PWS_Cut_and_Trim_trees_Golf_Course_8_Sep_FBO.pdf
PDF 64 KB Posted
- Solicitation number
- FA5209-16-T-0148
About this file
PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gate_Pass_Request_Form_CZ.xlsx | XLSX spreadsheet | |
| Notice_to_offeror.pdf | ||
| FA520916T0148_Cut_and_Trim_Tree_Golf_course _CZ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 RFQ# FA5209-16-T-0148
DEPARTMENT OF THE ARMY
UNITED STATES ARMY GARRISON, JAPAN
DIRECTORATE OF PUBLIC WORKS
UNIT 45006 APO AP 96343-5006
PERFORMANCE WORK STATEMENT
TO
CUT AND TRIM TREES SERVICE
AT CAMP ZAMA
GOLF COURSE, JAPAN
Camp Zama 8 Sep 2016
FEWR No. KG-00012-6J
Table of Contents
SECTION 1 Description of Services/General Information Page 2 thru 6
SECTION 2 Reserved Page 7
SECTION 3 Government Furnished Property Page 7 And /or Services
SECTION 4 Appendices Page 8-13
SECTION 1
Description of Services/General Information
1.0. DESCRIPTION OF SERVICE. The Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary to cut and trim at Camp Zama Golf Course, Japan. This service shall be performed in accordance with (IAW) this Performance Work Statement (PWS), commercial standards, Japanese ordinances and laws, Japanese local health and safety regulation, and attached appendices.
1.1. TYPE OF SERVICES REQUIRED. The Contractor shall perform the following listed services.
1.1.1. Tree Cutting. The Contractor shall cut down trees at the ground level IAW Appendix A.
1.1.2. Tree Trimming. The Contractor shall trim the one (1) large branch from the trunk. The tree is located course #16 IAW Appendix A.
1.1.3. Disposal. After cutting and trimming trees, the Contractor shall promptly collect and remove the debris to an off-base disposal facilities IAW Japanese law(s). Temporary accumulation of the debris on site is NOT permitted without prior approval by the Government Representative (GR).
1.2. SUBMITTALS
1.2.1. Work Schedule. The Contractor shall coordinate with the GR for the establishment of work schedule within ten (10) calendar days after receipt of contact and shall submit two (2) copies of work schedule to the GR for his/her approval at least five (5) days prior to commencement of actual on-site work. The Contractor shall not deviate from the approved schedule without obtaining prior approval by the GR.
2.0. GENERAL INFORMATION
2.1. CONTRACTOR PERSONNEL.
2.1.1. Contract Manager. The Contractor shall provide a contract manager who shall be responsible for all requirements in this PWS. The name of this person and an alternate(s) who shall act for the Contractor when the manager is absent, shall be designated in writing to the Contracting Officer (KO). The contract manager or alternate shall have full authority to act for the Contractor on all matters relating to this contract. The Contractor shall provide the contract manager’s names, addresses, and telephone numbers.
The Contractor shall maintain a current listing of employees, providing updates as changes occur. The contract manager or alternate shall have a good understanding of the requirements pertaining to this contract for interpretation and implementation of directives (written and oral), issued by the KO or GR. If the contract manager or alternate do not meet these requirements, the Contractor shall provide a translator for them.
2.1.2. Contract Employees. The Contractor personnel shall be easily recognizable as Contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the Contractor’s company name and the employee’s name.
2.1.2.1. Personnel Qualification. The Contractor shall provide skilled and qualified employees necessary to perform this services under this contract. The Contractor shall ensure that employees (and/or its subcontractor) have the following current and valid professional certificates/licenses:
(1) Fist-class or Second-class Landscape Gardening Work Operation and Management Engineer (1 級もしくは 2 級造園施工管理技士).
2.1.3. Removal of Contractor’s Employees. The Contractor shall utilize only experienced, responsible and capable employees in the performance of this contract. The Contracting Officer may require that the Contractor remove from the Government job any of his/her employees who endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of military security.
2.1.4. Third Country Nationals (TCN). The Security Forces on each base control entry to the base.
Under certain circumstances, the TCN might be denied entry. It is the Contractor’s responsibility to coordinate with Security Forces at each base when there is a question about particular circumstances.
2.1.5. U.S. Government and/or Master Labor Contract Employees. The Contractor shall not hire employees of the U.S. Government and/or Government of Japan Master Labor Contract employees in violation of the Procurement Integrity Act. See FAR Section 3.104. Furthermore, the Contractor shall not employ any Department of Defense employee, either military or civilian, unless such person seeks and receives approval in accordance with Department of Defense 5500.7-R, Joint Ethics Regulation.”
