Amend_PWS_FY19YABRB_19Q00060001.pdf

PDF 1 MB Posted

Attached to
FY19 Sidetrack Roadbed Maintenance at U. S. Government Sidetrack No. 328 Yokota Air Base
Solicitation number
FA520919Q0006
Issued by

About this file

Amend PWS FY19YABRB FA520919Q00060001

View the file

Other files

File Type Posted
Minutes_19Q0006_20181115.pdf PDF
FA520919Q00060001.pdf PDF
3_SF1449_FA520919Q0006.pdf PDF
4_PWS_FY19YABRB_19Q0006.pdf PDF
2_NTO_19Q0006.pdf PDF
1_PolicyLtr_19Q0006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 to Solicitation No. FA520919P0006-0001

PERFORMANCE WORK STATEMENT (PWS)

FOR

FY19 SIDETRACK ROADBED MAINTENANCE

AT

U.S. GOVERNMENT SIDETRACK NO. 328

YOKOTA AIR BASE

14 Nov 2018

The attached PWS is being provided in accordance with (IAW) Section 801, 10 USC 2330. Any contract or task order resulting from this request is to be acquired using performance-based principles.

1. DESCRIPTION OF SERVICES/GENERAL INFORMATION. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and services necessary to perform maintenance and repairs to the sidetrack roadbed portion of U.S. Government Sidetrack No. 328, Yokota Air Base, in a manner that will ensure continuous and reliable railroad operational condition. The performance period shall be from the effective date in block 3 of Standard Form (SF) 1449 through 30 Sep 2019.

1.1. MAINTENANCE AND REPAIR SERVICES. The maintenance and repair services shall be in accordance with (IAW) the Japan Freight Railway Company’s (JFRC) rules and regulations as specified in the Agreement between the United States of America and JFRC for handling military sidetracks, dated 01 Apr 1987, paragraphs 2, 4, 6 and its first Supplementary Agreement dated 13 July 1987, paragraph 5 entitled “Maintenance”, and the second Supplementary Agreement dated 16 March 1988, subparagraphs 5.e and 5.f. All construction debris or waste generated from this contract shall be removed IAW all Japanese laws and regulations, Japan Environmental Governing Standards (JEGS), commercial practices, and local standards.

1.2. The Contractor shall perform maintenance and repairs to the sidetrack roadbed portion of U.S.

Government Sidetrack No. 328, Yokota Air Base, as identified in Appendices A through H to ensure reliable and continuous operation. The work shall include but is not limited to:

(a) Contract Line Item Number (CLIN) 0001: Repair of Trackage IAW Appendices.

(b) CLIN 0002: Repair of Switching Device IAW Appendices.

(c) CLIN 0003: Cleaning of Railroad Crossing IAW Appendices.

(d) CLIN 0004: Weeding IAW Appendices.

(e) CLIN 0005: Other Repairs IAW Appendices.

(f) CLIN 0006: Emergency Repair IAW Paragraph 1.3.

1.3. EMERGENCY REPAIR. In the event that action is required to correct a safety issue or protect lives and properties, the Contracting Officer (KO) or Contracting Officer’s Representative (COR) may verbally instruct the Contractor to proceed with emergency repairs by issuance of a supplemental agreement pursuant to FAR 52.212-4, Contract Terms and Conditions - Commercial Items in this contract. All repair work shall be IAW the JFRC’s rules and regulations.

1.4. JFRC’S INITIAL INSPECTION. After completion of the Contractor’s scheduled work cited in the contract, initial inspection shall be performed by JFRC prior to inspection by the Government IAW paragraph 5.c. and 5.d. of the Agreement between the United States of America and JFRC for Handling Military Sidetracks. Inspection of services will be accomplished by the designated COR based on the JFRC’s certification of inspection.

1.5. INTERFERENCE WITH GOVERNMENT OPERATIONS. The Contractor shall make every effort to schedule its maintenance activities so as not to interfere with U.S. Government operations. In the event such interference is necessary, the Contractor shall provide the COR with a minimum of five (5) working days advance notification of the proposed work.

