RFQ_PWS_cooling_tower_23_Jan_17.pdf
PDF 101 KB Posted
- Solicitation number
- FA5209-17-T-0040
About this file
Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 17T0040-0002.pdf | ||
| Amend_0002_PWS_cooling_tower_6_Feb_17.pdf | ||
| Amend_001_PWS_cooling_tower_2_Feb_17.pdf | ||
| 17T00400001_Amend_0001.pdf | ||
| RFQ_Pricing_Exhibit.xlsx | XLSX spreadsheet | |
| 17T0040_SF1449_Cooling_Tower.pdf | ||
| Gate_Pass_Request_Form_CZ.xlsx | XLSX spreadsheet | |
| Notice_to_Offeror_DS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 RFQ# FA5209-17-T-0040
DEPARTMENT OF THE ARMY
UNITED STATES ARMY GARRISON JAPAN
DIRECTORATE OF PUBLIC WORKS
UNIT 45006 APO AP 96343-5006
PERFORMANCE WORK STATEMENT
FOR
INSPECTION, MAINTENANCE,
AND WATER QUALITY CONTROL SERVICES
OF
COOLING TOWERS AT CAMP ZAMA
(FEWR No. JF-60013-6J) 23 Jan 17
Table of Contents
SECTION 1 Description of Services / General Information Pages 2 - 11
SECTION 2 Services Summary Page 12
SECTION 3 Government Furnished Materials Page 12
SECTION 4 Appendices Page 13 - 16
APPENDIX A: Cooling Towers List APPENDIX B: Estimate of Annual Chemical Consumption APPENDIX C: Annual Replacement Parts List
SECTION 1
DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.0. DESCRIPTION OF SERVICES. The Contractor shall provide all necessary labor, personnel, supervision, management, tools, equipment, transportation, materials, and any other items or services necessary to perform inspection, maintenance, and water quality control services of cooling towers, Camp Zama (CZ). Required services for individual operating conditions in the cooling towers shall be performed in accordance with this Performance Work Statement (PWS), attached appendices, Ministry of Health, Labor and Welfare, Health Department Notification No. 0125001 on 25 January 2008 (建築物における維持管理マニュア
ルについて 平成 20 年 1 月 25 日健衛発第 0125001 号), and commonly accepted commercial practices.
1.1. INSPECTION AND MAINTENANCE SERVICE.
1.1.1. Preliminary Inspection and Starting Operation of Water Quality Control System.
1.1.1.1. Prior to beginning the services during the cooling season for the basic and each option year, the Government Representative (GR) will notify the Contractor the start date for services for each cooling tower.The Contractor shall conduct any needed preliminary inspections and water quality control service for all cooling towers listed in Appendix A. The following items are including but not limited for the preliminary inspections.
a. Water Quality
1) Water Quality of raw water (原水の水質)
2) Injection dose of chemical (薬品注入量)
3) Quantity of make-up water (補給水量)
b. Functional Inspection of Cooling Towers
1) Float valves
2) Chemical injection point in cooling towers
3) Suction valve for chemical feed pumps
4) Plumbing system of make-up water
1.1.1.2. Work Schedule. The Contractor shall submit a work schedule for all the required services in the cooling season to the GR and obtain approval at least ten (10) working days after a preliminary inspection. The work schedule shall include the location, work description, required material, and estimated date of work. Any changes to the approved schedule shall be in writing to the GR.
1.1.2. Inspection and Maintenance Services.
1.1.2.1. At a minimum, the Contractor shall conduct the following inspection and maintenance services on a monthly basis.
1.1.2.2. The Contractor shall perform operational checks of chemical injection devices and leakage verifications of chemical solutions. The Contractor shall notify the GR if any equipment that needs to be replaced upon completion.
1.1.2.3. The Contractor shall inspect the operating conditions of the automatic overflow device system. Maintenance shall include, but is not limited to the following:
a. Calibrate conductivity meter
b. Conduct operational work of solenoid valves
c. Clean electrode rods
1.1.2.4. The Contractor shall measure slime and scale control components of cooling water for all cooling towers.
1.1.2.5. Replacement Parts. The Contractor shall notify the GR which cooling towers require the replacement parts identified in Appendix C based on conditions of the chemical injection unit. The GR will notify the contractor to replace parts as identified in Appendix C annually and dispose of replaced parts in accordance with Japanese laws and regulations.
