Overhaul of Engine in Gnerator at Kyogamisaki Communication Site
Solicitation number
FA5209-18-Q-0129
Issued by

About this file

Specification

View the file

Other files

File Type Posted
Appendix_A.pdf PDF
FA520918P0178.pdf PDF
Appendix_A.pdf PDF
Specifications.pdf PDF
18Q0129.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PO No: FA5209-18-P-0178

Attachment 1

REQUIREMENTS SPECIFCIATIONS

Overhaul Diesel Engine in Generator at

Kyogamisaki Communication Site, Japan

1. Description of Work. The contractor shall provide the required parts to overhaul maintenance of diesel engines in electric generators at Kyogamisaki Communication Site (KCS), Japan. The overhaul shall be performed in accordance with commercial standards and practices as well as the manufacturer’s specifications.

2. Existing Engine Specifications. The existing engine has the following specifications:

a. Maker : Caterpillar

b. Model : 3456

c. Fuel Type: Diesel

The contractor shall provide a complete rebuild of three (3) engines at their facility. To include everything listed in appendix A as replacement parts. The contractor shall coordinate all aspects of this project with the Government Representative (GR), 14th Missile Defense Battery.

3. Delivery Date. The contractor shall complete overhaul engine in generator within 30 calendar days after contract award.

4. Maintenance Reports. The report for maintenance shall be submitted to the GR(s) within 14 calendar days after the completion of work. Such reports shall be submitted in booklet-type form, which shall include as a minimum the following information:

(1) Engine number

(2) Date work started

(3) Name of people who performed

(4) Equipment item checklist

(5) Drawings/sketches for specified service areas

(6) Pictures/photographs such as deteriorated parts, replacement of new parts, etc

(7) Test and analyzed data results

(8) Date of work completion

(9) Cost break-down for each maintenance provided, per maintenance item (labor cost and material cost)

(10) Warranty period

(11) Signature of manufacturer’s representative

5. Certifications. The contractor shall submit to the GR a current copy of the following two (2) certificates of technicians and engineers.

a. Individual being trained exclusively for Hanging Techniques by Hoists/Cranes (玉掛技能

講習修了)

PO No: FA5209-18-P-0178

Attachment 1

b. Special Education for operating a crane; A crane with a lifting capacity of less than 5 tons

(つり上げ荷重 5t未満のクレーンの運転の業務特別教育 )