2.1.6. Military Personnel. Contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station (PCS), change in duty hours, or deployment.
Military Reservists and National Guard members may be subject to recall to active duty. Abrupt absence of these personnel could adversely affect Contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for non-performance under this contract.
2.1.7. Roster. The Contractor shall provide a complete roster of all personnel (including the contract manager and alternate contract manager) to the GR prior to start of performance. The roster must include all employee names, addresses, and telephone numbers. The Contractor shall maintain a current listing of employees, providing updates as changes occur.
2.2. QUALITY CONTROL. The Contractor shall develop and maintain a quality control program to ensure the services are performed in accordance with commonly accepted commercial practices. The Contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective services.
2.3. GOVERNMENT REMEDIES. The KO shall follow FAR 52.212-4, Contract Terms and Conditions-Commercial Items for Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
2.4. CONTRACTING OFFICER (KO) AUTHORITY. Only the contracting officer has authority to enter into, administer, terminate or modify the terms and conditions herein. Any changes made by persons other than the KO will be considered an Unauthorized Commitment and subject to Ratification Actions in accordance with the Federal Acquisition Regulation part 1.602-3.
2.5. GOVERNMENT REPRESENTATIVE (GR). The Contractor shall coordinate all aspects of this project with the GR. Completed work shall be subject to inspection and acceptance by GR. The GR shall NOT direct or redirect any Contractor action(s). This can only be done by the KO.
2.6. AVAILABILITY OF FACILITIES.
2.7.1. Hours of Service. The Contractor’s personnel shall perform scheduled work on weekdays, Monday through Friday (exclusive of the U.S. legal and other designated holidays listed below) during normal duty hours of 0800 - 1630 hours, unless prior arrangements have been made with the GR.
2.7.2 Legal American Holidays and Other Holidays.
1 January New Year’s Day 3rd Monday in January Martin Luther King Jr’s Birthday 3rd Monday in February President’s Birthday Last Monday of May Memorial Day 4th July* Independence Day 1st Monday of September Labor Day 2nd Monday of October Columbus Day 11 November* Veterans Day 4th Thursday of November Thanksgiving Day 25 December* Christmas Day
Other Designated Holidays 1, 2 & 3 January New Year’s Days 11 Aug Mountain Day 29, 30 & 31 December Year End Days
*Holidays falling on a Saturday will be observed on the preceding Friday, Holidays falling on a Sunday will be observed on the following Monday.
2.7.3. Arrangements of The Performance Time. Should the Contractor decide to perform any of the required services before or after normal duty hours, the Contractor shall request the approval from the GR prior to the performance and shall do so at no additional cost to the Government.
2.8. SECURITY AND SAFETY REQUIRMENTS.
2.8.1. INSTALLATION BASE PASSES. The U.S. Government will issue all required Installation/Base Passes and Controlled Area Badges to Contractor personnel at no cost to the Contractor.
Vehicle insurance certificate are required to obtain Base Passes and must cover the automobile liability insurance in the types and minimum amounts of (a) Bodily Injury - ¥30,000,000 per person per occurrence, in addition to the Japanese Compulsory Insurance (JCI), and (b) Property Damage - ¥3,000,000 per occurrence. The prime Contractor shall be responsible for all passes issued to his/her own or subcontractor’s employees under this contract. The Contractor shall return all applicable passes upon termination of employment or completion of this contract to the Japanese Pass Section, and a certificate of receipt shall be obtained.
NOTE: Contractor personnel are required to comply with U.S. Army Regulation 190-5 for personnel pass requirements. Contractors are also required to comply with U.S. Army Garrison Japan Regulation 190-13 for vehicle pass requirements. These regulations are available for the selected Contractor’s review upon personnel and/or vehicle pass issuance.
2.8.2. Security Requirements. The Contractor shall ensure each employee obtains all the required passes and identification items for access to U.S. Government’s installations. These items are issued by the Security Forces Pass and Registration Section. The Contractor and employees shall return identification cards to Security Forces within 24 hours of termination or completion of this contract. All other Government identification for terminated employees shall be returned to the KO within 24 hours of termination.
2.8.3. Off Limit Signs. The Contractor shall provide warning and/or ”OFF LIMITS” signs in both English and Japanese and post them at the entrances of jobsite, and barricades around the jobsite while the equipment and/or systems are being serviced. The Contractor shall control all personnel desiring access into jobsite areas when work is in progress. The Contractor shall also be responsible for controlling traffic on-post in coordination with GR and Traffic Section of PMO.