1.1.2.6. Inspection and Maintenance Report. The Contractor shall submit inspection and maintenance reports digitally in English and Japanese to the GR within two (2) weeks after the inspection and maintenance date. The reports shall include each system by location, name of inspectors, date of inspection/maintenance, condition of all water quality control system and list all deficiencies found. If repairs or replacements are required, the Contractor shall provide description of deficiencies and estimated costs of work. Additionally, the Contractor shall make an oral report concerning the result of inspection and maintenance to the GR immediately when deficiencies are found.
1.2. WATER QUALITY CONTROL SERVICE. The Contractor shall provide water quality control service for the cooling towers listed in Appendix A as follows.
1.2.1. Chemical Control Service. The Contractor shall control the chemical dosage for the water treatment system to avoid generating algae, scale, and slime during the cooling season as referred to the Japan Refrigeration and Air Conditioning Industry Association Guidelines (JRA-
GL) (社団法人日本冷凍空調工業会).
1.2.1.1 Chemicals. The Contractor shall provide the necessary chemicals to prevent corrosion and control of scale and slime and prevent from Legionella Bacteria generation. The chemicals shall not include materials specified in the Pollution Release and Transfer Register (PRTR) Law No. 86 of Government of Japan in 1999 and revision of cabinet order Nov 2008.
1.2.1.1. The Contractor shall have a knowledge of the chemical’s features, usage, and how to handle to prevent corrosion and control of scale and slime, and prevent the generation of Legionella Bacteria without causing damage to the refrigerator and cooling towers.
1.2.1.2. Safety Data Sheets (SDS). The Contractor shall provide SDS in both English and Japanese for all chemicals to the GR within ten (10) working days after award. The Contractor shall bring the SDS with the chemicals when accessing U.S. installations.
1.2.1.3. The Contractor shall submit a monthly report to the GR for the usage of chemicals within two (2) working days after completion of the monthly services.
1.2.2. Sampling, Analysis and Assessment. The Contractor shall provide the following sampling and laboratory analytical services to support the work and requirements in compliance with the JRA-GL including turbid metric analysis, chemical concentration, and legionella bacteria. Such sampling and testing procedures shall be provided to the GR for review and comments before sampling and testing are conducted.
a. Cooling Water & Make-up Water: Sample cooling water for all cooling towers, and sample make-up water for cooling towers at buildings 425 and 743 of CZ, shall be tested for June, July, August and September of the cooling season.
b. Legionella Bacteria: Laboratory analysis of legionella bacteria shall be provided to the GR for June, July, August and September of the cooling season.
1.2.2.1. Laboratory Analysis Report. Results from the laboratory analysis shall be reported and provide an assessment of each cooling tower’s current condition. The Contractor shall submit report digitally in both English and Japanese to the GR within two (2) weeks from the sampling date. A complete set of laboratory records shall be submitted to the GR. All laboratory tests include: date and time of sampling, type of sample, name of sample, location of sample performed, and test results. All reports, records and associated correspondence shall be maintained on file and made available to the GR for review as requested.
1.2.2.2. After each laboratory analysis results, chemical injection pumps shall be adjusted to meet the required chemical concentration.
1.3. CLEANING IN THE COOLING SYSTEM.
1.3.1. The Contractor shall perform the physical or/and chemical cleaning to eliminate contaminants in the cooling system caused by circulating water and outside condition to prevent from major operational problems and damage of cooling tower operation. The cleaning services shall be accomplished when:
a. Abnormality of cooling water analysis result and / or abnormality of equipment pressure in the system is identified.
b. Excess amount of dirt scale, slime, and algae, etc. is present within the interior of the cooling towers.
c. When 100 Colony Forming Unit (UFC) or more.
1.3.2. The Contractor shall notify the GR when cleaning service is required. The Contractor shall submit work schedule for cleaning in English and Japanese to the GR for approval within two (2) days after determined to conduct cleaning work. The reports shall include system by location, name of worker, date of cleaning work, work description. Cleaning services and restoring cooling systems shall be performed during normal operation.
