4_17T0012_Exhibits_2016_11_08.pdf

PDF 545 KB Posted

Attached to
Transport of International Organization for Standardization (ISO) Containers and Government-owend/Controlled Containers
Solicitation number
FA5209-17-T-0012
Issued by

About this file

Exhibits - Pricing Schedule

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibits to Solicitation No. FA5209-17-T-0012

A 010 Between Yokohama North Dock, Mizuho-cho, Kanagawa-ku, Yokohama-shi, Kanagawa-ken and Honmoku Futo, Honmoku-futo, Naka-ku, Yokohama-shi, Kanagawa-ken or Minami-Honmoku Futo, Minami-Honmoku, Naka-ku, Yokohama-shi, Kanagawa-ken

(10 km/13 km)

A 01A 20' container ¥ ¥

A 01B 40' container ¥ ¥

A 020 Between Yokohama North Dock and US Fleet Activities, Yokosuka, Hon-cho, Yokosuka-shi, Kanagawa-ken

(29 km)

A 02A 20' container ¥ ¥

A 02B 40' container ¥ ¥

A 030 Between Sagami General Depot, Kamiyabe, Sagamihara-shi, Kanagawa-ken and Yokohama North Dock or Honmoku Futo or Minami-Honmoku Futo

(32 km/35 km/38 km)

A 03A 20' container ¥ ¥

A 03B 40' container ¥ ¥

A 040 Between Sagami General Depot and Yokota Ari Base, Fussa-shi, Tokyo-to

(24 km)

A 04A 20' container ¥ ¥

A 04B 40' container ¥ ¥

A 050 Between Sagami General Depot and US Fleet Activities, Yokosuka

(52 km)

A 05A 20' container ¥ ¥

A 05B 40' container ¥ ¥

A 060 Between Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken and Honmoku Futo or Minami-Honmoku Futo

(722 km/725 km)

A 06A 20' Container ¥ ¥

A 06B 40' Container ¥ ¥

A 070 Between Yokohama North Dock or US Fleet Activities, Yokosuka and USMC Air Station, Iwakuni, Misumi-machi, Iwakuni-shi, Yamaguchi-ken

(923 km/921 km)

A 07A 20' container ¥ ¥

A 07B 40' container ¥ ¥

Description Estimated

(Est.) Qty Est. Amount

01 EA 0

EA 0 0

2 EA

20 EA 0

0 0

2 EA 0 0

1 EA 0 0

1 EA 0 0

1 EA 0 0

EXHIBITS: PRICING SCHEDULE

(Distances are estimates only)

EXHIBIT A: BASE YEAR (12 months After Date of Contract from the Effective Date in Block 3 of Standard Form (SF) 1449)

Unit Unit Price

(UP)

1 EA 0 0

The Contractor shall perform transportation services of containers defined in paragraph (para) 1 of the Performance Work Statement (PWS).

All listed unit prices shall be per container of general freight, except ELINs A09B and A09C.

2 EA 0 0

EA

EA

Exhibit Line

Item No.

(ELIN)

2 EA 0 0

1 EA 0 0

A 080 Between Yokohama North Dock or Honmoku Futo or Minami-Honmoku Futo and USA Kyogamisaki Communications Site, Sodeshi, Tango-cho, Kyotango-shi, Kyoto-fu

(647 km/650 km/ 653 km)

A 08A 20' container ¥ ¥

A 08B 40' container ¥ ¥

A 090 Between 10th RSG Ammunition Depot, Kawakami Depot, Hachihonmatsu-cho, Higashi-Hiroshima-shi, Hiroshima-ken and 10th RSG Ammunition Depot, Hiro Depot, Hiro-Oban-cho, Kure-shi, Hiroshima-ken

(37 km)

A 09A 20' container ¥ ¥

A 09B 20' container stuffed with sensitive freight ¥ ¥

A 09C 20' container stuffed with hazardous freight ¥ ¥

A 100 Between USMC Air Station, Iwakuni and Fukuoka Island City (including Kashii Park Port), Minato-Kashii, Higashi-ku, Fukuoka-shi, Fukuoka-ken

(236 km)

A 10A 20' container ¥ ¥

A 10B 40' container ¥ ¥

A 110 Between USMC Air Station, Iwakuni and Rokko Island, Koyo-cho-Nishi, Higashi-Nada-ku, Kobe-shi, Hyogo-ken

(372 km)

A 11A 20' container ¥ ¥

A 11B 40' container ¥ ¥

A 120 Between US Fleet Activities, Sasebo, Tategami-machi, Sasebo-shi, Nagasaki-ken or NAVSUP Fleet Logistics Center Yokosuka, Sasebo Detachment, Akasaki Fuel Terminal, Akasaki-cho, Sasebo-shi, Nagasaki-ken and Fukuoka Island City (including Kashii Park Port)

(123 km/127 km)

A 12A 20' container ¥ ¥

A 12B 40' container ¥ ¥

A 130 thru A200 Reserved.

A 210 Accessorial Services, Cancellation Charges and Table Items:

A 21A All rates shall be increased by the percentage (%) for transporting a container loaded with dangerous freight.

A 21B All rates shall be increased by the percentage (%) for transporting a container loaded with hazardous freight.

A 21C All rates shall be increased by the percentage (%) for transporting a container loaded with sensitive freight.

A 21D All rates shall be increased by the percentage (%) for transporting a container to/from Tohoku/Hokuriku-

Shin'etsu Area during the winter period.

① ②

① ②

① ②

① ②

EA 0 0

3 EA 0

15 EA 0 0

6 EA

20 EA 0 0

30 EA 0 0

50 EA

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 1.1%) x ① Offer Rate (%) = ② Est. Amount

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 2.9%) x ① Offer Rate (%) = ② Est. Amount

(%) or (UP)

PWS

Reference

Percentage

2.9% 0

Para 1.2.4. 1.1% 0

Paragraph (Para) 1.2.2.

Para 1.5.11(e)(1)

Para 1.2.3. 0.1% 0 0

Est. Qty

0.1%

Est. Amount

0 0

EA 0 0

EA 0 0

0Est. Total Amount (A):

4 EA 0 0

1 EA 0 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

ELIN Description

A 21E

A 21F All rates shall be increased by the percentage (%) for transporting a container to/from Hokkaido Area during the winter period.

A 21G All rates shall be increased by the percentage (%) for transporting a container within Hokkaido Area during the winter period.

A 21H All rates shall be increased by the percentage (%) for Midnight and Early Morning Charge.