1.6. WASTE DISPOSAL.

1.6.1. Every effort shall be made to use recycling and/or reuse (diversion) measures to reduce the amount of waste generated under the contract. Waste minimization and disposal plan shall be included in the Environmental Protection Plan (EPP). In addition, a copy of contract(s) for waste transportation and disposal, and permits issued from local governments shall be submitted with the AF Form 3000 to CE Environmental (374 CES/CEIE) separate from the EPP. The plan also needs to list waste that will be generated from the contract and how they are treated (recycled/incinerated/landfilled). After the disposal, waste manifests shall be submitted to 374 CES/CEIE along with recycling report that shows the amount of waste recycled/incinerated/landfilled.

1.6.2. Solid and Construction/Maintenance Waste: Solid waste shall be placed in containers which are emptied on a regular schedule. Likewise, debris will be placed in appropriate containers or vehicle equipment for proper handling and disposal. Handling and disposal shall be conducted to prevent contamination. Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste. The Contractor shall transport solid waste to include debris off government property and dispose of it in compliance with applicable federal and local requirements for solid or construction waste disposal. In addition, the Contractor shall comply with Japanese local laws and regulations pertaining to the use of landfill areas. At a minimum, the following items will be recycled:

scrap metal, cardboard, concrete, asphalt, scrap wood, wooden pallets, glass, and plastic. Green wastes such as leaves, trees, and branches should be mulched or composted. With the COR’s or KO’s approval, green waste may be transported and dropped off to the Civil Engineer yard near Building 4072 to be processed for mulching. Note: Green waste does not include wooden railroad ties.

1.6.3. Hazardous Waste (HW): All HW generated by the Contractor shall be disposed/recycled off base IAW Japanese regulation, Article 3 of “Law of Disposal and Cleansing of Waste (Haikibutsu no shori oyobi seisou ni kansuru horitsu)” and local regulations. Polychlorinated Biphenyl (PCB) containing items, fluorescent light bulbs, and any hazardous waste that meets criteria of JEGS Chapter 6 generating from existing U.S. properties must be turned in to 374 CES/CEIE for disposal or recycled. The Contractor shall not leave any hazardous waste at work site areas at the end of duty hours. If temporary hazardous waste storage is needed to accumulate hazardous waste on base, the Contractor shall submit spill response plan with site map, the list of all hazardous waste to be stored on-base and estimated quantities to 374 CES/CEIE, CE Fire Inspection (374 CES/CEF), Bioenvironmental (374 AMDS/SGPB), and Safety (374 AW/SE) for approval.

1.6.4. Burning: Open burning is prohibited for the purpose of reducing waste.

1.7. HAZARDOUS MATERIALS.

1.7.1. Approval is required before bringing any hazardous materials (HAZMAT) onto the installation.

The Contractor seeking approval to bring HAZMAT onto the installation must submit the AF Form 3000 along with Safety Data Sheet/Material Safety Data Sheet (SDS/MSDS) in English and Japanese. The Contractor is also required to provide the estimated amount of HAZMAT to be used during the project. If the HAZMAT is suspected to contain lead or asbestos, such as paint, primer, and caulking, a certificate from the manufacturer shall be provided to prove that the HAZMAT is free of asbestos/lead. The AF Form 3000 package will be reviewed by 374 AMDS/SGPB, 374 AW/SE, and 374 CES/CEIE. The Contractor shall use non-hazardous chemicals when available. All excess materials and empty containers are the responsibility of the Contractor and shall be removed at the end of the contract. When the occupants of the facility request the Contractor leave the excess HAZMAT, the Contractor shall coordinate with and be approved by 374 CES/CEIE.

1.7.2. Approval of Herbicide. A PACAF-approved listing of approved herbicide is located within Appendix G. If the Contractor wishes to utilize herbicide other than the approved herbicide, the Contractor shall coordinate with the COR first. All herbicides must be reviewed and approved by 374 CES/CEIE, 374 AMDS/SGPB, 374 AW/SE, and the Civil Engineer Entomology Shop (374

CES/CEOIE).

1.7.3. Application and Control of Herbicide. The application of herbicide shall be conducted IAW the manufacturer’s instructions. The Contractor shall possess the spill control materials on hand at all times to contain/absorb worst case spill, both by volume and hazard level. The Government will inspect each application. The Contractor shall not store or dispose any herbicide including its empty containers on the Government’s installation.

1.7.4. Monthly Reports. The Contractor shall submit a report to the KO within ten (10) working days following each month listing all pesticide and herbicide applications. Include pesticide/herbicide name, use concentration, amount applied, date, and detailed location of use. A DD Form 1532 will be provided on request to facilitate record keeping.

