SOW_W90GQZ-61400034_Williams_ANU_20160621_-_redacted.pdf
PDF 26 KB Posted
- Attached to
- ITC-PAC R&D "Near Infrared Silicon-Based Photodetector With Dramatically Enhanced Efficiency"
- Solicitation number
- FA5209-16-T-0115
About this file
Statement of Work (SOW)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5209-16-T-0115.pdf | ||
| SSJ_W90GQZ-61400034_Williams_ANU_20160621_-_redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
DEPARTMENT OF THE ARMY
RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND
INTERNATIONAL TECHNOLOGY CENTER-PACIFIC
(ITC-PAC)
NEAR INFRARED SILICON-BASED PHOTODETECTOR WITH DRAMATICALLY
ENHANCED EFFICIENCY
(Document No. W90GQZ-61400034)
1. DESCRIPTION OF SERVICE.
This requirement is to provide financing in support of the research project titled “Near infrared silicon-based photodetector with dramatically enhanced efficiency” lead by Professor Jim Williams, Department of Electronic Materials Engineering, Research School of Physics and Engineering, Australian National University.
The main objective is to develop and fabricate an efficient near-infrared photodetector based on sub-band gap absorption in silicon achieved by hyper-doping with suitable impurities such as gold. A combination of ion implantation and pulsed laser melting will be used and the processing optimized to achieve impurity concentrations that exceed the solid solubility in silicon by several orders of magnitude.
This project will involve a 3-way collaboration between the Australian National University (ANU), the ARDEC Benet Labs and the University of Dayton. The approach to achieving an efficient silicon-based near-infrared photodetector derives from a proof-of-principle study by ANU, ARDEC, and co-investigators from MIT, Harvard, and RPI published in the prestigious journal Nature Communications showing a device response at wavelengths out to 2200nm from silicon (Si) hyper-doped with gold (Au). More recently, ANU, Harvard and MIT collaborators have shown that it is possible to achieve an order of magnitude higher concentration of Au in Si in a regime where the pulsed laser melting (PLM) results in a laterally non-uniform Au profile.
Despite a filamentary Au arrangement in Si, dramatically improved absorption of light in the infrared occurs and this suggests that a much more efficient photodiode than the initial device is feasible. This current project is focused on: understanding the impurity trapping and segregation processes that occur during PLM, the filamentary process at high impurity concentrations, improving the understanding to enable optimization of the optically active Au concentration (and other suitable impurities) in Si, and subsequently fabricating an optimized IR photodetector. The ANU will focus on: optimizing the ion implantation conditions and characterizing the material quality, soluble Au concentration and optical absorption before and after PLM using high resolution Rutherford backscattering (RBS), transmission electron microscopy (TEM), Raman spectroscopy and optical measurements; ARDEC will undertake and optimize the PLM processing; and UDayton will fabricate and characterize the photodetector devices. Along with other collaborators at Harvard, Albany, Illinois and Ottawa that bring further characterization and modelling/theoretical expertise to the project, ANU will attempt a full understanding of the
PLM/solidification/segregation processes and the intriguing filamentary behaviour in Si. This project will open up opportunities for exploiting hyper-doping with a range of optically active impurities in Si.
The duration of this Research and Development is 12 months with a 12-month option.
1.2. DELIVERABLES.
1.2.1. First Deliverable (Basic Period) - Project Proposal.
Prior to commencement of work, the contractor shall submit ITC-PAC a Project Proposal which is to measure the progress of the Project, for ITC-PAC’s acceptance.
Project Proposal shall include, at a minimum, the following information:
Project title Investigators
- Name
- Position title
- Organization name
- Address
- Telephone number
- Fax number
- Email address
Concise summary Abstract Objectives Relevance to DoD Background Summary of project plan, expected project result and expected project benefit Project duration Budget details (materials and supply, travel, etc.)
References
1.2.2. Second Deliverable (Basic Period) – Interim Report.
The contractor shall submit an interim report detailing the progress of the completed segments of the project to ITC-PAC at the end of the 6-month stage after commencement of work.
Interim Report shall include, at a minimum, the following information:
Status of project plan.
Progress made in the first 6 months.
Projected progress to be made in the next 6 months.
1.2.3. Third Deliverables (Basic Period)
1.2.3.1. Final Report of Basic Period
The contractor shall submit the Final Report of Basic Period to ITC-PAC with all the results, problems and/or discoveries encountered during the project phases within 30 days after the Basic Period ends.