A 21J For transporting a container to be paid by non-appropriated funds, the rates shall be increased by the percentage (%). However, for a container consisting of freight to be paid by a combination of appropriated and non-appropriated funds, the instance increase shall not be applied.

A 21K Loan of 20' container chassis per day. ¥ ¥

A 21L Loan of 40' container chassis per day. ¥ ¥

A 21M Demurrage charge for each truck-tractor. ¥ ¥

A 21N Demurrage charge for 20' container chassis. ¥ ¥

A 21P Demurrage charge for 40' container chassis. ¥ ¥

A 21Q Cancellation charge for truck-tractor with 20' container chassis.

A 21R Cancellation charge for truck-tractor with 40' container chassis.

A 21S Cancellation charge for transportation of hazardous freight with certificate which the Contractor has obtained from GOJ authority. ¥ ¥

A 21T Distance Rate Table for transportation services NOT specified in ELINs A010 through A120. (See Table 1)

A 21U One-way and Round Trip Ferry Charge per 20ft/40ft container chassis for transportation of containers. (See Table 2)

A 21V Use of Toll Roads as directed by the Transportation Officer.

①

① ②

① ②

②

① ②

Para 1.5.11(g)

Para 1.5.11(b)

Para 1.5.11(b)

Para 1.5.11(f)

Para 1.5.11(c)

(Insert the above Est. Grand Total Amount on CLIN 0001 of SF1449)

① ②

③ ④

⑤ ⑥

Para 1.5.11(e)(1)

Para 1.5.11(e)(2)

Para 1.5.11(e)(2)

Para 1.5.11(d)

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

EST. GRAND TOTAL AMOUNT FOR (A) + (B):

Est. Total Amount (B): 0

Formula: Offered ⑤ EST. TOTAL AMOUNT of Table 2 x Est. Qty (11%) = ⑥ Est. Amount

Formula: Offered ③ EST. TOTAL AMOUNT of Table 1 x Est. Qty (62%) = ④ Est. Amount

11% 0 0

062% 0

2 rig 0

1 cert. 0 0

1 rig 0

Para 1.5.3

Remarks: Fill in Table 2 first, then insert the estimated total amount for Table 2 into "⑤ EST. TOTAL AMOUNT of Table 2".

Remarks: Fill in Table 1 first, then insert the estimated total amount for Table 1 into "③ EST. TOTAL AMOUNT of Table 1".

Para 1.5.12(a)

Para 1.5.12(b)

2 chassis 0 0

Track-tractor 0

(per half hour)

1 chassis 0

1 chassis 0 0

(per 24 hours)

(per 24 hours)

Para 1.5.11(a)(2)

Para 1.5.11(a)(2)

Para 1.5.12(a)

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 4.6%) x ① Offer Rate (%) = ② Est. Amount

0.1% 0 0

0.1% 0 0

00.1%

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

4.6% 0 0

(per day)

(per day)

13 chassis 0

Para 1.5.11(a)(1)

All rates shall be increased by the percentage (%) for transporting a container within Tohoku/Hokuriku-Shin'etsu Area during the winter period.

00.1%

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

(Pricing Schedule for ELIN A21T)

(Insert above EST. TOTAL AMOUNT of Table 1 on A21T ③)

Every 50 km over 1,000 km

0EST. TOTAL AMOUNT by 1 each for all items under Table 1 (A21T):

1,000

180 0

Up through 50

Container Size

40ft20ft

Distance Rate Table

Table 1

Distance in Km

General/Sensitive Freight Round Trip Round-trip without Explosives

Between Aomori-ko and Hakodate-ko

Between Oarai-ko and Tomakomai-ko

Between Hachinohe-ko and Tomakomai-ko

Between Ariake Futo and Shin-Moji-ko

Tokushima

Round Trip Round-trip

Dangerous Freight

Between Aomori-ko and Hakodate-ko

Hazardous/Sensitive Freight Round Trip Round-trip with Explosives

Between Aomori-ko and Hakodate-ko

(Pricing Schedule for ELIN A21U)

(Insert above EST. TOTAL AMOUNT of Table 1 on A21U ⑤)

EST. TOTAL AMOUNT by 1 each for all items under Table 1 (A21U): 0

0 0 0 0

0 0 0 0

One-way One-way

0 0 0 0

One-way

One-way

One-way/Round Trip Ferry Charge per 20ft/40ft Container Chassis

One-way One-way

0 0

0 0 0

0 0 0 0

Table 2

B 010 Between Yokohama North Dock, Mizuho-cho, Kanagawa-ku, Yokohama-shi, Kanagawa-ken and Honmoku Futo, Honmoku-futo, Naka-ku, Yokohama-shi, Kanagawa-ken or Minami-Honmoku Futo, Minami-Honmoku, Naka-ku, Yokohama-shi, Kanagawa-ken

(10 km/13 km)

B 01A 20' container ¥ ¥

B 01B 40' container ¥ ¥

B 020 Between Yokohama North Dock and US Fleet Activities, Yokosuka, Hon-cho, Yokosuka-shi, Kanagawa-ken

(29 km)

B 02A 20' container ¥ ¥

B 02B 40' container ¥ ¥

B 030 Between Sagami General Depot, Kamiyabe, Sagamihara-shi, Kanagawa-ken and Yokohama North Dock or Honmoku Futo or Minami-Honmoku Futo

(32 km/35 km/38 km)

B 03A 20' container ¥ ¥

B 03B 40' container ¥ ¥

B 040 Between Sagami General Depot and Yokota Ari Base, Fussa-shi, Tokyo-to

(24 km)

B 04A 20' container ¥ ¥

B 04B 40' container ¥ ¥

B 050 Between Sagami General Depot and US Fleet Activities, Yokosuka

(52 km)

B 05A 20' container ¥ ¥

B 05B 40' container ¥ ¥

B 060 Between Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken and Honmoku Futo or Minami-Honmoku Futo

(722 km/725 km)

B 06A 20' Container ¥ ¥

B 06B 40' Container ¥ ¥

B 070 Between Yokohama North Dock or US Fleet Activities, Yokosuka and USMC Air Station, Iwakuni, Misumi-machi, Iwakuni-shi, Yamaguchi-ken

(923 km/921 km)

B 07A 20' container ¥ ¥

B 07B 40' container ¥ ¥

B 080 Between Yokohama North Dock or Honmoku Futo or Minami-Honmoku Futo and USA Kyogamisaki Communications Site, Sodeshi, Tango-cho, Kyotango-shi, Kyoto-fu

(647 km/650 km/ 653 km)

B 08A 20' container ¥ ¥

B 08B 40' container ¥ ¥6 EA 0 0

10 EA 0 0

1 EA 0 0

2 EA 0 0

15 EA 0 0

8 EA 0 0

1 EA 0 0

2 EA 0 0

2 EA 0 0

1 EA 0 0

1 EA 0 0

20 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

1 EA 0 0

EXHIBIT B: OPTION ONE (for a period of 12 months subsequent to BASE YEAR completion)

ELIN Est. Qty Unit UP Est. Amount

The Contractor shall perform transportation services of containers defined in para 1 of the PWS.