1.7.5. For the pesticide/herbicide management, the personnel certified as a Pesticide Management Instructor (Nouyaku Kanri Shidoushi 農薬管理指導士) or equivalent shall be on site to supervise the workers. The Contractor is subject to inspection by DOD certified applicators/inspectors as well as State Department of Agriculture Pesticides Division or equivalent agency.

1.7.6. Hazardous Materials Inventory. The Contractor shall maintain an up-to-date hazardous material inventory with copies of SDS(s)/MSDS(s) for all materials used on the job site. The Contractor shall maintain a complete copy of all approved SDS(s)/MSDS(s).

1.7.7. Hazardous Materials Management. The Contractor shall remove all hazardous materials by the end of each workday. The Contractor shall not conduct process treatments (e.g., paint thinner solvent recycling) on base.

1.7.8. Storage. All containers of HAZMAT in the work place should be labeled, tagged, or marked in both English and Japanese with the identity of the products. The Contractor shall ensure adequate handling and storage IAW JEGS where the HAZMAT is stored. Storage of oils, greases, chemicals, fuels, or other liquids will require spill prevention and security. The Contractor is not allowed to store HAZMAT on base for over 24 hours without authorization. If on-base HAZMAT storage areas are needed, the Contractor shall submit the list of all items that are to be stored on-base and estimated quantities to 374 CES/CEIE, 374 CES/CEF, and 374 AW/SE for approval. Hazardous materials storage areas may be inspected by 374 CES/CEIE, 374 CES/CEF, and 374 AW/SE. SDS(s)/MSDS(s) must be available at storage and on site at all times.

1.7.9. Final Report. The Contractor shall submit a final inventory, not later than ten (10) working days following termination/completion of this contract, of all hazardous materials used since the last hazardous usage report to the KO or COR. The final inventory will list all hazardous materials used, total amount of each used, and a description of the disposition of any remaining hazardous materials.

1.8. HUMANITARIAN ASSISTANCE AND DISASTER RELIEF (HADR). The scope of this contract includes services to respond to requirements in a contingency environment including humanitarian assistance and disaster relief.

1.9. GENERAL INFORMATION.

1.9.1. Quality Control. The Contractor shall develop and maintain a quality control program to ensure the sidetrack roadbed maintenance services are performed IAW the PWS, standards of the contract, and the JFRC’s regulations. Contractor’s QCI (Quality Control Inspector) shall be responsible for inspecting, identifying, and preventing defects in the quality of service performed.

1.9.2. Quality Assurance. The Government will evaluate all of the Contractor’s performance IAW the Quality Assurance Surveillance Plan (QASP) by appointing COR to monitor performance to ensure services are received.

1.9.3. Government Remedies. The KO will follow FAR 52.212-4, Contract Terms and Conditions - Commercial Items for the Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

1.9.4. Contractor Personnel.

1.9.4.1. Contract Manager (CM). The Contractor shall provide a CM who shall be responsible for the performance of the work. The name of this person, and an alternate or alternates who shall act for the Contractor when the manager is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract and shall be individuals who are capable of conversing in, and comprehending English.

1.9.4.2. Contract Employees. Contractor personnel shall be easily recognizable as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the Contractor’s company name and the employee’s name.

1.9.4.3. Removal of Contractor’s Employees. The Contractor shall utilize only experienced, responsible, and capable employees in the performance of this contract. The KO may require that the Contractor remove from the Government job any of his/her employees who endanger persons or properties, or whose continued employment under this contract is inconsistent with the interests of military security.

1.9.4.4. Other Country Nationals (OCN). The Security Forces on each base control entry to the base.

Under certain circumstances, the OCN might be denied entry. It is the Contractor’s responsibility to coordinate with the Security Forces at each base when there is a question about particular circumstances.

1.9.5. Subcontracting. The subcontractors shall meet the standards required by this contract to perform the service. The prime Contractor is responsible for the performance of the subcontractors.

1.9.6. Installation Base Passes. For access to U.S. Installations, the U.S. Government will issue all required Gate Passes/Vehicle Passes to contractor personnel at no cost to the Contractor. To obtain passes, the Contractor is required to submit documents IAW each installation instruction. The prime Contractor shall be responsible for all passes issued to his/her own or his/her subcontractor’s employees under this contract. The Contractor shall return all applicable passes upon termination of employment or completion of this contract to the Installation Pass Office.