1.4. END OF COOLING SEASON.
1.4.1. The Contractor will be notified by the GR before required shut down date of each cooling towers at the end of the cooling season. The Contractor shall shut down service within ten (10) working days after being notified by the GR. Shut down services shall include, but are not limited to the following:
a. The Contractor shall shut down water quality control devices to secure them for the cooling “off season”.
b. The Contractor shall close the make-up water valves for water quality control devices for the cooling towers.
c. The Contractor shall flush the chemical feed pumps for cooling towers.
d. The Contractor shall cover to protect the sensors from outside conditions.
e. The Contractor shall turn off the power supply of water quality control devices for cooling towers.
f. The Contractor shall remove the empty chemical containers and unused excess chemicals from the installation to off-base.
g. All materials delivered and placed in the equipment room of each cooling tower’s building shall be protected from the weather, excessive humidity and temperature variations, dirt and dust, and any other contaminants.
2.0. GENERAL INFORMATION.
2.1. CONTRACTOR PERSONNEL.
2.1.1. Contract Manager. The Contractor shall provide a contract manager who shall be responsible for all requirements in this PWS. The name of this person and an alternate(s) who shall act for the Contractor when the manager is absent, shall be designated in writing to the Contracting Officer (KO). The contract manager or alternate shall have full authority to act for the Contractor on all matters relating to this contract. The Contractor shall provide the contract manager’s names, addresses, and telephone numbers. The Contractor shall maintain a current listing of employees, providing updates as changes occur. The contract manager or alternate shall have a good understanding of the requirements pertaining to this contract for interpretation and implementation of directives (written and oral), issued in English by the KO or GR. If the contract manager or alternate do not meet these requirements, the Contractor shall provide a translator for them.
2.1.2. Contractor Employees. The Contractor personnel shall be easily recognizable as Contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the Contractor’s company name and the employee’s name.
2.1.3. Removal of Contractor’s Employees. The Contractor shall utilize only experienced, responsible and capable employees in the performance of this contract. The KO may require that the Contractor remove any of his/her employees who endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of the U.S.
Government.
2.1.4. Third Country Nationals (TCN). The security forces on each base control entry to the base. Under certain circumstances, the TCN might be denied entry. It is the Contractor’s responsibility to coordinate with security forces at each base when there is a question about particular entry circumstances.
2.1.5. U.S. Government and/or Master Labor Contract Employees. The Contractor shall not hire employees of the U.S. Government and/or Government of Japan Master Labor Contract employees in violation of the Procurement Integrity Act. See FAR 3.104. Furthermore, the Contractor shall not employ any Department of Defense employee, either military or civilian, unless such person seeks and receives approval in accordance with Department of Defense 5500.7-R, Joint Ethics Regulation.”
2.1.6. Military Personnel. The Contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station (PCS), change in duty hours, or deployment. Military Reservists and National Guard members may be subject to recall to active duty. Abrupt absence of these personnel could adversely affect Contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for non-performance under this contract.
2.1.7. Roster. The Contractor shall provide a complete roster of all personnel (including the contract manager and alternate contract manager) to the GR prior to start of performance. The roster must include all employee names, addresses, and telephone numbers. The Contractor shall maintain a current listing of employees, providing updates as changes occur.
2.2. QUALITY CONTROL. The Contractor shall develop and maintain a quality control program to ensure the services are performed in accordance with commonly accepted commercial practices. The Contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective services.
2.3. QUALITY ASSURANCE. The Government will evaluate the Contractor’s performance by appointing a GR to monitor performance to ensure services are received.
2.4. GOVERNMENT REMEDIES. The KO shall follow FAR 52.212-4, Contract Terms and Conditions-Commercial Items, for the Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
2.5. CONTRACTING OFFICER (KO) AUTHORITY. Only the KO has authority to enter into, administer, terminate or modify the terms and conditions herein. Any changes made by persons other than the KO will be considered an unauthorized commitment and subject to ratification actions in accordance with FAR 1.602-3.