All listed unit prices shall be per container of general freight, except ELINs B09B and B09C.

Description

B 090 Between 10th RSG Ammunition Depot, Kawakami Depot, Hachihonmatsu-cho, Higashi-Hiroshima-shi, Hiroshima-ken and 10th RSG Ammunition Depot, Hiro Depot, Hiro-Oban-cho, Kure-shi, Hiroshima-ken

(37 km)

B 09A 20' container ¥ ¥

B 09B 20' container stuffed with sensitive freight ¥ ¥

B 09C 20' container stuffed with hazardous freight ¥ ¥

B 100 Between USMC Air Station, Iwakuni and Fukuoka Island City (including Kashii Park Port), Minato-Kashii, Higashi-ku, Fukuoka-shi, Fukuoka-ken

(236 km)

B 10A 20' container ¥ ¥

B 10B 40' container ¥ ¥

B 110 Between USMC Air Station, Iwakuni and Rokko Island, Koyo-cho-Nishi, Higashi-Nada-ku, Kobe-shi, Hyogo-ken

(372 km)

B 11A 20' container ¥ ¥

B 11B 40' container ¥ ¥

B 120 Between US Fleet Activities, Sasebo, Tategami-machi, Sasebo-shi, Nagasaki-ken or NAVSUP Fleet Logistics Center Yokosuka, Sasebo Detachment, Akasaki Fuel Terminal, Akasaki-cho, Sasebo-shi, Nagasaki-ken and Fukuoka Island City (including Kashii Park Port)

(123 km/127 km)

B 12A 20' container ¥ ¥

B 12B 40' container ¥ ¥

B 130 thru B200 Reserved.

B 210 Accessorial Services, Cancellation Charges and Table Items:

B 21A All rates shall be increased by the percentage (%) for transporting a container loaded with dangerous freight.

B 21B All rates shall be increased by the percentage (%) for transporting a container loaded with hazardous freight.

B 21C All rates shall be increased by the percentage (%) for transporting a container loaded with sensitive freight.

B 21D All rates shall be increased by the percentage (%) for transporting a container to/from Tohoku/Hokuriku-

Shin'etsu Area during the winter period.

B 21E

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 1.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(e)(1) 2.9% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 2.9%) x ① Offer Rate (%) = ② Est. Amount

All rates shall be increased by the percentage (%) for transporting a container within Tohoku/Hokuriku-Shin'etsu Area during the winter period.

Para 1.5.11(e)(1) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

1.1% ① ② 0

4 EA 0 0

1 EA 0 0

Para 1.2.4. 0

Para 1.2.2. 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.2.3. 0.1%

Est. Total Amount (A): 0

ELIN Description

PWS

Est. Qty Est. Amount Reference

3 EA 0 0

1 EA 0 0

20 EA 0 0

1 EA 0 0

30 EA 0 0

7 EA 0 0

% or UP

50 EA 0 0

B 21F All rates shall be increased by the percentage (%) for transporting a container to/from Hokkaido Area during the winter period.

B 21G All rates shall be increased by the percentage (%) for transporting a container within Hokkaido Area during the winter period.

B 21H All rates shall be increased by the percentage (%) for Midnight and Early Morning Charge.

B 21J For transporting a container to be paid by non-appropriated funds, the rates shall be increased by the percentage (%). However, for a container consisting of freight to be paid by a combination of appropriated and non-appropriated funds, the instance increase shall not be applied.

B 21K Loan of 20' container chassis per day. ¥ ¥

B 21L Loan of 40' container chassis per day. ¥ ¥

B 21M Demurrage charge for each truck-tractor. ¥ ¥

B 21N Demurrage charge for 20' container chassis. ¥ ¥

B 21P Demurrage charge for 40' container chassis. ¥ ¥

B 21Q Cancellation charge for truck-tractor with 20' container chassis.

B 21R Cancellation charge for truck-tractor with 40' container chassis.

B 21S Cancellation charge for transportation of hazardous freight with certificate which the Contractor has obtained

B 21T Distance Rate Table for transportation services NOT specified in ELINs B010 through B120. (See Table 1)

B 21U One-way and Round Trip Ferry Charge per 20ft/40ft container chassis for transportation of containers. (See Table 2)

B 21V Use of Toll Roads as directed by the Transportation Officer.

Remarks: Fill in Table 2 first, then insert the estimated total amount for Table 2 into "⑤ EST. TOTAL AMOUNT of Table 2".

Formula: Offered ⑤ EST. TOTAL AMOUNT of Table 2 x Est. Qty (11%) = ⑥ Est. Amount

Para 1.5.11(c)

Est. Total Amount (B): 0

EST. GRAND TOTAL AMOUNT FOR (A) + (B): 0

(Insert the above Est. Grand Total Amount on CLIN 1001 of SF1449)

Para 1.5.11(b) 13 chassis 0

(per day)

Para 1.5.11(a)(1) 62 Track-tractor 0

Para 1.5.11(f) 0 0

Remarks: Fill in Table 1 first, then insert the estimated total amount for Table 1 into "③ EST. TOTAL AMOUNT of Table 1".

Formula: Offered ③ EST. TOTAL AMOUNT of Table 1 x Est. Qty (62%) = ④ Est. Amount

11% ⑤ ⑥

0 0

Para 1.5.12(b) 1 cert. 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 4.6%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(e)(2) 0.1% ① 0 ② 0

Para 1.5.11(e)(2) 4.6% ① 0 ②

Para 1.5.3 62% ③ ④

Para 1.5.12(a) 1 rig 0 0

Para 1.5.12(a) 2 rig 0 0

(per half hour)

Para 1.5.11(a)(2) 1 chassis 0 0

(per 24 hours)

Para 1.5.11(a)(2) 1 chassis 0

(per 24 hours)

Para 1.5.11(g) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(b) 2 chassis 0 0

(per day)

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(d) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

130 0 0

EST. TOTAL AMOUNT by 1 each for all items under Table 1 (B21T): 0

(Insert above EST. TOTAL AMOUNT of Table 1 on B21T ③)