1.9.6.1. Gate Passes. In order to obtain Gate Passes, the Contractor may be required to (i) submit certificates of residence, abstracts of family registers and an ID photo, in addition to application forms which could vary depending on each installation, and (ii) make appointments at the Installation Pass Offices to take ID photos and pick up issued passes. The Contractor is responsible for the expenses and costs that they would incur in order to obtain Gate Passes.

1.9.6.2. Vehicle Passes. In order to obtain Vehicle Passes, the Contractor shall submit the proof of valid liability insurance that must cover the automobile liability insurance in the types and minimum amounts of (i) Bodily Injury - ¥30,000,000 per person per occurrence, in addition to the Japanese Compulsory Insurance (JCI), and (ii) Property Damage - ¥3,000,000 per occurrence.

1.9.7. Hours of Operation.

1.9.7.1. Work Hours. Contractor work hours are from 0730 to 1630 Monday through Friday including Japanese holidays, but excluding U.S. legal holidays.

1.9.7.2. U.S. Legal Holidays. Recognized U.S. legal holidays are listed below. Holiday falling on a Saturday may be observed on the preceding Friday. Holidays falling on a Sunday may be observed on the following Monday.

DATE HOLIDAY

1st January New Year’s Day 3rd Monday in January Martin Luther King’s Birthday 3rd Monday in February President’s Day Last Monday in May Memorial Day 4th July Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day 11th November Veteran’s Day 4th Thursday in November Thanksgiving Day 25th December Christmas Day

1.9.8. Reports of Damages, Destruction, Injury, or Death.

1.9.8.1. The Contractor shall report all incidents of damage or destruction to property, or personal injury or death to any person, arising out of and during the performance of this contract. For the purposes of this clause, the term “property” includes equipment or property of any type, whether Government owned or not. The term “Contractor” includes the Contractor, its agents, servants, or employees.

1.9.8.2. The Contractor shall submit these reports to the KO through the COR as follows:

1.9.8.2.1. A preliminary report shall be made as soon as practicable after the time the incident occurs.

Report may be either verbal or facsimile.

1.9.8.2.2. A complete written report shall be submitted within 96 hours after occurrence of the incident.

A copy of this report shall be furnished to the COR.

2. SERVICES SUMMARY (SS).

The following SS identifies the performance objectives and performance thresholds for critical tasks associated with providing support services for this requirement. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

PWS

Para

Performance Threshold

Method of Assessment

SS# 1: Repair and Maintain Sidetrack Roadbed Portion

a. Repair of Trackage

b. Repair of Switching Device

c. Cleaning Work

d. Weeding

e. Other Repairs

Ensure reliable and continuous condition IAW the JFRC’s rules and regulations.

1.1. – 1.2. Zero (0) defect 100% Inspection

SS# 2: Emergency Repair Ensure reliable and continuous condition IAW the JFRC’s rules and regulations.

1.3. Zero (0) defect 100% Inspection

3. GOVERNMENT-FURNISHED PROPERTIES AND SERVICES.

3.1. Utilities. Water, electricity, and sewage, where available from existing work sites, will be provided to the Contractor without cost.

3.2. Security Forces and Emergency Contact Numbers. Upon request for assistance, the following units will provide services on a contractor refundable bases as necessary: the Base Security Forces, the Base Fire Department, and the Base Emergency Phone Number.

Base Security Forces Telephone 911 (042-507-6560) Base Fire Department Telephone 911 (042-507-6560) Base Emergency Telephone 911 (042-507-6560)

4. APPENDICES.

A. Estimated Workload B. Estimated Schedule of Inspection by JFRC C. List of Repair and Maitenance Work D. U.S. Military Sidetrack Drawings E. Replacement List of Ties F. Weeding Area G. Approved Herbicide H. Replacement Plan of Derailment Prevention Guard I. Work Pictures.

