SPECIFICATION -Ironer and Folder.pdf

PDF 293 KB Posted

Attached to
Purchase of Flatwork and Ironer Federal contract opportunity
Solicitation number
FA520923Q0049
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document outlines specifications for the purchase of a flatwork ironer and folder by the Department of the Air Force Pacific Air Forces. The solicitation seeks a chest-type roll ironer no smaller than 4800mm width by 3700mm depth by 2200mm height, capable of processing 45 meters of laundry per minute at steam pressures up to 1MPa. A compatible folder is also required measuring no larger than 4590mm by 3420mm by 1225mm, using steam below 0.97MPa. Both machines must have safety features including emergency stops and synchronized shutdown. Delivery within 120 days and installation with training and technical support at Sagami General Depot in Kanagawa, Japan are specified. The commercial warranty and disposal of removed equipment are addressed.

View the file

Other files for this federal contract opportunity

Other files attached to Purchase of Flatwork and Ironer, newest first.
File Type Posted
Solicitation - FA520923Q0049.pdf PDF
Business w US Government.pdf PDF
Gate Pass Form FBO.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. FA520923Q0049 Attachment 1

SPECIFICATIONS

FOR

IRONER, FOLDER

1. ITEM #1: Flat Work Ironer, Chest Roll Type

a. Description of item.

機械幅: (Width) 4800 (Max) mm 機械奥行(Depth) 3700 (Max) mm 機械高さ: (Height) 2200 (Max) mm 機械重量: (Weight) 12000 (Max) kg 加熱シリンダー (Roller Qty) 2 Rolls 使用最大蒸気圧力 (Government’s Max. Steam Pressure usage) 0.7 ~ 1.0 Mpa

蒸気消費量: (Steam Consumption) 0.7Mpa 100L/500kg/h

空気消費量: (Air Consumption) 0.6MPa 100L/min

電源 (Electrical Power Requirement) AC 200V, 17.6KW, 3 PH

配管 Existing plumbing

圧縮エアー入り口 (Size, Air Connection Inlet) 20A

蒸気入り口(Size, Steam Pipe Inlet) 50A 蒸気ドレン口 (Size, Steam Pipe Return) 50A

b. Requirements.

1) Feeding Rate (Roll Speed): High - 45m/min (adjustable 10m/min – 45m/min)

2) The machine must have a safety device. Auto-Lock Function (自動停止機能) .Both of the machines (Item#1 ~ 2) should stop working synchronously when any one of the machines stops working whether by accidental or emergency circumstances.

3) The operational instruction on touch panels can be switched between Japanese and English.

4) The contractor must be Japanese vendor/manufacturer, to obtain repair parts and customer service within 3 business days after the notified by the Government’s Representative.

5) The ironer and folder must have high compatibility.

6) The machine must have pushbutton for start and stop.

7) The machine must have pushbutton for discharging the load.

8) The machine must have an emergency stop switch each in the front, back, left and right.

9) The machine must have maintenance modes (e.g. guide tape replacement, roll waxing, etc.)

10) The machine must be of a construction that allows the operator to visually check soiled or torn items.

11) The ironer adjustments and operational modes must be selectable with touch panel.

12) The number of sheets processed must be viewable on the touch panel.

13) Rotation speed, press pressure, and exhaust power must be adjustable for each roll

14) Publication: Operator’s manual (Japanese): 1EA

15) The machine must be a chest-type roll capable of processing “Fitted Sheets”.

16) The width and diameter of the roll must be equal or greater than an existing model, Century ironer. (*width: 3,500mm (Minimum), *diameter: 1,300mm (Minimum)).

c. Existing Machine.