Up through 50 0 0

60 0 0

70 0 0

850 0 0

900 0 0

950 0 0

700 0 0

Table 1

1,000 0 0

Every 50 km over 1,000 km 0 0

750 0 0

800 0 0

550 0 0

600 0 0

650 0 0

460 0 0

480 0 0

500 0 0

400 0 0

420 0 0

440 0 0

340 0 0

360 0 0

380 0 0

280 0 0

300 0 0

320 0 0

220 0 0

240 0 0

260 0 0

180 0 0

190 0 0

200 0 0

140 0 0

0 0

160 0 0

170 0 0

80 0 0

90 0 0

100 0 0

110 0 0

120 0 0

(Pricing Schedule for ELIN B21T)

Distance Rate Table

Container Size

Distance in Km 20ft 40ft

General/Sensitive Freight Round Trip Round-trip without Explosives

Between Aomori-ko and Hakodate-ko

Between Oarai-ko and Tomakomai-ko

Between Hachinohe-ko and Tomakomai-ko

Between Ariake Futo and Shin-Moji-ko

Tokushima

Round Trip Round-trip

Dangerous Freight

Between Aomori-ko and Hakodate-ko

Hazardous/Sensitive Freight Round Trip Round-trip with Explosives

Between Aomori-ko and Hakodate-ko

One-way One-way

One-way One-way

EST. TOTAL AMOUNT by 1 each for all items under Table 1 (B21U): 0

(Insert above EST. TOTAL AMOUNT of Table 1 on B21U ⑤)

0 0 0 0

0 0 0 0

0 00 0

Table 2

(Pricing Schedule for ELIN B21U)

0 0 0 0

0 0 0 0

0 0 0 0

One-way One-way

One-way/Round Trip Ferry Charge per 20ft/40ft Container Chassis

C 010 Between Yokohama North Dock, Mizuho-cho, Kanagawa-ku, Yokohama-shi, Kanagawa-ken and Honmoku Futo, Honmoku-futo, Naka-ku, Yokohama-shi, Kanagawa-ken or Minami-Honmoku Futo, Minami-Honmoku, Naka-ku, Yokohama-shi, Kanagawa-ken

(10 km/13 km)

C 01A 20' container ¥ ¥

C 01B 40' container ¥ ¥

C 020 Between Yokohama North Dock and US Fleet Activities, Yokosuka, Hon-cho, Yokosuka-shi, Kanagawa-ken

(29 km)

C 02A 20' container ¥ ¥

C 02B 40' container ¥ ¥

C 030 Between Sagami General Depot, Kamiyabe, Sagamihara-shi, Kanagawa-ken and Yokohama North Dock or Honmoku Futo or Minami-Honmoku Futo

(32 km/35 km/38 km)

C 03A 20' container ¥ ¥

C 03B 40' container ¥ ¥

C 040 Between Sagami General Depot and Yokota Ari Base, Fussa-shi, Tokyo-to

(24 km)

C 04A 20' container ¥ ¥

C 04B 40' container ¥ ¥

C 050 Between Sagami General Depot and US Fleet Activities, Yokosuka

(52 km)

C 05A 20' container ¥ ¥

C 05B 40' container ¥ ¥

C 060 Between Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken and Honmoku Futo or Minami-Honmoku Futo

(722 km/725 km)

C 06A 20' Container ¥ ¥

C 06B 40' Container ¥ ¥

C 070 Between Yokohama North Dock or US Fleet Activities, Yokosuka and USMC Air Station, Iwakuni, Misumi-machi, Iwakuni-shi, Yamaguchi-ken

(923 km/921 km)

C 07A 20' container ¥ ¥

C 07B 40' container ¥ ¥

C 080 Between Yokohama North Dock or Honmoku Futo or Minami-Honmoku Futo and USA Kyogamisaki Communications Site, Sodeshi, Tango-cho, Kyotango-shi, Kyoto-fu

(647 km/650 km/ 653 km)

C 08A 20' container ¥ ¥

C 08B 40' container ¥ ¥

15 EA 0 0

6 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

10 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

20 EA 0 0

All listed unit prices shall be per container of general freight, except ELINs C09B and C09C.

8 EA 0 0

1 EA 0 0

EXHIBIT C: OPTION TWO (for a period of 12 months subsequent to OPTION ONE completion)

ELIN Description Est. Qty Unit UP Est. Amount

The Contractor shall perform transportation services of containers defined in para 1 of the PWS.

C 090 Between 10th RSG Ammunition Depot, Kawakami Depot, Hachihonmatsu-cho, Higashi-Hiroshima-shi, Hiroshima-ken and 10th RSG Ammunition Depot, Hiro Depot, Hiro-Oban-cho, Kure-shi, Hiroshima-ken

(37 km)

C 09A 20' container ¥ ¥

C 09B 20' container stuffed with sensitive freight ¥ ¥

C 09C 20' container stuffed with hazardous freight ¥ ¥

C 100 Between USMC Air Station, Iwakuni and Fukuoka Island City (including Kashii Park Port), Minato-Kashii, Higashi-ku, Fukuoka-shi, Fukuoka-ken

(236 km)

C 10A 20' container ¥ ¥

C 10B 40' container ¥ ¥

C 110 Between USMC Air Station, Iwakuni and Rokko Island, Koyo-cho-Nishi, Higashi-Nada-ku, Kobe-shi, Hyogo-ken

(372 km)

C 11A 20' container ¥ ¥

C 11B 40' container ¥ ¥

C 120 Between US Fleet Activities, Sasebo, Tategami-machi, Sasebo-shi, Nagasaki-ken or NAVSUP Fleet Logistics Center Yokosuka, Sasebo Detachment, Akasaki Fuel Terminal, Akasaki-cho, Sasebo-shi, Nagasaki-ken and Fukuoka Island City (including Kashii Park Port)

(123 km/127 km)

C 12A 20' container ¥ ¥

C 12B 40' container ¥ ¥

C 130 thru C200 Reserved.

C 210 Accessorial Services, Cancellation Charges and Table Items:

C 21A All rates shall be increased by the percentage (%) for transporting a container loaded with dangerous freight.

C 21B All rates shall be increased by the percentage (%) for transporting a container loaded with hazardous freight.

C 21C All rates shall be increased by the percentage (%) for transporting a container loaded with sensitive freight.

C 21D All rates shall be increased by the percentage (%) for transporting a container to/from Tohoku/Hokuriku-

Shin'etsu Area during the winter period.

C 21E

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(e)(1) 2.9% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 2.9%) x ① Offer Rate (%) = ② Est. Amount

All rates shall be increased by the percentage (%) for transporting a container within Tohoku/Hokuriku-Shin'etsu Area during the winter period.