APPENDIX A: ESTIMATED WORKLOAD

Unit Quantities A. Repair of Trackage

a. Replacement of Steel Tie Each (EA) 28

b. Replacement of Regular Tie EA 37

c. Tamping of Ballast Meter (m) 40

d. Correction of Gauge m 120

e. Alignment of Track m 50

f. Replacement of Insulator Set 2

g. Increase of Brace EA 57

h. Establishment of Tie-plate Set 16

B. Repair of Switching Device

a. Replacement of Switching Device Tie (Day Shift) EA 9

b. Replacement of Switching Device Tie (Night Shift) EA 2

c. Lubrication of Switching Device Set 7

C. Cleaning Work

a. Cleaning of Flange Way (Night Shift) EA 3

b. Cleaning of Withered Leaves Set 5

D. Weeding

a. Chemical Weed Control Square Meters (m²) 34,496

b. Weeding m² 5,224.8 (870.8 m2 x 6 times)

c. Tree Trimming EA 1

E. Other Repairs

a. Repair of Railroad Crossing Board Set 1

APPENDIX B: ESTIMATED SCHEDULE OF INSPECTION BY JFRCE

数 量 単 位 2018 2019 記 事

Qty Unit Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Articl

1 軌 道 変 位 検 査(一般区間) TRACK IRREGULARITY 1 Job ★ ★ 1unit per job

2 軌 道 変 位 検 査(分岐器) TRACK IRREGULARITY 12 Set ★ 1set per job

SWITCH DEVICE

3 分 岐 器 一 般 ・ 機 能 検 査 FUNCTION INSPECTION OF 12 Set ★ 1set per job

SWITCH DEVICE

4 分 岐 器 細 密 検 査 DETAIL INSPECTION OF 0 Set

SWITCH DEVICE

5 レール 検 査 RAIL 1 Job ★ 1unit per job

6 道 床 検 査 BALLAST 1 Job ★ 1unit per job

7 ま く ら ぎ 検 査(一般区間) REGULAR TIE 1 Job ★ 1unit per job

8 ま く ら ぎ 検 査(分岐器) SWITCH DEVICE TIE 12 Set ★ 1set per job

9 そ の 他 材 料 検 査 OTHER MATERIALS 1 Job ★ 1unit per job

10 巡 回 検 査 SAFETY PATROLLING SERVICE 2 Job ★ ★ 1unit per job

11 し ゅ ん 功 検 査

CONPLETION 1 ★ ★

12 調 査 ( 次 年 度 査 定 ) INVESTIGATION 1 Job ★ 1unit per job

★=軌道会社(No.1~9) Track company(No.1~9) ★=東京メンテナンスステーション(No.10~12) Tokyo Maintenance station(No.10~12)

*在日米軍との契約上の関係、及び、JR貨物側、及び、軌道会社の作業上の都合により、予定を変更することもある。

*請負業者は検査終了毎に東京メンテナンスステーションに連絡し、近日中にデータを入力すること.(又は、OA送信でも可とする.)

Contractors must inform Tokyo Maintenance station about the results every inspection,and enter data in a few days.(or carry data)

*大工事終了時、及び、工事進行状況により、竣工検査を追加、削除したり、検査予定月を変更する場合もある。

Service

The inspection schedule will be subject to change,depending on the contructual relationships made by US military and Japan Freight Railway, or process of works of track company.

It may well be that the completion inspection perform or cancel,and due month reschedules, depending on the construction progress and on completion of large scale work.

施設関係 2019年度分 米軍横田・年間検査計画表

Safety Patrol Inspection Services - Roadbed Portion Siding No.328 YOKOTA AB

(2018/10/1~2019/9/30)

APPENDIX C: LIST OF REPAIR AND MAINTENANCE WORK

APPENDIX D: U.S. MILITARY SIDETRACK RAWINGS

APPENDIX E: REPLACEMENT LIST OF TIES

APPENDIX F: WEEDING AREA

13号RC

9番 No.9

ヨ16

ヨ9 8番 No.8 12号RC

ヨ15

ヨ8 7番 No.7

9号RC

ヨ11 ヨ5 ヨ6 6番 No.6 ヨ14 11号RC

ヨ7

5番 No.5 ヨ12

8号RC ヨ10 ヨ13

4番 No.4 10号RC

7号RC

拝島 方 終点方

Haijima 223.8㎡ ※処分を全て含む Terminal

C : Place Magnification a rough Weeding work quadrature table (Six times a year) ※All disposal is included