2.6. CONTRACTING OFFICER’S REPRESENTATIVE (GR). The Contractor shall coordinate all aspects of this requirement with the GR. Completed work shall be subject to inspection and acceptance by GR. This designation will be made in writing by the KO at the time of contract award, or prior to commencement of GR duty. The GR shall NOT direct or redirect any Contractor action(s). This can only be done by the KO.
2.7. AVAILABILITY OF FACILITY.
2.7.1. Hours of Service. The Contractor’s personnel will perform scheduled work on weekdays, Monday through Friday (exclusive of the U.S. legal and other designated holidays listed below), during normal duty hours, 0800 - 1600 hours unless prior arrangements have been made with the GR.
2.7.2. Legal American Holidays and Other Designated Holidays.
American Holidays 1 January New Year’s Days 3rd Monday in January Martin Luther King Jr.’s Birthday 3rd Monday in February President’s Day Last Monday in May Memorial Day 4th of July* Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day 11 November* Veterans Day 4th Thursday in November Thanksgiving Day 25 December* Christmas Day
Other Designated Holidays 11 Aug Mountain Day 1, 2 & 3 January New Year’s Days 29, 30 & 31 December Year End Days
*Holidays falling on a Saturday will be observed on the preceding Friday, and holidays falling on a Sunday will be observed on the following Monday.
2.7.3. Arrangements of the Performance Time. Should the Contractor decide to perform any of the required services before or after normal duty hours, the Contractor shall request approval prior to performance from the GR and shall do so at no additional cost to the Government.
2.8. SECURITY AND SAFETY REQUIREMENTS.
2.8.1. Installation Base Passes. The U.S. Government will issue all required Installation/Base Passes and Controlled Area Badges to Contractor personnel at no cost to the Contractor. Vehicle insurance certificates are required to obtain Base Passes and must cover the automobile liability insurance in the types and minimum amounts of (a) Bodily Injury - ¥30,000,000 per person per occurrence, in addition to the Japanese Compulsory Insurance (JCI), and (b) Property Damage -
¥3,000,000 per occurrence. The prime Contractor shall be responsible for all passes issued to his/her own or subcontractor’s employees under this contract. The Contractor shall return all applicable passes upon termination of employment or completion of this contract to the Japanese Pass Section, and a certificate of receipt shall be obtained.
NOTE: Contractor personnel are required to comply with U.S. Army Regulation 190-5 for personnel pass requirements. Contractors are also required to comply with U.S. Army Garrison Japan Regulation 190-13 for vehicle pass requirements. These regulations are available for the selected Contractor’s review upon personnel and/or vehicle pass issuance.
2.8.2 Security Requirements. The Contractor shall ensure each employee obtains all the required passes and identification items for access to U.S. Government’s installations. These items are issued by the Security Forces Pass and Registration Section. The Contractor and employees shall return identification cards to Security Forces within 24 hours of termination or completion of this contract. All other Government identification for terminated employees shall be returned to the KO within 24 hours of termination.
2.8.3. Off Limit Signs. The Contractor shall provide warning and/or ”OFF LIMITS” signs in both English and Japanese and post them at the entrances of jobsite, and barricades around the jobsite while the equipment and/or systems are being serviced. The Contractor shall control all personnel desiring access into jobsite areas when work is in progress.
2.8.4. Reserved.
2.8.5. Reports of Damages, Destruction, Injury, or Death
2.8.5.1. The Contractor shall report all incidents of damage or destruction to property, or personal injury or death to any person, arising out of and during the performance of this contract.
The term “property” includes equipment, freight, or property of any type, whether Government owned or not. The term “Contractor” includes the Contractor, its agents, servants or employees.
2.8.5.2. The Contractor shall submit these reports to the KO through the GR as follows:
(a) A preliminary report shall be made as soon as practicable after the time the incident occurs.
The report may be either verbal or facsimile.
(b) A complete written report shall be submitted within 4 days (96 hours) after occurrence of the incident. A copy of this report shall be furnished to the GR.
2.8.6. Security Danger Warning, Accident Prevention, Fire Prevention and Fire Protection Requirements. The Contractor shall comply with all pertinent requirements of the U.S. Army and USAG-J Fire Protection and Safety Regulations or Laws of Japan, whichever is more stringent, to insure compliance by all subcontractors.