Para 1.5.11(e)(1) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.2.4. 1.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 1.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.2.2. 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.2.3. 0.1% ① 0 ② 0

Est. Total Amount (A): 0

ELIN Description

PWS

Est. Qty Est. Amount Reference

4 EA 0 0

1 EA 0 0

% or UP

1 EA 0 0

3 EA 0 0

1 EA 0 0

20 EA 0 0

30 EA 0 0

7 EA 0 0

C 21F All rates shall be increased by the percentage (%) for transporting a container to/from Hokkaido Area during the winter period.

C 21G All rates shall be increased by the percentage (%) for transporting a container within Hokkaido Area during the winter period.

C 21H All rates shall be increased by the percentage (%) for Midnight and Early Morning Charge.

C 21J For transporting a container to be paid by non-appropriated funds, the rates shall be increased by the percentage (%). However, for a container consisting of freight to be paid by a combination of appropriated and non-appropriated funds, the instance increase shall not be applied.

C 21K Loan of 20' container chassis per day. ¥ ¥

C 21L Loan of 40' container chassis per day. ¥ ¥

C 21M Demurrage charge for each truck-tractor. ¥ ¥

C 21N Demurrage charge for 20' container chassis. ¥ ¥

C 21P Demurrage charge for 40' container chassis. ¥ ¥

C 21Q Cancellation charge for truck-tractor with 20' container chassis.

C 21R Cancellation charge for truck-tractor with 40' container chassis.

C 21S Cancellation charge for transportation of hazardous freight with certificate which the Contractor has obtained

C 21T Distance Rate Table for transportation services NOT specified in ELINs C010 through C120. (See Table 1)

C 21U One-way and Round Trip Ferry Charge per 20ft/40ft container chassis for transportation of containers. (See Table 2)

C 21V Use of Toll Roads as directed by the Transportation Officer.

Formula: Offered ⑤ EST. TOTAL AMOUNT of Table 2 x Est. Qty (11%) = ⑥ Est. Amount

Para 1.5.11(c)

Est. Total Amount (B): 0

EST. GRAND TOTAL AMOUNT FOR (A) + (B): 0

(Insert the above Est. Grand Total Amount on CLIN 2001 of SF1449)

Remarks: Fill in Table 1 first, then insert the estimated total amount for Table 1 into "③ EST. TOTAL AMOUNT of Table 1".

Formula: Offered ③ EST. TOTAL AMOUNT of Table 1 x Est. Qty (62%) = ④ Est. Amount

Para 1.5.11(f) 11% ⑤ 0 ⑥ 0

Remarks: Fill in Table 2 first, then insert the estimated total amount for Table 2 into "⑤ EST. TOTAL AMOUNT of Table 2".

Para 1.5.12(b) 1 cert. 0 0

Para 1.5.3 62% ③ 0 ④ 0

(per 24 hours)

Para 1.5.12(a) 2 rig 0 0

Para 1.5.12(a) 1 rig 0 0

(per half hour)

Para 1.5.11(a)(2) 1 chassis 0 0

(per 24 hours)

Para 1.5.11(a)(2) 1 chassis 0 0

(per day)

Para 1.5.11(b) 13 chassis 0 0

(per day)

Para 1.5.11(a)(1) 62 Track-tractor 0 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(g) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(b) 2 chassis 0 0

Para 1.5.11(e)(2) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(d) 0.1% ① 0 ② 0

Para 1.5.11(e)(2) 4.6% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 4.6%) x ① Offer Rate (%) = ② Est. Amount

¥EST. TOTAL AMOUNT by 1 each for all items under Table 1 (C21T): 0

(Insert above EST. TOTAL AMOUNT of Table 1 on C21T ③)

1,000 0 0

Every 50 km over 1,000 km 0 0

850 0 0

900 0 0

950 0 0

700 0 0

750 0 0

800 0 0

550 0 0

600 0 0

650 0 0

460 0 0

480 0 0

500 0 0

400 0 0

420 0 0

440 0 0

340 0 0

360 0 0

380 0 0

280 0 0

300 0 0

320 0 0

220 0 0

240 0 0

260 0 0

180 0 0

190 0 0

200 0 0

150 0 0

160 0 0

170 0 0

120 0 0

130 0 0

140 0 0

90 0 0

100 0 0

110 0 0

60 0 0

70 0 0

80 0 0

Distance Rate Table

Container Size

Distance in Km 20ft 40ft

Up through 50 0 0

(Pricing Schedule for ELIN C21T)

General/Sensitive Freight Round Trip Round-trip without Explosives

Between Aomori-ko and Hakodate-ko

Between Oarai-ko and Tomakomai-ko

Between Hachinohe-ko and Tomakomai-ko

Between Ariake Futo and Shin-Moji-ko

Tokushima

Round Trip Round-trip

Dangerous Freight

Between Aomori-ko and Hakodate-ko

Hazardous/Sensitive Freight Round Trip Round-trip with Explosives

Between Aomori-ko and Hakodate-ko

0 0 0 0

EST. TOTAL AMOUNT by 1 each for all items under Table 1 (C21U): 0

(Insert above EST. TOTAL AMOUNT of Table 1 on C21U ⑤)

0 0 0 0

One-way One-way

0 0 0 0

One-way One-way

0 0 0 0

0 0 0 0

0 0 0 0

Table 2

(Pricing Schedule for ELIN C21U)

One-way/Round Trip Ferry Charge per 20ft/40ft Container Chassis

D 010 Between Yokohama North Dock, Mizuho-cho, Kanagawa-ku, Yokohama-shi, Kanagawa-ken and Honmoku Futo, Honmoku-futo, Naka-ku, Yokohama-shi, Kanagawa-ken or Minami-Honmoku Futo, Minami-Honmoku, Naka-ku, Yokohama-shi, Kanagawa-ken

(10 km/13 km)

D 01A 20' container ¥ ¥

D 01B 40' container ¥ ¥

D 020 Between Yokohama North Dock and US Fleet Activities, Yokosuka, Hon-cho, Yokosuka-shi, Kanagawa-ken

(29 km)

D 02A 20' container ¥ ¥

D 02B 40' container ¥ ¥

D 030 Between Sagami General Depot, Kamiyabe, Sagamihara-shi, Kanagawa-ken and Yokohama North Dock or Honmoku Futo or Minami-Honmoku Futo

(32 km/35 km/38 km)