建物 No.4091

A building No.4091

9番線 No.9

防護フェンス

5,224.8

面積 (㎡)区分 Position Range Area (㎡)

除草作業求積表(年6回)

燃料基地内 除草作業(処分含む) 求積略図・求積表 Weeding on fuel base (Disposal is included) Quadrature sketch, Quadrature table

防護フェンス

Fence

C箇所 拡大略図

合計 (㎡) Total amount (㎡)

C

計 (㎡) Total (㎡)

位置

192.5

870.8

9番線(左側)

A 132.0

B

223.8 No.9 (Left side)

D

Fence

322.5

No.7 RC

No.8 RCYO23

YO24

YO22

YO11

No.9 RC

YO5 YO6

YO7

YO10

YO8

YO9

YO13

YO12

YO14

YO15

YO16

No.10 RC

No.11 RC

No.12 RC

No.13 RC

1K030m 1K380m

A B

C

D

1.3m

80m 50m

2 .0m

6 .7m

1.0m 0 .8m

150m

3 .5m

2.8m

3 .5m 13 .0m

10 .5m 6 .2m

9 .7m

12 .5m

33 .2m

APPENDIX G: APPROVED HERBICIDE

ARMED FORCES PEST MANAGEMENT BOARD (AFPMB) STANDARD PESTICIDES LIST AVAILABLE TO DOD COMPONENTS AND

AGENCIES

October 1, 2017 The red texts are updated from the previous list.

1. HERBICIDES/FUNGICIDES/ALGAECIDES

The following herbicides must be applied by a DoD certified pesticide applicator or under the direct supervision of a DoD Certified pesticide applicator.

NSN 6840- ITEM NAME (Alternative Trade Name) MOA

Code Unit Package AAC Price UOI DOD

Users + 01-360-4741 SDS Label

Fungicide, Methylisothiocyanate (MITC-FUME)

***RESTRICTED USE PESTICIDE***

NA 18 tubes J 46.99 CO A, N, F

01-457-6588 SDS Label

Fungicide, Azoxystrobin, 50% (Heritage) 11 (6) 1- lb. cont. H 6560.52 BX A, N, M

01-643-0704 SDS Label

Herbicide Aminocyclopyrachlor, 39.5% and Chlorsulfuron, 15.8% (Perspective)

O, B (12) 1.25 lb.

bt

J 974.16 BX A, N, M,

F

01-643-0697 SDS Label

Herbicide Aminocyclopyrachlor, 39.5% and Metsulfuron methyl, 12.6% (Streamline)

O, B (8) 3-lb. bt J 2191.86 BX A, N, M, F

01-643-0702 SDS Label

Herbicide Aminocyclopyrachlor, 22.8%; Metsulfuron methyl, 7.3% and Imazapyr 31.6% (Viewpoint)

O, B (8) 5-lb. bt J 2841.30 BX A, N, M, F

01-561-9603 SDS Label

Herbicide, Aminopyralid, 40.6% (Milestone ) O (2) 2.5-gal co J 2175.32 BX A, N, M, F

00-392-7593 SDS Label

Herbicide, Bromacil, 21.9% lithium salt of bromacil, liquid (Hyvar X-L)

C1 (4) 1-gal co H 496.79 BX A, F, M, N

01-408-9079 SDS Label

Herbicide, Bromacil, 80%, wettable powder (Hyvar- X) C1 (12) 4-lb bags H 2228.68 BX A, M, N

01-005-7523 SDS Label

Herbicide, Diquat, 35.3%, water soluble liquid (Reward) D 1-gal co H 477.25 GL F, N

00-815-2799 SDS Label

Herbicide, Diquat, 35.3%, water soluble liquid (Reward) D (2) 2.5-gal co H 1050.50 BX A, N, F

01-341-9346 SDS Label

Herbicide, Diuron, mínimum 80% diuron, granular C2 25-lb bag H 265.16 BG A, N, F, M

00-001-7710 SDS Label

Herbicide, Diuron-Bromacil mixture, 40% bromacil, 40% diuron, granular (Krovar I DF)

C2,C1 6-lb bag H 127.51 BG A, N, F, M

01-630-3501 SDS Label

Herbicide, Diuron-Bromacil mixture, 40% bromacil, 40% diuron, granular (Krovar I DF)