2.8.7. Accident Prevention Plan and a Job Hazard Analysis. The Contractor shall not commence work at the job site until an Accident Prevention Plan and a Job Hazard Analysis are submitted for review and approved by the GR. The Contractor is responsible for reviewing section 1 and 34 of EM 385-1-1, the US Army Corps of Engineers’ Safety and Health Requirements Manual, http://140.194.76.129/publications/eng-manuals/em385-1- 1/2008_English/toc.html.
2.8.8. Hazardous Materials. All hazardous materials must be contained and stored in the appropriate storage containers and/or cabinets. The Contractor shall immediately report spills or release of hazardous materials to the GR. The Contractor shall be liable for containment and environmental clean-up of spill or release of such substance. The Contractor shall comply with municipal environmental laws to protect the health and safety of employees/residents and minimize or eliminate environmental pollution. The Contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling.
2.8.9. Environmental Regulations. The Contractor shall comply with all U.S. Government and Japanese environmental laws (whichever are most stringent) to protect the health and safety of employees/residents, and preserve the local and global environment. The Contractor shall comply with the Japan Environmental Governing Standards (JEGS) and shall minimize or eliminate environmental pollution and energy/utility waste.
2.8.10. Environmental and Hazardous Material Handling. The Contractor shall comply with the Japan Environmental Governing Standards (JEGS) to protect the health and safety of employees/residents and minimize or eliminate environmental pollution.
The Contractor shall follow the installation Spill Prevention Control and Response Plan (SPR) Plan (https://home.army.mil/sites/pcr/usagj/DPW/Environmental%20Publications/Forms/AllItems.asp
x) in case of a spill or release of POL and/or hazardous substances. The Contractor shall immediately notify Fire and Emergency Services, Directorate of Emergency Services, U.S.
Army Garrison Japan of any spills that occur on the installation through the Emergency Phone Number. The Contractor will be liable for containment and clean-up of the site.
2.8.11. Delivery and Storage of Materials. All materials delivered and placed in storage shall be protected from the weather, humidity and temperature variations, dirt and dust, or other contaminants by the Contractor.
2.8.12. Disposal of Materials. All debris and unserviceable materials generated under this contract such as industrial waste, non-recyclable materials and equipment/material not listed on hand-receipts shall be disposed of off-base by the Contractor in accordance with the laws of Japan. Hand receipt items require turn-in action by the Contractor when the listed items have to be replaced.
2.8.13. Responsibility for Damages. Any damages caused to U.S. Government property during the course of performing this contract shall be restored, replaced and/or repaired to its original condition at no additional cost to the U.S. Government.
2.9. CLEANLINESS. The Contractor is responsible for cleanliness of the service areas. This includes, but is not limited to, washing, sweeping, dusting and other janitorial services necessary to maintain the area in a clean and sanitary condition. The Contractor shall furnish such supplies as required.
2.10. COMMERCIAL WARRANTY. The Contractor shall provide the Government with their commercial warranty. The Government shall receive the same warranty service as the Contractor’s most favored customers. If the services fail to be performed or otherwise fail due to workmanship or materials, the Contractor shall correct the affected area(s) at no additional cost to the U.S. Government. The Government reserves the right to reject any unserviceable or substandard item and to require replacement with a serviceable like item or acceptable quality item or to require full credit for the item.
2.11. CONSERVATION OF UTILITIES. The Contractor shall instruct employees in utility conservation practices. The Contractor shall be responsible for operating under conditions, which preclude the waste of utilities. The Contractor shall comply with additional energy policies upon notification by the KO.
2.12. CONTRACTOR MANPOWER REPORTING. The office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor will report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor is required to completely fill in all the information in the format using the following web address: https://cmra.army.mil/.