D 03A 20' container ¥ ¥

D 03B 40' container ¥ ¥

D 040 Between Sagami General Depot and Yokota Ari Base, Fussa-shi, Tokyo-to

(24 km)

D 04A 20' container ¥ ¥

D 04B 40' container ¥ ¥

D 050 Between Sagami General Depot and US Fleet Activities, Yokosuka

(52 km)

D 05A 20' container ¥ ¥

D 05B 40' container ¥ ¥

D 060 Between Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken and Honmoku Futo or Minami-Honmoku Futo

(722 km/725 km)

D 06A 20' Container ¥ ¥

D 06B 40' Container ¥ ¥

D 070 Between Yokohama North Dock or US Fleet Activities, Yokosuka and USMC Air Station, Iwakuni, Misumi-machi, Iwakuni-shi, Yamaguchi-ken

(923 km/921 km)

D 07A 20' container ¥ ¥

D 07B 40' container ¥ ¥

D 080 Between Yokohama North Dock or Honmoku Futo or Minami-Honmoku Futo and USA Kyogamisaki Communications Site, Sodeshi, Tango-cho, Kyotango-shi, Kyoto-fu

(647 km/650 km/ 653 km)

D 08A 20' container ¥ ¥

D 08B 40' container ¥ ¥

15 EA 0 0

6 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

10 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

20 EA 0 0

The Contractor shall perform transportation services of containers defined in para 1 of the PWS.

All listed unit prices shall be per container of general freight, except ELINs D09B and D09C.

8 EA 0 0

1 EA 0 0

EXHIBIT D: OPTION THREE (for a period of 12 months subsequent to OPTION TWO completion)

D 090 Between 10th RSG Ammunition Depot, Kawakami Depot, Hachihonmatsu-cho, Higashi-Hiroshima-shi, Hiroshima-ken and 10th RSG Ammunition Depot, Hiro Depot, Hiro-Oban-cho, Kure-shi, Hiroshima-ken

(37 km)

D 09A 20' container ¥ ¥

D 09B 20' container stuffed with sensitive freight ¥ ¥

D 09C 20' container stuffed with hazardous freight ¥ ¥

D 100 Between USMC Air Station, Iwakuni and Fukuoka Island City (including Kashii Park Port), Minato-Kashii, Higashi-ku, Fukuoka-shi, Fukuoka-ken

(236 km)

D 10A 20' container ¥ ¥

D 10B 40' container ¥ ¥

D 110 Between USMC Air Station, Iwakuni and Rokko Island, Koyo-cho-Nishi, Higashi-Nada-ku, Kobe-shi, Hyogo-ken

(372 km)

D 11A 20' container ¥ ¥

D 11B 40' container ¥ ¥

D 120 Between US Fleet Activities, Sasebo, Tategami-machi, Sasebo-shi, Nagasaki-ken or NAVSUP Fleet Logistics Center Yokosuka, Sasebo Detachment, Akasaki Fuel Terminal, Akasaki-cho, Sasebo-shi, Nagasaki-ken and Fukuoka Island City (including Kashii Park Port)

(123 km/127 km)

D 12A 20' container ¥ ¥

D 12B 40' container ¥ ¥

D 130 thru D200 Reserved.

D 210 Accessorial Services, Cancellation Charges and Table Items:

D 21A All rates shall be increased by the percentage (%) for transporting a container loaded with dangerous freight.

D 21B All rates shall be increased by the percentage (%) for transporting a container loaded with hazardous freight.

D 21C All rates shall be increased by the percentage (%) for transporting a container loaded with sensitive freight.

D 21D All rates shall be increased by the percentage (%) for transporting a container to/from Tohoku/Hokuriku-

Shin'etsu Area during the winter period.

D 21E

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(e)(1) 2.9% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 2.9%) x ① Offer Rate (%) = ② Est. Amount

All rates shall be increased by the percentage (%) for transporting a container within Tohoku/Hokuriku-Shin'etsu Area during the winter period.

Para 1.5.11(e)(1) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.2.4. 1.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 1.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.2.2. 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.2.3. 0.1% ① 0 ② 0

Est. Total Amount (A): 0

ELIN Description

PWS

Est. Qty Est. Amount Reference

4 EA 0 0

1 EA 0 0

% or UP

1 EA 0 0

3 EA 0 0

1 EA 0 0

20 EA 0 0

30 EA 0 0

D 21F All rates shall be increased by the percentage (%) for transporting a container to/from Hokkaido Area during the winter period.

D 21G All rates shall be increased by the percentage (%) for transporting a container within Hokkaido Area during the winter period.

D 21H All rates shall be increased by the percentage (%) for Midnight and Early Morning Charge.

D 21J For transporting a container to be paid by non-appropriated funds, the rates shall be increased by the percentage (%). However, for a container consisting of freight to be paid by a combination of appropriated and non-appropriated funds, the instance increase shall not be applied.

D 21K Loan of 20' container chassis per day. ¥ ¥

D 21L Loan of 40' container chassis per day. ¥ ¥

D 21M Demurrage charge for each truck-tractor. ¥ ¥

D 21N Demurrage charge for 20' container chassis. ¥ ¥

D 21P Demurrage charge for 40' container chassis. ¥ ¥

D 21Q Cancellation charge for truck-tractor with 20' container chassis.

D 21R Cancellation charge for truck-tractor with 40' container chassis.

D 21S Cancellation charge for transportation of hazardous freight with certificate which the Contractor has obtained

D 21T Distance Rate Table for transportation services NOT specified in ELINs D010 through D120. (See Table 1)

D 21U One-way and Round Trip Ferry Charge per 20ft/40ft container chassis for transportation of containers. (See Table 2)

D 21V Use of Toll Roads as directed by the Transportation Officer.

Formula: Offered ⑤ EST. TOTAL AMOUNT of Table 2 x Est. Qty (11%) = ⑥ Est. Amount

Para 1.5.11(c)

Est. Total Amount (B): 0

EST. GRAND TOTAL AMOUNT FOR (A) + (B): 0

(Insert the above Est. Grand Total Amount on CLIN 3001 of SF1449)

Remarks: Fill in Table 1 first, then insert the estimated total amount for Table 1 into "③ EST. TOTAL AMOUNT of Table 1".

Formula: Offered ③ EST. TOTAL AMOUNT of Table 1 x Est. Qty (62%) = ④ Est. Amount

Para 1.5.11(f) 11% ⑤ 0 ⑥ 0

Remarks: Fill in Table 2 first, then insert the estimated total amount for Table 2 into "⑤ EST. TOTAL AMOUNT of Table 2".

