Solicitation No. FA5209-17-R-0004 Attachment

STATEMENT OF WORK

FOR

DEPARTMENT OF THE ARMY

RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND

INTERNATIONAL TECHNOLOGY CENTER-PACIFIC

(ITC-PAC)

Investigation on High Performance Tunable Multilayer Capacitors and Piezoelectric Thin

Film Transformers (Document No. W90GQZ-71400032)

1. DESCRIPTION OF SERVICE.

This requirement is to provide financing in support of the research project titled “Investigation on High Performance Tunable Multilayer Capacitors and Piezoelectric Thin Film Transformers”, led by Professor Sahn Nahm, Dept. of Materials Science and Engineering, Korea University Research and Business Foundation, South Korea.

The goal of the proposal is to develop various new Tunable Multilayer Capacitors and Piezoelectric Thin Film Transformers. In the project, it is focused on to investigate the relation between the performance of the tunable devices and microstructural properties of Multilayer Capacitors. The sintering mechanism of the dielectric ceramics will be also studied. Tunable capacitors are widely used in various industrial applications, such as voltage controlled oscillators, phase shifters, filters, L/C circuits to set the resonance frequency and impedance matching in multi-band cellular handsets and mobile TV receivers. Tunable capacitors should have a large tunability and a low dielectric loss. The tunability and the loss of the ceramic capacitor can be influenced by the dopant types and the microstructure of the specimens such as defects and grain size. Moreover, the miniaturization of the capacitors can be realized by using the multilayer tunable dielectrics. For the synthesis of the multilayer tunable capacitors, Ag metal is frequently used as an electrode in multilayer devices because of its low cost and high conductivity. Since the melting temperature of Ag is 961 C, tunable dielectric ceramics for multilayer devices should be sintered at temperatures below 950 C. Therefore, the microstructure, types of the dopants and the sintering process of the dielectric ceramics are important to obtain the high quality multilayer tunable devices.

The objective of this proposed effort is effort to examine the development on the properties for tunable capacitor, which will be obtained in this work, are following:

. Tunability > 20 % . Applied electric field < 50 kV/cm . Frequency: 10 Hz ~ 1 MHz . Q > 100 . K-factor > 20 . Capacitance > 100 pF

The overall goal of this project is to (1) Material Design as; (1-1) Testifying that the microstructural and compositional design of BST and CCTO cermamics is a relevant factor for advanced tunable capacitors’ properties. (1-2) Investigating the most effective route for dielectrics with a large tunability with a low dielectric loss through an well-organized additive control technique. (2) Low Temperature Sintering as; It is one of the most important techniques to reduce the co-firing temperature because of the melting point of Ag electrode (~960 C). (3) Single-layer Fabrication as; (3-1) Modified tape casting process enables the thicknesses of multilayer films to be adjusted such that the capacitance of final products could be easily controlled. (3-2) Single layered PTFTs will be fabricated by the rf-sputtering method. (3-3) The efficiency of PTFTs could be increased through the epitaxially formed PZT thin films. (4) Multilayer Fabrication as; (4-1) Desired capacitance values should be obtained through the multilayer stacking processes. (4-2) Source technologies on multilayer PTFTs could be obtained during the project periods. (5) Multilayer Fabrication as; To achieve a better design of PTFTs (Piezoelectric thin-film transformer), numerical analysis of FEM simulation will be conducted.

Duration of this Research and Development is three years, comprised of 12 months for the basic period, 12 months for option 1 period, and 12 months for option 2 period. If data acceptable to the US Army, Aviation and Missile Research Development and Engineering Center (AMRDEC) cannot be collected and cannot be processed from the initial data in the basic period, the option period will not be exercised and the project will end after the basic period and the second payment.

Basic Period: Tunable Multilayer Capacitors

1. Milestone 1: The properties for tunable capacitor are following:

. Tunability > 20 % . Applied electric field < 50 kV/cm . Frequency: 10 Hz ~ 1 MHz . Q > 100 . K-factor > 20 . Capacitance > 100 pF

2. Milestone 2: The numerical analysis of finite element method (FEM) simulation and resonance characteristics are qualitatively analyzed for frequency response of PTFTs.