Manufacturer: CHICAGO, Model: CENTIIIST42, (W): 4750mm, (D): 5100mm, (H): 2100mm

2. ITEM #2: Folder

a. Description of item

機械幅: (Width) 4590 (Max) mm

機械奥行: (Depth) 3420 (Max) mm 機械高さ: (Height) 1225 (Max) mm

空気消費量: (Air Consumption) 0.5Mpa 210L/min

空気圧力: (Air Pressure) 0.6~0.7 Mpa

使用最大蒸気圧力: (Government’s Max.

Steam Pressure usage) 0.97 Mpa

電源: (Electrical Power Requirement) 3Phase 200V 3.1KW

b. Requirement

1) The machine must have a safety device. Auto-Lock Function (自動停止機能) .Both of the machines (Item#1 ~ 2) should stop working synchronously when any one of the machines stops working whether by accidental or emergency circumstances.

2) The operational instruction on touch panels can be switched between Japanese and English.

3) The contractor must be Japanese vendor/manufacturer, to obtain repair parts and customer service within 3 business days.

4) The folder and ironer must have high compatibility.

5) The machine must have pushbutton for start and stop.

6) The machine must have pushbutton for discharging the load.

7) The machine must have an emergency stop switch each in the front, back, left and right.

8) The machine must have maintenance modes (e.g. guide tape replacement, roll waxing, etc.)

9) The machine must be capable of both front and back folding.

10) The machine must be of a construction that allows the operator to visually check soiled or torn items.

11) The folding adjustments and operational modes must be selectable with touch panel.

12) The number of sheets processed must be viewable on the touch panel.

13) Press and folding section must be from the same manufacturer.

14) Publication: Operator’s manual (Japanese): 1EA

c. Existing Machine.

Manufacturer: G.A BRAUN INC., Model: 1PF36F/A, (W):4150mm, (D):3360mm, (H):1850mm

3. Delivery Date And Address.

120 days after receipt of order for both ironer and folder machines. The contractor shall deliver to the following address;

Bldg 154-4, Sagami General Depot, 600 Kamiyabe Chuo-ku, Sagamihara city, Kanagawa, Japan The Laundry Plant, Supply and Services Division, Logistics Readiness Center-Honshu, 403d Army Filed Support Brigade.

4. Installation.

The contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials, and any other items or services necessary to install ironer and folder machine unit and connect not limited to piping work, exhaust duct connection, power connection and mechanical assembly.

5. Removal.

The contractor shall provide all necessary personnel, supervision, management tools, equipment, transportation, materials, and any other items or services necessary to disconnect the existing machines from all piping and power connections. After the machine is disconnected, the contractor shall remove the existing machine and move to outside of the laundry plant. Refer to APPENDIX for the removal location.

6. Test run and adjustment.

The contractor shall perform a test run and adjustment to ensure both of machines functioning properly.

7. Technical support.

The contractor shall provide on-site maintenance and repair support.

8. Disposal of materials.

All debris and unserviceable materials generated under this contract such as industrial waste, non-recyclable materials and equipment/material not listed on hand-receipts shall be disposed of off-base by the contractor IAW the laws of Japan.

9. Responsibility for damages.

Any damages caused to U.S. Government property during performing this contract shall be restored, replaced and/or repaired to its original condition at no additional cost to the U.S. Government.

10. Cleanliness.

The contractor is responsible for cleanliness of the service areas. This includes, but is not limited to, washing, sweeping, dusting and other janitorial services necessary to maintain the area in a clean and sanitary condition. The contractor shall furnish such supplies as required.

11. Warranty.

The contractor shall provide the Government with their commercial warranty for both of ironer and folder machines. The Government shall receive the same warranty service as the contractor’s most favored customers. If the services fail to be performed or otherwise fail due to workmanship or materials, the contractor shall correct the affected area(s) at no additional cost to the U.S. Government. The Government reserves the right to reject any unserviceable or substandard item and to require replacement with a serviceable like item or acceptable quality item or to require full credit for the item.

12. Training.

The contractor shall provide training sessions at the site to show usage of the installed both of ironer and folder machines.

APPENDIX Required Area Map