Para 1.5.12(b) 1 cert. 0 0

Para 1.5.3 62% ③ 0 ④ 0

(per 24 hours)

Para 1.5.12(a) 2 rig 0 0

Para 1.5.12(a) 1 rig 0 0

(per half hour)

Para 1.5.11(a)(2) 1 chassis 0 0

(per 24 hours)

Para 1.5.11(a)(2) 1 chassis 0 0

(per day)

Para 1.5.11(b) 13 chassis 0 0

(per day)

Para 1.5.11(a)(1) 62 Track-tractor 0 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(g) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(b) 2 chassis 0 0

Para 1.5.11(e)(2) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(d) 0.1% ① 0 ② 0

¥EST. TOTAL AMOUNT by 1 each for all items under Table 1 (D21T): 0

(Insert above EST. TOTAL AMOUNT of Table 1 on D21T ③)

1,000 0 0

Every 50 km over 1,000 km 0 0

850 0 0

900 0 0

950 0 0

700 0 0

750 0 0

800 0 0

550 0 0

600 0 0

650 0 0

460 0 0

480 0 0

500 0 0

400 0 0

420 0 0

440 0 0

340 0 0

360 0 0

380 0 0

280 0 0

300 0 0

320 0 0

220 0 0

240 0 0

260 0 0

180 0 0

190 0 0

200 0 0

150 0 0

160 0 0

170 0 0

120 0 0

130 0 0

140 0 0

90 0 0

100 0 0

110 0 0

60 0 0

70 0 0

80 0 0

Distance Rate Table

Container Size

Distance in Km 20ft 40ft

Up through 50 0 0

(Pricing Schedule for ELIN D21T)

General/Sensitive Freight Round Trip Round-trip without Explosives

Between Aomori-ko and Hakodate-ko

Between Oarai-ko and Tomakomai-ko

Between Hachinohe-ko and Tomakomai-ko

Between Ariake Futo and Shin-Moji-ko

Tokushima

Round Trip Round-trip

Dangerous Freight

Between Aomori-ko and Hakodate-ko

Hazardous/Sensitive Freight Round Trip Round-trip with Explosives

Between Aomori-ko and Hakodate-ko

0 0 0 0

EST. TOTAL AMOUNT by 1 each for all items under Table 1 (D21U): 0

(Insert above EST. TOTAL AMOUNT of Table 1 on D21U ⑤)

0 0 0 0

One-way One-way

0 0 0 0

One-way One-way

0 0 0 0

0 0 0 0

0 0 0 0

Table 2

(Pricing Schedule for ELIN D21U)

One-way/Round Trip Ferry Charge per 20ft/40ft Container Chassis

E 010 Between Yokohama North Dock, Mizuho-cho, Kanagawa-ku, Yokohama-shi, Kanagawa-ken and Honmoku Futo, Honmoku-futo, Naka-ku, Yokohama-shi, Kanagawa-ken or Minami-Honmoku Futo, Minami-Honmoku, Naka-ku, Yokohama-shi, Kanagawa-ken

(10 km/13 km)

E 01A 20' container ¥ ¥

E 01B 40' container ¥ ¥

E 020 Between Yokohama North Dock and US Fleet Activities, Yokosuka, Hon-cho, Yokosuka-shi, Kanagawa-ken

(29 km)

E 02A 20' container ¥ ¥

E 02B 40' container ¥ ¥

E 030 Between Sagami General Depot, Kamiyabe, Sagamihara-shi, Kanagawa-ken and Yokohama North Dock or Honmoku Futo or Minami-Honmoku Futo

(32 km/35 km/38 km)

E 03A 20' container ¥ ¥

E 03B 40' container ¥ ¥

E 040 Between Sagami General Depot and Yokota Ari Base, Fussa-shi, Tokyo-to

(24 km)

E 04A 20' container ¥ ¥

E 04B 40' container ¥ ¥

E 050 Between Sagami General Depot and US Fleet Activities, Yokosuka

(52 km)

E 05A 20' container ¥ ¥

E 05B 40' container ¥ ¥

E 060 Between Misawa Air Base, Hirahata 1-chome, Misawa-shi, Aomori-ken and Honmoku Futo or Minami-Honmoku Futo

(722 km/725 km)

E 06A 20' Container ¥ ¥

E 06B 40' Container ¥ ¥

E 070 Between Yokohama North Dock or US Fleet Activities, Yokosuka and USMC Air Station, Iwakuni, Misumi-machi, Iwakuni-shi, Yamaguchi-ken

(923 km/921 km)

E 07A 20' container ¥ ¥

E 07B 40' container ¥ ¥

E 080 Between Yokohama North Dock or Honmoku Futo or Minami-Honmoku Futo and USA Kyogamisaki Communications Site, Sodeshi, Tango-cho, Kyotango-shi, Kyoto-fu

(647 km/650 km/ 653 km)

E 08A 20' container ¥ ¥

E 08B 40' container ¥ ¥

15 EA 0 0

6 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

10 EA 0 0

1 EA 0 0

2 EA 0 0

1 EA 0 0

20 EA 0 0

The Contractor shall perform transportation services of containers defined in para 1 of the PWS.

All listed unit prices shall be per container of general freight, except ELINs E09B and E09C.

8 EA 0 0

1 EA 0 0

EXHIBIT E: OPTION FOUR (for a period of 12 months subsequent to OPTION THREE completion)

E 090 Between 10th RSG Ammunition Depot, Kawakami Depot, Hachihonmatsu-cho, Higashi-Hiroshima-shi, Hiroshima-ken and 10th RSG Ammunition Depot, Hiro Depot, Hiro-Oban-cho, Kure-shi, Hiroshima-ken

(37 km)

E 09A 20' container ¥ ¥

E 09B 20' container stuffed with sensitive freight ¥ ¥

E 09C 20' container stuffed with hazardous freight ¥ ¥

E 100 Between USMC Air Station, Iwakuni and Fukuoka Island City (including Kashii Park Port), Minato-Kashii, Higashi-ku, Fukuoka-shi, Fukuoka-ken

(236 km)

E 10A 20' container ¥ ¥

E 10B 40' container ¥ ¥

E 110 Between USMC Air Station, Iwakuni and Rokko Island, Koyo-cho-Nishi, Higashi-Nada-ku, Kobe-shi, Hyogo-ken

(372 km)

E 11A 20' container ¥ ¥

E 11B 40' container ¥ ¥

E 120 Between US Fleet Activities, Sasebo, Tategami-machi, Sasebo-shi, Nagasaki-ken or NAVSUP Fleet Logistics Center Yokosuka, Sasebo Detachment, Akasaki Fuel Terminal, Akasaki-cho, Sasebo-shi, Nagasaki-ken and Fukuoka Island City (including Kashii Park Port)

(123 km/127 km)

E 12A 20' container ¥ ¥

E 12B 40' container ¥ ¥

E 130 thru E200 Reserved.