2.8.4. Photography Permission. The Contractor shall obtain GR approval prior to commencing any photography.
2.8.5. Reports of Damages, Destruction, Injury, or Death
2.8.5.1. The Contractor shall report all incidents of damage or destruction to property, or personal injury or death to any person, arising out of and during the performance of this contract. The term “property” includes equipment, freight, or property of any type, whether Government owned or not. The term “Contractor” includes the Contractor, its agents, servants or employees.
2.8.5.2. The Contractor shall submit these reports to the KO through the GR as follows:
(a) A preliminary report shall be made as soon as practicable after the time the incident occurs.
Report may be either verbal or facsimile.
(b) A complete written report shall be submitted within 4 days (96 hours) after occurrence of the incident. A copy of this report shall be furnished to the GR.
2.8.6. Security Danger Warning, Accident Prevention, Fire Prevention and Fire Protection Requirements. The Contractor shall comply with all pertinent requirements of the U.S. Army and USAG-J Fire Protection and Safety Regulations or Laws of Japan, whichever is more stringent, to insure compliance by all subcontractors.
2.8.7. Accident Prevention Plan and a Job Hazard Analysis. The Contractor shall not commence work at the job site until an Accident Prevention Plan and a Job Hazard Analysis are submitted for review and approved by the GR. The Contractor is responsible for reviewing section 1 and 34 of EM 385-1-1, the US Army Corps of Engineers’ Safety and Health Requirements Manual, http://140.194.76.129/publications/eng-manuals/em385-1-1/2008_English/toc.html.
2.9. ENVIRONMENTAL REQUIREMENTS. The Contractor shall comply with the Japan Environmental Governing Standards (JEGS) and other applicable U.S. and Japanese environmental laws and regulations to preserve, protect, and conserve the quality of the environment.
2.9.1. Environmental Management System (EMS). Per Army Regulation 200-1 and the USAG Japan Regulation of 27 Feb 2013, all personnel are required to complete the EMS awareness training (approximately 1 hour) prior to the commencement of work on USAG Japan facilities. The training record shall be retained and a copy submitted to the EMS Program Manager (Environmental Division, DPW) through the GR.
2.9.2. Spill Prevention and Response. The Contractor shall follow the USAG Japan Spill Prevention and Response Plan (SPRP) in addition to the JEGS and applicable environmental laws and regulations. In the event of a spill or release of Petroleum, Oil and Lubricants (POL) and hazardous substances occurred on USAG Japan facilities, the Contractor shall immediately notify the Directorate of Emergency Services (911 or 046-407-2911) and the GR of the incident. The Contractor will be liable for containment and clean-up of the spill/release.
2.9.3. Work Site Maintenance and Waste Disposal. The Contractor is responsible for cleanliness of the work sites. Wastes and unserviceable materials generated under this contract shall be removed from the work sites at the end of each day and recycled/disposed of at off-base facilities in accordance with applicable Japanese environmental laws and regulations.
2.10. RESPONSIBILITIES FOR DAMAGES. Any damages caused to U.S. Government property during the course of performing this contract shall be restored, replaced and/or repaired to its original condition at no additional cost to the U.S. Government
2.11. RESERVED.
2.12. CONSERVATION OF UTILITIES. The Contractor shall instruct employees in utility conservation practices. The Contractor shall be responsible for operating under conditions, which preclude the waste of utilities. The Contractor shall comply with additional energy policies upon notification by the KO.
2.1.3. CONTRACTOR MANPOWER REPORTING (CMR). The office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor will report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor is required to completely fill in all the information in the format using the following web address: https://cmra.army.mil/. The required information includes:
(1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative;
(2) Contract number, including task and delivery order number;
(3) Beginning and ending dates covered by reporting period;
(4) Contractor name, address, phone number, e-mail address, identity of Contractor employee entering data;
(5) Estimated direct labor hours (including sub-contractors);
(6) Estimated direct labor dollars paid this reporting period (including sub-contractors);
(7) Total payments (including sub-contractors);
(8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-contractor if different);
(9) Estimated data collection cost;
(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information);
(11) Locations where Contractor and sub-contractor perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
(12) Presence of deployment or contingency contract language; and
(13) Number of Contractor and sub-contractor employees deployed in theater this reporting period (by country).
As part of its submission, the Contractor shall also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance. The Contractor shall complete the reporting upon completion of contract work but no later than the submission of invoice(s). The Contractor may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.
(NOTE: XML = Extensible Markup Language)
SECTION 2
THIS SECTION IS RESERVED
SECTION 3
THIS SECTION IS RESERVED
SECTION 4
APPENDICES
4. APPENDICES
Appendix A. Tree Locations at Camp Zama Golf Course
A-1. Location Maps A-1-a. Course No. 10
A-1-b. Course No. 13 A-1-c. Course No. 16