4_Atch_2_Blank_pricelist.pdf

PDF 13 KB Posted

Attached to
Blanket Purchase Agreement (BPA) for Asbestos Bulk Sample Analysis at Yokota Air Base and GSUs, Japan
Solicitation number
FA5209-17-T-0060
Issued by

About this file

Price List

View the file

Other files

File Type Posted
Clarification_Letter_17T0060.pdf PDF
3_Atch_1_PWS.pdf PDF
1_Govt_Policy_Ltr.pdf PDF
2_FA520917T0060.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation FA5209-17-T-0060 Attachment 2

Price List for Asbestos Bulk Sample Analysis, Yokota Air Base and GSUs

DATE: 31 May 17

Company Name:

Address:

POC Name:

Tel:

Fax:

e-mail:

ITEM

NO

DESCRIPTION UNIT UNIT PRICE

0001AA

Sample/Analyze, ACM Bulk Samples, PLM utilizing method EPA 600/R-93/116 with a laboratory detection limit of 1% will be measured by (EA) individual sample taken. Measurement using this sampling line item includes labor, tools, equipment, lab fees for ten-day laboratory turn-around time, to extract a bulk sample and forward the sample for analysis. Work for this sampling item is independent of total performance time.

EA

0001AB

Sample/Analyze, ACM Bulk Samples, TEM method with a laboratory detection limit of 1% will be measured by each (EA) individual sample taken. Measurement using this sampling line item includes labor, tools, equipment, lab fees for ten-day laboratory turn-around time, to extract a bulk sample and forward the sample for analysis.

Work for this sampling item is independent of total performance time.

EA

0001AC

Sample/Analyze, ACM Bulk Samples, PLM utilizing method EPA 600/R-93/116 with a laboratory detection limit of 1% will be measured by (EA) individual sample taken. Measurement using this sampling line item includes labor, tools, equipment, lab fees for two-day laboratory turn-around time, to extract a bulk sample and forward the sample for analysis. Work for this sampling item is independent of total performance time.

EA

0001AD

Sample/Analyze, ACM Bulk Samples, TEM utilizing with a laboratory detection limit of 1% will be measured by (EA) individual sample taken. Measurement using this sampling line item includes labor, tools, equipment, lab fees for two-day laboratory turn-around time, to extract a bulk sample and forward the sample for analysis.

Work for this sampling item is independent of total performance time.

EA

0001AE

Sample/Analyze, ACM Bulk Samples, PLM utilizing method EPA 600/R-93/116 and 1,000 Point Count Procedure with a laboratory detection limit of 0.1% will be measured by (EA) individual sample taken. Measurement using this sampling line item includes labor, tools, equipment, lab fees for 10-day laboratory turn-around time, to extract a bulk sample and forward the sample for analysis. Work for this sampling item is independent of total performance time.

EA

0001AF

Sample/Analyze, ACM Bulk Samples, PLM utilizing method EPA 600/R-93/116 and 1,000 Point Count Procedure with a laboratory detection limit of 0.1% will be measured by (EA) individual sample taken. Measurement using this sampling line item includes labor, tools, equipment, lab fees for two-day laboratory turn-around time, to extract a bulk sample and forward the sample for analysis. Work for this sampling item is independent of total performance time.

EA

0002AA

Patch Work: Under Ground Pipe Insulation, Asphalt Roofing Overlap Two Layer of Asphalt Jute and Two Coats of Coal Tar Primer will be measured by each (EA). The line item will include all required equipment, tools, supplies & personnel to repair the designated item or items.

This work will be classified as installation including new material installation, labor, surface preparation, adhesive, curing and cleaning. The contractor will be allowed 90 minutes for every damage patched.

0002AB

Patch Work: Exposed Pipe/Duct Insulation to Outside and Pit, Asphalt Roofing and Aluminum Jacket will be measured by each (EA). The line item will include all required equipment, tools, supplies & personnel to repair the designated item or items. This work will be classified as installation including new material installation, labor, surface preparation, adhesive, curing and cleaning. The contractor will be allowed 90 minutes for every damage patched.

EA

0002AC

Patch Work: Concealed Space Pipe Insulation, Plastic Paper and Cotton Tape with Putty Finish will be measured by each (EA). The line item will include all required equipment, tools, supplies & personnel to repair the designated item or items. This work will be classified as installation including new material installation, labor, surface preparation, adhesive, curing and cleaning. The contractor will be allowed 90 minutes for every damage patched.

EA

0002AD

Patch Work: Exposed Pipe/Duct Insulation to Inside and Mechanical Room, Plastic Paper and Cotton Tape with Putty Two Coats of Oil Paint will be measured by each (EA). The line item will include all required equipment, tools, supplies & personnel to repair the designated item or items. This work will be classified as installation including new material installation, labor, surface preparation, adhesive, curing and cleaning. The contractor will be allowed 90 minutes for every damage patched.

EA

0002AE

Patch Work: Vapor Barrier of Pipe/Duct Insulation, Aluminum Foil and Cloth will be measured by each (EA). The line item will include all required equipment, tools, supplies & personnel to repair the designated item or items.

This work will be classified as installation including new material installation, labor, surface preparation, adhesive, curing and cleaning. The contractor will be allowed 90 minutes for every

0002AF

Patch Work: Flexible Duct, Woven Mineral Fabric with Vapor Barrier, Air Tight will be measured by each (EA). The line item will include all required equipment, tools, supplies & personnel to repair the designated item or items.

This work will be classified as installation including new material installation, labor, surface preparation, adhesive, curing and cleaning. The contractor will be allowed 90 minutes for every

This will remain valid until such date as both parties agree to change in price.

Print Name

Approved by:

Contracting Officer

File details come from the government source that posted it. Updated .