The Final Report of Basic Period shall include, at a minimum, the following information;
- Name
- Position title
- Organization name
- Address
- Telephone number
- Fax number
- Email address
Summary (or Abstract) of the Project Introduction (or Background) Experiment Result & Discussion Conclusion Acknowledgement Reference
1.2.3.2. Financial Report of Basic Period
Together with the Final Report of Basic Period, the contractor shall deliver the Financial Report of this Project to ITC-PAC.
The Financial Report of Basic Period shall include the cost spent for the Project in the following category:
Labor Cost, Overhead, and Direct Cost (Equipment, Travel, Material & Supply, Publication & Report, Computer Service).
1.2.4. Fourth Deliverables (Option 1 Period) – Project Proposal
Before the Option 1 Period starts, the contractor shall submit ITC-PAC a Project Proposal for Option 1 Period which is to measure the progress of the Project, for ITC-PAC’s acceptance.
Project Proposal shall include, at a minimum, the following information:
- Name
- Position title
- Organization name
- Address
- Telephone number
- Fax number
- Email address
Concise summary Abstract Objectives Relevance to DoD Background Summary of project plan, expected project result and expected project benefit Project duration Budget details (materials and supply, travel, etc.)
References
1.2.5. Fifth Deliverable (Option 1 Period) – Interim Report
The contractor shall submit an interim report detailing the progress of the completed segments of the project to ITC-PAC at the end of the 6-month stage after commencement of Option 1 Period.
Interim Report shall include, at a minimum, the following information:
Status of project plan.
Progress made in the first 6 months.
Projected progress to be made in the next 6 months.
1.2.6. Sixth Deliverables (Option 1 Period)
1.2.6.1. Final Report
The contractor shall submit the Final Report to ITC-PAC with all the results, problems and/or discoveries encountered during the project phases within 30 days after the performance period ends.
The Final Report shall include, at a minimum, the following information;
- Name
- Position title
- Organization name
- Address
- Telephone number
- Fax number
- Email address
Summary (or Abstract) of the Project Introduction (or Background) Experiment Result & Discussion Conclusion Acknowledgement Reference
1.2.6.2. Financial Report
Together with the Final Report, the contractor shall deliver the Financial Report of this Project to
ITC-PAC.
The Financial Report shall include the cost spent for the Project in the following category:
Labor Cost, Overhead, and Direct Cost (Equipment, Travel, Material & Supply, Publication & Report, Computer Service).
1.3. PAYMENTS.
1.3.1. First Payment (Basic Period).
After ITC-PAC’s acceptance of a Project Proposal mentioned above, the contractor shall submit the first invoice to ITC-PAC. The first payment will be made upon ITC-PAC’s certification of the invoice.
1.3.2. Second Payment (Basic Period).
After ITC-PAC’s acceptance of an interim report mentioned above, the contractor shall submit the second invoice to ITC-PAC. The second payment will be made upon ITC-PAC’s certification of the invoice.
1.3.3. Third Payment (Basic Period).
After ITC-PAC’s acceptance of the Third Deliverables mentioned above, the contractor shall submit the third invoice to ITC-PAC. The third payment will be made upon ITC-PAC’s certification of the invoice.
1.3.4. Fourth Payment (Option 1 Period).
After ITC-PAC’s acceptance of the Project Proposal for Option 1 Period mentioned above (Fourth Deliverable), the contractor shall submit the fourth invoice to ITC-PAC. The fourth payment will be made upon ITC-PAC’s certification of the invoice.
1.3.5. Fifth Payment (Option 1 Period).
After ITC-PAC’s acceptance of an interim report mentioned above (Fifth Deliverable), the contractor shall submit the fifth invoice to ITC-PAC. The fifth payment will be made upon ITC- PAC’s certification of the invoice.
1.3.6. Sixth Payment (Option 1 Period).
After ITC-PAC’s acceptance of the Sixth Deliverables mentioned above, the contractor shall submit the sixth invoice to ITC-PAC. The sixth payment will be made upon ITC-PAC’s certification of the invoice.
2. GOVERNMENT FURNISHED PROPERTY. No government furnished property shall be provided nor used in this project.
3. GENERAL INFORMATION.
3.1. Contractor Employees. Personnel shall meet or exceed the following requirement:
3.1.1. Contractor shall not hire employees of the United States Government and/or employees otherwise under contract for service to the United States Government if employing such persons would create a conflict of interest, or appearance of a conflict of interest as determined by the contractor. Contractor shall not employ any person who is an employee of DoD, unless such person seeks and receives approval according to DODR 5500.7, Standards of Conduct.
File details come from the government source that posted it. Updated .