C2,C1 25 lb. bag Z 294.95 BG F

01-356-6001 SDS Label

Herbicide, Fluridone, 5%, pellets (Sonar SRP) F1 40-lb co J 646.37 CO A, N

01-356-8888 SDS Label

Herbicide, Fluridone 41.7% liquid (Sonar A.S.) F1 1 qt co H 1171.45 QT A, N

01-525-5869 SDS Label

Herbicide, Imazapic ammonium salt 23.6% liquid (Plateau) B (2) 1-gal co J 1427.63 BX A, N, M, F

01-108-9578 SDS Label

Herbicide, Isopropylamine salt of glyphosate, 41%, water soluble liquid (Roundup Pro/Ranger Pro/Razor Pro/Glyfos Pro)

G (2) 2.5-gal co H 187.12 BX A, N, F, M

01-388-0142 SDS Label

Herbicide, Isopropylamine salt of glyphosate, 41%, water soluble liquid (Roundup Pro/Ranger Pro/Razor Pro/Glyfos Pro)

G 30-gal drum H 1160.27 DR A, F, N

01-356-8893 SDS Label

Herbicide, Isopropylamine salt of glyphosate, 53.8%, water soluble liquid (Rodeo/Aquamaster)

G (2) 2.5-gal co H 432.31 BX A, F, M, N

01-377-7113 SDS Label

Herbicide, Isopropylamine salt of glyphosate, 2.0%, water soluble liquid (Roundup Ready-to-Use)

G 24-oz pump spray bottle

H 8.81 BT N, F

01-399-0673 SDS Label

Herbicide, Ammonium salt of glyphosate, 73.3% and 2.9% Diquat dibromide, water soluble liquid (Quik Pro)

G, D 5 pkg. H 22.67 BX A, F, M

01-545-4540 SDS Label

Herbicide, Ammonium salt of glyphosate, 73.3% and 2.9% Diquat dibromide, water soluble liquid (Quik Pro)

G, D 6.8 lb. co H 249.65 CO A, N, M, F

01-356-8902 SDS Label

Herbicide, Isopropylamine salt of Imazapyr, 26.7% (Arsenal Powerline)

B (2) 2.5-gal co H 2898.94 BX A, N, F, M

01-532-5403 SDS Label

Herbicide, Isopropylamine salt of Imazapyr, 28.7% (Habitat) B (2) 2.5-gal co H 2207.70 BX A, N, M

01-318-7417 SDS Label

Herbicide, Oryzalin, 40.4% (Surflan A.S.) K1 (2) 2.5-gal co H 389.68 BX A, N, F, M

00-145-0013 SDS Label

Herbicide, Prometon, 25% prometon, emulsifiable concéntrate (Pramitol 25E)

C1 (2) 2.5-gal co H 306.68 BX A, F, N

01-356-8891 SDS Label

Herbicide, Methyl Sulfometuron, 75% (Oust XP) B 48-oz co H 279.87 CO A, N, M

01-319-2890 SDS Label

Herbicide, Tebuthiuron (Spike 80 DF) C2 4-lb bag J 138.42 BG A, N, F

01-457-6576 SDS Label

Herbicide, Tebuthiuron-Diuron, 1% Tebuthiuron, 3% Diuron (Spraykil SK-13)

C2 40 lb.

container

H 227.52 CO A, N, M

01-552-1822 SDS Label

Herbicide, Triclopyr, 60.45% (Garlon 4 Ultra) O (2) 2.5-gal co H 683.42 BX A, N, M, F

00-577-4194 SDS Label

Herbicide, 2,4-Dichlorophenoxy-acetic acid (2,4-D), oil miscible/water emulsifiable liquid (low volatile ester form)

O (2) 2.5-gal co H 196.74 BX A, N, M

00-664-7060 SDS Label

Herbicide, 2,4-Dichlorophenoxy-acetic acid (2,4-D), water soluble liquid (amine salt form)

O (2) 2.5-gal co H 143.07 BX A, N, M

01-377-7110 SDS Label

Herbicide, 2,4-Dichlorophenoxy-acetic acid (2,4-D), 0.128%, 0.22% MCPP and 0.05% Dicamba water soluble liquid (Weed- B-Gon MAX)