E 210 Accessorial Services, Cancellation Charges and Table Items:

E 21A All rates shall be increased by the percentage (%) for transporting a container loaded with dangerous freight.

E 21B All rates shall be increased by the percentage (%) for transporting a container loaded with hazardous freight.

E 21C All rates shall be increased by the percentage (%) for transporting a container loaded with sensitive freight.

E 21D All rates shall be increased by the percentage (%) for transporting a container to/from Tohoku/Hokuriku-

Shin'etsu Area during the winter period.

E 21E

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(e)(1) 2.9% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 2.9%) x ① Offer Rate (%) = ② Est. Amount

All rates shall be increased by the percentage (%) for transporting a container within Tohoku/Hokuriku-Shin'etsu Area during the winter period.

Para 1.5.11(e)(1) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.2.4. 1.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 1.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.2.2. 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.2.3. 0.1% ① 0 ② 0

Est. Total Amount (A): 0

ELIN Description

PWS

Est. Qty Est. Amount Reference

4 EA 0 0

1 EA 0 0

% or UP

1 EA 0 0

3 EA 0 0

1 EA 0 0

20 EA 0 0

30 EA 0 0

E 21F All rates shall be increased by the percentage (%) for transporting a container to/from Hokkaido Area during the winter period.

E 21G All rates shall be increased by the percentage (%) for transporting a container within Hokkaido Area during the winter period.

E 21H All rates shall be increased by the percentage (%) for Midnight and Early Morning Charge.

E 21J For transporting a container to be paid by non-appropriated funds, the rates shall be increased by the percentage (%). However, for a container consisting of freight to be paid by a combination of appropriated and non-appropriated funds, the instance increase shall not be applied.

E 21K Loan of 20' container chassis per day. ¥ ¥

E 21L Loan of 40' container chassis per day. ¥ ¥

E 21M Demurrage charge for each truck-tractor. ¥ ¥

E 21N Demurrage charge for 20' container chassis. ¥ ¥

E 21P Demurrage charge for 40' container chassis. ¥ ¥

E 21Q Cancellation charge for truck-tractor with 20' container chassis.

E 21R Cancellation charge for truck-tractor with 40' container chassis.

E 21S Cancellation charge for transportation of hazardous freight with certificate which the Contractor has obtained

E 21T Distance Rate Table for transportation services NOT specified in ELINs E010 through E120. (See Table 1)

E 21U One-way and Round Trip Ferry Charge per 20ft/40ft container chassis for transportation of containers. (See Table 2)

E 21V Use of Toll Roads as directed by the Transportation Officer.

Formula: Offered ⑤ EST. TOTAL AMOUNT of Table 2 x Est. Qty (11%) = ⑥ Est. Amount

Para 1.5.11(c)

Est. Total Amount (B): 0

EST. GRAND TOTAL AMOUNT FOR (A) + (B): 0

(Insert the above Est. Grand Total Amount on CLIN 4001 of SF1449)

Remarks: Fill in Table 1 first, then insert the estimated total amount for Table 1 into "③ EST. TOTAL AMOUNT of Table 1".

Formula: Offered ③ EST. TOTAL AMOUNT of Table 1 x Est. Qty (62%) = ④ Est. Amount

Para 1.5.11(f) 11% ⑤ 0 ⑥ 0

Remarks: Fill in Table 2 first, then insert the estimated total amount for Table 2 into "⑤ EST. TOTAL AMOUNT of Table 2".

Para 1.5.12(b) 1 cert. 0 0

Para 1.5.3 62% ③ 0 ④ 0

(per 24 hours)

Para 1.5.12(a) 2 rig 0 0

Para 1.5.12(a) 1 rig 0 0

(per half hour)

Para 1.5.11(a)(2) 1 chassis 0 0

(per 24 hours)

Para 1.5.11(a)(2) 1 chassis 0 0

(per day)

Para 1.5.11(b) 13 chassis 0 0

(per day)

Para 1.5.11(a)(1) 62 Track-tractor 0 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(g) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(b) 2 chassis 0 0

Para 1.5.11(e)(2) 0.1% ① 0 ② 0

Formula: Offered "ESTIMATED TOTAL AMOUNT (A)" x Est. Qty (= 0.1%) x ① Offer Rate (%) = ② Est. Amount

Para 1.5.11(d) 0.1% ① 0 ② 0

¥EST. TOTAL AMOUNT by 1 each for all items under Table 1 (E21T): 0

(Insert above EST. TOTAL AMOUNT of Table 1 on E21T ③)

1,000 0 0

Every 50 km over 1,000 km 0 0

850 0 0

900 0 0

950 0 0

700 0 0

750 0 0

800 0 0

550 0 0

600 0 0

650 0 0

460 0 0

480 0 0

500 0 0

400 0 0

420 0 0

440 0 0

340 0 0

360 0 0

380 0 0

280 0 0

300 0 0

320 0 0

220 0 0

240 0 0

260 0 0

180 0 0

190 0 0

200 0 0

150 0 0

160 0 0

170 0 0

120 0 0

130 0 0

140 0 0

90 0 0

100 0 0

110 0 0

60 0 0

70 0 0

80 0 0

Distance Rate Table

Container Size

Distance in Km 20ft 40ft

Up through 50 0 0

(Pricing Schedule for ELIN E21T)

General/Sensitive Freight Round Trip Round-trip without Explosives

Between Aomori-ko and Hakodate-ko

Between Oarai-ko and Tomakomai-ko

Between Hachinohe-ko and Tomakomai-ko

Between Ariake Futo and Shin-Moji-ko

Tokushima

Round Trip Round-trip

Dangerous Freight

Between Aomori-ko and Hakodate-ko

Hazardous/Sensitive Freight Round Trip Round-trip with Explosives

Between Aomori-ko and Hakodate-ko

0 0 0 0

EST. TOTAL AMOUNT by 1 each for all items under Table 1 (E21U): 0

(Insert above EST. TOTAL AMOUNT of Table 1 on E21U ⑤)

0 0 0 0

One-way One-way

0 0 0 0

One-way One-way

0 0 0 0

0 0 0 0

0 0 0 0

Table 2

(Pricing Schedule for ELIN E21U)

One-way/Round Trip Ferry Charge per 20ft/40ft Container Chassis

File details come from the government source that posted it. Updated .