The required information includes:
(1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative
(2) Contract number, including task and delivery order number
(3) Beginning and ending dates covered by reporting period
(4) Contractor name, address, phone number, e-mail address, identity of Contractor employee entering data
(5) Estimated direct labor hours (including sub-contractors)
(6) Estimated direct labor dollars paid this reporting period (including sub-contractors)
(7) Total payments (including sub-contractors)
(8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-contractor if different)
(9) Estimated data collection cost
(10) Organizational title associated with the Unit Identification Code (UIC) for the Army
Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information)
(11) Locations where Contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website)
(12) Presence of deployment or contingency contract language
(13) Number of Contractor and sub-contractor employees deployed in theater this reporting period (by country)
As part of its submission, the Contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year. The Contractor may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site. (NOTE: XML = Extensible Markup Language)
SECTION 2
THIS SECTION IS RESERVED.
SECTION 3
THIS SECTION IS RESERVED.
SECTION 4
APPENDICES
APPENDICES.
APPENDIX A: Cooling Towers List.
APPENDIX B: Estimate of Annual Chemical Consumption
APPENDIX C: Annual Replacement Parts List
APPENDIX A:
Cooling Towers List
No. BLDG MAKE MODEL
COOLING
CAP
CIRCULATION
WATER
Estimated System Operational Hours During Cooling Season
Equipped with
Chemical Feeder
Kcal/h Liter / min Hours /
Day Hours / Week
Months
1 103 Shinwa SBC-60ES 216,000 720 16 80
May to Nov
O
2 123 Shinwa SBC-40ES 153,000 510 16 80 X
3 123 Shinwa SBC-15ES 51,000 170 16 80 X
4 125 Hitachi MT-8014LK 288,000 960 16 80 O
5 250 Shinwa SBC-125ES 398,000 1330 24 168 O
6 267 Kuuken SKB-200PP 720,000 2400 16 112 O
7 278 Shinwa SBC-100ES 402,000 1300 16 112 O
8 381 Mitsubishi
Jyushi
HT-6SQ6 402,000 97.5 16 112 X
9 425 Kuuken SKBPOR-80 288,000 960 20 140 O
10 425 Kuuken SKBPOR-80 288,000 960 20 140 O
11 457 Shinwa SBC-175SS 590,992 1970 18 126 O
12 457 Shinwa SBC-175SS 590,992 1970 18 126 O
13 552 Kuuken SKV-50FS 195,000 948 24 168 X
14 602 Shinwa SBC40ES 90,000 300 24 168 X
15 645 Mitsubishi
Jyusi
HT-15S9B 58,500 180 24 168 X
16 646 Shinwa SBC-100ES 390,000 1300 16 80 O
17 683 Shinwa SBC-30ES 108,000 360 16 80 X
18 691 Kuuken SKV40F 15,600 480 18 126 X
19 696 Shinwa SBC-20ESS 78,000 240 24 168 O
20 715 Kuuken SKB-80PR 223,000 960 24 168 O
21 742 Shinwa SBC-30ESS 115,200 390 24 168 O
22 743 Kuuken SKB150POR 576,000 1920 24 168 O
23 760 Hitachi MT20141K 72,000 240 24 168 X
24 780 Ebara
Shinwa
SBC-100ES 390,010 1300 24 168 O
25 881 Shinwa SBC-40ES 117,000 480 24 168 O
26 906 Kuuken
SKB-
POER125RT
402,000 1340 24 168 O
27 951 Kuuken SKB-POER 576,000 1950 24 168 O
APPENDIX B
Estimate of Annual Chemical Consumption
1. Multi Solution Type 1,400 Liter
Make: Orugano Co., Model: Orugardo SP91
2. Multi Pack Type 60 ea
Make: Orugano Co., Model: Orugardo Pack Multi 30LZ
3. Multi Pack Type 74 Kg
Make: Nissan Kagaku Co., Model: Ureoright L90
APPENDIX C
Annual Replacement Parts List
Replace chemical feed pump and chemical tank.
No. EQUIPMENT TYPE CAPACITY ELEC REMARKS QTY
Chemical Feed
Pump
Solenoid Type Pulse
Pump
(mL/min), 1-300(spm)
1.0 (Mpa; at Max Discharge
Pressure)
1 PHx100V- 240Vx50Hz
Foot Valve, Siphon Check Valve, Standard Accessories
2 Chemical Tank Polyethylene
Type 30 L - -
Anchor Plate, Standard
Accessories