O 24-oz pump spray bottle

H 11.57 BT F, N

APPENDIX H: REPLACEMENT PLAN OF DERAILMENT PREVENTION GUARD

横田基地専用線引込3番線脱線防止ガード設置箇所まくらぎ交換計画図 US Military Siding at Yokota Base ‐ Derailment Prevention Guard Replacement Plan

6番レール Rail No.6 6番レール Rail No.6

6番レール Rail No.6

拝島方 Replacement of steel tie Job

For Haijima F型タイプレート新設 組

並まくらぎ交換 本

Replacement of regular tie Job 鉄まくらぎ交換 本

7番レール Rail No.7 7番レール

Newly established tie‐plate (type F) Set

チョック増設 個

Increase brace Job

Rail No.7

7番レール Rail No.7 並まくらぎ交換 本

Replacement of regular tie Job

並

並

8番レール Rail No.8 8番レール Rail No.8

鉄まくらぎ交換 本

Replacement of steel tie Job F型タイプレート新設 組

Newly established tie‐plate (type F) Set

8番レール Rail No.8 並まくらぎ交換 本

Replacement of regular tie Job

チョック増設 個

Increase brace Job

鉄まくらぎ交換 本

Replacement of steel tie Job F型タイプレート新設 組

Newly established tie‐plate (type F) Set

チョック増設 個

Increase brace Job

1 83 4 72 5 6 109 11 1813 14 1712 15 16 2019 21 2823 24 2722 25 26 3029 31 3833 34 3732 35 36 39 40

1 83 4 72 5 6 109 11 1813 14 1712 15 16 2019 21 2823 24 2722 25 26 3029 31 3833 34 3732 35 36 39

1 83 4 72 5 6 109 11 1813 14 1712 15 16 2019 21 2823 24 2722 25 26 3029 31 3833 34 3732 35 36 39

Replacement of regular tie Newly established tie‐plate (type F)

Replacement of steel tie (Type A) Increase brace

Remove brace Replacement of steel tie (Type B) 57鉄B

組

Newly established tie‐plate (type F) Set チョックてっ去 Newly established tie‐plate (type F) Set並 鉄まくらぎ交換(線ばねB)

チョック増設

Increase brace Job Increase brace Job 個

チョック増設 個

2横田基地方 Replacement of steel tie Job 並

鉄まくらぎ交換(線ばねA) チョック増設 Replacement of steel tie Job For Yokota base

鉄まくらぎ交換 本

鉄まくらぎ交換 本

F型タイプレート新設 組

鉄A F型タイプレート新設

合計 Total

並 並 並 並 鉄A

並まくらぎ交換 本

並まくらぎ交換 本 10並

並まくらぎ交換 Replacement of regular tie Job ↓ F型タイプレート新設 Replacement of regular tie Job並

鉄B 並 並 並 並

11番レール Rail No.11

11番レール Rail No.11 凡 例 Explanatory notes

チョック増設 個

Increase brace Job

並 並 並 並 並 並 並 並 並 並

鉄まくらぎ交換 本

Replacement of steel tie Job F型タイプレート新設 組

Newly established tie‐plate (type F) Set

10番レール Rail No.10 並まくらぎ交換 本

Replacement of regular tie Job

並

10番レール Rail No.10 10番レール Rail No.10

チョック増設 個

Increase brace Job

並

鉄まくらぎ交換 本

Replacement of steel tie Job F型タイプレート新設 組

Newly established tie‐plate (type F) Set

9番レール Rail No.9 並まくらぎ交換 本

Replacement of regular tie Job

9番レール Rail No.9 9番レール Rail No.9 1 83 4 72 5 6 109 11 1813 14 1712 15 16 2019 21 2823 24 2722 25 26 3029 31 3833 34 3732 35 36 39

1 83 4 72 5 6 109 11 1813 14 1712 15 16 2019 21 2823 24 2722 25 26 3029 31 3833 34 3732 35 36 39 40 41

1 83 4 72 5 6 9

APPENDIX H: WORK PICTURES

樹木伐採(横田6号RC~レールゲート間)

樹木伐採(0k900m付近 左側) Cutting of trees (Near 0k900m Left side)

Cutting of trees (Yokota No.6 R.C. ~ Rail gate)

拝島方 (For HAIJIMA)

Railroad crossing board repair (Yokota No.3 R.C)

踏切敷板補修(横田3号RC)

920

2000

拝島方 (For Haijima)

横田基地方 (For Yokota base )