3. Milestone 3: The most effective route for dielectrics with a large tunability with a low dielectric loss through an well-organized additive control technique.

Option 1 Period: Low temperature sintering of BST and CCTO ceramics

1. Milestone 1: The properties for tunable capacitor are following:

. Sintering temperature < 920 C

2. Milestone 2: Single-layer Fabrication; Single layered PTFTs will be fabricated by the rf-sputtering method.

Option 2 Period: Fabrication of multilayer tunable devices having a large tunability with low loss

1. Milestone 1: The multilayer tunable capacitor with following properties.

. 5 layered ceramic + 4 layered electrode

. Co-firing temperature < 920 o

C . # of stacking > 5 . Tunability > 30 % . Applied electric field < 50 kV/cm . Frequency: 10 Hz ~ 1 MHz . Q > 100 . K-factor > 30 . Dimension: 0.6 × 0.6 mm

. Capacitance > 100 pF

2. Milestone 2: Piezoelectric thin-film transformer (PTFTs); Fabricated the prototype of PTFTs with multilayer piezoelectric thin films and evaluate the basic performance of the thin-film transformer to extract the technical issues from the viewpoint of the practical application.

1.2. DELIVERABLES.

1.2.1. First Deliverable - Project Proposal. – BASIC PERIOD

Prior to commencement of work, the contractor shall submit ITC-PAC a Project Proposal which is to measure the progress of the Project, for ITC-PAC’s acceptance.

Project Proposal shall include, at a minimum, the following information:

Project title Investigators

- Name

- Position title

- Organization name

- Address

- Telephone number

- Fax number

- Email address

Concise summary Abstract Objectives Relevance to DoD Background Summary of project plan, expected project result and expected project benefit Project duration Budget details (materials and supply, travel, etc.)

References

1.2.2. Second Deliverable – Interim Report. – BASIC PERIOD

The contractor shall submit an interim report detailing the progress of the completed segments of the project to ITC-PAC at the end of the 6-month stage after commencement of work.

Interim Report shall include, at a minimum, the following information:

Status of project plan.

Progress made in the first 6 months.

Projected progress to be made in the next 6 months.

1.2.3. Third Deliverable – BASIC PERIOD

1.2.3.1 Final Report of Basic Period –

The Contractor shall submit a Final Report of the Basic Period to ITC-PAC with all the results and discoveries encountered during the project at the end of the twelve (12) month period. The Final Report of Basic Period shall include, at a minimum, the following information;

- Name

- Position title

- Organization name

- Address

- Telephone number

- Fax number

- Email address

Summary (or Abstract) of the Project Introduction (or Background) Experiment Result & Discussion Conclusion Acknowledgement Reference Projected progress to be made in the next 12 months.

1.2.3.2. Financial Report of Basic Period

Together with the Final Report of Basic Period, the contractor shall deliver the Financial Report of this Project to ITC-PAC.

The Financial Report shall include the cost spent for the Project in the following category:

Labor Cost, Overhead, and Direct Cost (Travel, Material & Supply, Publication & Report, and Subcontract).

1.2.4. Forth Deliverable – Interim Report. – OPTION 1 PERIOD

the project to ITC-PAC at the end of the 1-month stage after commencement of Option 1 period.

Progress made in the first 1 months of Option 1 Period.

Projected progress to be made in the next 11 months.

1.2.5. Fifth Deliverable – OPTION 1 PERIOD

1.2.5.1 Final Report of Option 1 Period

The Contractor shall submit a Final Report of the Option 1 Period to ITC-PAC with all the results and discoveries encountered during the project at the end of the twelve (12) month period.

The Final Report of Option 1 Period shall include, at a minimum, the following information;

- Name

- Position title

- Organization name

- Address

- Telephone number

- Fax number

- Email address

Summary (or Abstract) of the Project Introduction (or Background) Experiment Result & Discussion Conclusion Acknowledgement

Projected progress to be made in the next 12 months.

1.2.5.2. Financial Report of Option 1 Period

Together with the Final Report of Option 1 Period, the contractor shall deliver the Financial Report of this Project to ITC-PAC.

