然ガ
スを供給することは可能ですか。合計平均使用量は、58,800,0003/年 (横須賀:52,100,000m3/年、厚木:6,700,000m3/年) 米軍の契約が一つになりますが、契約単価等は別に考えています。
Comments コメント
Q7.b. If the above is possible, USG is considering the following evaluation method. Is it possible to accept the following?
- Award to the gas retailer with the lowest total proposed price for the two supply locations
Or
- If Company A and Company B have lower prices for their respective supply locations, they will be awarded separate contracts.
上記が可能であるならば、下記の落札方法を考えています。下記対応可能で
すか。 2 つの供給箇所の応札価格合計が低いガス小売事業者へ落札
もしくは A社とB社が供給箇所それぞれ低い価格となった場合、別契約にする
Q7.c. If the above is possible, is it possible to supply the contract schedule for NAF Atsugi this time from 1 Sep 2025 to 30 Apr 2029 (3 years and 8 months)?
上記が可能であるならば、今回の厚木基地の契約予定を 2025 年 9 月 1 日より
2029 年 4 月 30 日(3 年 8 か月)の供給することか可能か。
Q7.d. If the above is possible, is it possible to supply the contract schedule for NAF Atsugi this time like follows? USG has a unilateral right to exercise an option.
Basic Period: from 1 Sep 2025 to 30 Apr 2029 (3 years and 8 months) Option Period: from 1 May 2029 to 31 Aug 2030 (1 year and 4 months) 上記が可能であるならば、今回の厚木基地の契約期間を以下の予定で供給す
ることか可能か。米軍はオプションを行使する一方的な権利を有します。 ベーシック期間:2025 年 9 月 1 日より 2029 年 4 月 30 日(3 年 8 か月) オプション期間:2029 年 5 月 1 日より 2030 年 8 月 31 日(1 年 4 か月)
Q8. Is the price structure a basic charge and a unit price, or only a unit price? Can it be both? 料金体系は、基本料金と単価料金、もしくは、単価料金のみか。両方
とも可能か。
基本料金と料
金単価
(Basic Charge + Unit Price)
両方可能 (Both)
単価料金のみ
(Unit Price Only)
Q9. Valid Period of Offer Price: Do you have a valid period of offer price?
入札価格の有効期間はありますか?
ある ない
If yes, what is the valid period from the date of offer? ある場合、応札日からの有効期間を教えてください。
Q10. Section 804 of the NDAA prohibits contracting officers from entering into a contract with companies that have ties to Russian government authorities or fossil fuel companies operating in Russia and are not less than 50 percent owned by them. Does your company purchase a gas from Russian Company which is more than 50 percent owned by them?
国防権限法第 804 条により、ロシア政府当局やロシアで事業展開する化石燃
料企業とつながりがあり、その所有率が 50%を下回らない企業との契約を禁
じられている。貴社は、ロシア企業が 50%以上出資する会社からガスを購入
していますか。
はい いいえ
Q11. What is an adequate mobilization period to start suppling gas upon notice of award? What kind of procedure do you need to take?
落札決定からガス供給ができるまでの必要な手続き及びその期間を教えてください。
Q12. Are you interested in providing an offer for this requirement (see page 1)?
今回の要求内容(1 ページに記載)での、入札参加にご興味はありますか?
ある
ない
Remarks.
その他ご意見等がございましたら、ご記入下さい。
Company Name (会社名): ______________________________________________________________________________
POC Name (担当者): ______________________________________/_________________________________
Telephone Number (電話番号):_________________________________/_______________________________
E-mail (E メーアドレス): ________________________________________________________________________________
Date (日時): _________________________________
Thank you very much for taking time to fill out this questionnaire.
貴重なお時間を割いて頂き誠にありがとうございました。
市場調査送信先: 在日米軍横田基地 第 374 契約中隊 高島宛 メール:yuri.takashima.jp@us.af.mil
FAX: 042-551-0973
TEL: 042-553-8549