The Financial Report shall include the cost spent for the Project in the following category:

Labor Cost, Overhead, and Direct Cost (Travel, Material & Supply, Publication & Report, and Subcontract).

1.2.6. Sixth Deliverable – Interim Report. – OPTION 2 PERIOD

the project to ITC-PAC at the end of the 1-month stage after commencement of Option 2 Period.

Progress made in the first 1 months of Option 2 period.

Projected progress to be made in the next 11 months.

1.2.7. Seventh Deliverable – OPTION 2 PERIOD

1.2.7.1 Final Report of Option 2 Period

The Contractor shall submit a Final Report of the Option 2 Period to ITC-PAC with all the results and discoveries encountered during the project at the end of the twelve (12) month period. The Final Report of the Option 2 period shall include, at a minimum, the following information;

- Nam

- Position title

- Organization name

- Address

- Telephone number

- Fax number

- Email address

Summary (or Abstract) of the Project Introduction (or Background) Experiment Result & Discussion Conclusion Acknowledgement

1.2.7.2. Financial Report of Option 2 Period

Together with the Final Report of Option 2 Period, the contractor shall deliver the Financial Report of this Project to ITC-PAC.

The Financial Report shall include the cost spent for the Project in the following category:

Labor Cost, Overhead, and Direct Cost (Travel, Material& Supply, Publication & Report, and Subcontract).

1.3. PAYMENTS.

1.3.1. First Payment. – BASIC PERIOD

After ITC-PAC’s acceptance of the Project Proposal mentioned above (First Deliverable), the contractor shall submit the first invoice to ITC-PAC. The first payment will be made upon ITC- PAC’s certification of the invoice.

1.3.2. Second Payment. – BASIC PERIOD

After ITC-PAC’s acceptance of the Second Deliverable (Interim Report of Basic Period) mentioned above, the contractor shall submit the second invoice to ITC-PAC. The second payment will be made upon ITC-PAC’s certification of the invoice.

1.3.3. Third Payment. – BASIC PERIOD

After ITC-PAC’s acceptance of the Third Deliverable (Final Report and Financial Report of Basic Period) mentioned above, the contractor shall submit the third invoice to ITC-PAC. The third payment will be made upon ITC-PAC’s certification of the invoice.

1.3.4. Fourth Payment. – OPTION 1 PERIOD

After ITC-PAC’s acceptance of the Fourth Deliverable (Interim Report of Option 1 Period) mentioned above, the contractor shall submit the fourth invoice to ITC-PAC. The fourth payment will be made upon ITC-PAC’s certification of the invoice.

1.3.5. Fifth Payment. – OPTION 1 PERIOD

After ITC-PAC’s acceptance of the Fifth Deliverable (Final Report and Financial Report of Option 1 Period) mentioned above, the contractor shall submit the fifth invoice to ITC-PAC.

The fifth payment will be made upon ITC-PAC’s certification of the invoice.

1.3.6. Sixth Payment. – OPTION 2 PERIOD

After ITC-PAC’s acceptance of the Sixth Deliverable (Interim Report of Option 2 Period) mentioned above, the contractor shall submit the sixth invoice to ITC-PAC. The sixth payment will be made upon ITC-PAC’s certification of the invoice.

1.3.7. Final Payment. – OPTION 2 PERIOD

After ITC-PAC’s acceptance of the Seventh Deliverable (Final Report and Financial Report of Option 2 Period) mentioned above, the contractor shall submit the final invoice to ITC-PAC.

The final payment will be made upon ITC-PAC’s certification of the invoice.

2. GOVERNMENT FURNISHED PROPERTY. No government furnished property shall be provided nor used in this project.

3. GENERAL INFORMATION.

3.1. Contractor Employees. Personnel shall meet or exceed the following requirement:

3.1.1. Contractor shall not hire employees of the United States Government and/or employees otherwise under contract for service to the United States Government if employing such persons would create a conflict of interest, or appearance of a conflict of interest as determined by the contractor. Contractor shall not employ any person who is an employee of DoD, unless such person seeks and receives approval according to DODR 5500.7, Standards of Conduct.