Solt_FBO_PWS_-_YS_69_Portable_Latrines_19_Oct_15.pdf
PDF 224 KB Posted
- Solicitation number
- FA5209-16-T-0013
About this file
PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16-T-0013_Latrine_YS69.pdf | ||
| 16T0013_Notice_to_offeror.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 RFQ No. FA5209-16-T-0013
DEPARTMENT OF THE ARMY
UNITED STATES ARMY JAPAN AND 1
st
CORPS (FWD)
G-3 EXERCSES
ATTN: APAJ-GC-TE
APO AP 96343-5005
PERFORMANCE-BASED WORK STATEMENT
TO PROVIDE
RENTAL OF PORTABLE LATRINES
& SEWAGE REMOVAL SERVICES
IN SUPPORT OF YAMA SAKURA 69
Camp Itami, Hyogo, Japan
19 Oct 2015
Army Exercise, YS PWS – Portable Latrine
Table of Contents
SECTION 1 Description of Services / General Information Page 3 - 8
SECTION 2 Government Furnished Property and/or Services Page 9
SECTION 3 Appendices Page 9 - 13
SECTION 1
DESCRIPTION OF SERVICES/GENERAL INFORMATION
1. DESCRIPTION OF SERVICES. The Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary to support the U.S. Army/Japanese Ground Self Defense Forces (JGSDF)
Bilateral Exercise YAMA SAKURA 69 (YS69) in accordance with this Performance-Based
Work Statement (PWS), the attached appendices and with commercial standards, local standards, Japanese ordinances and Japanese laws. These services shall be performed at the same levels as in the commercial marketplace to the maximum extent possible.
1.1. TYPE OF SERVICES REQUIRED. The Contractor shall perform the following listed services:
(a) The Contractor shall provide Rental of Portable Latrines and Sewage Removal Services as listed in Appendix number one (#1) of this PWS.
(b) The Contractor shall coordinate all aspects of this project with the designated
Government Representative (GR).
1.2. DESCRIPTION OF MATERIALS. The Contractor shall provide all non-consumable supplies needed to perform all aspects of this contract.
1.3. INTERFERENCE WITH GOVERNMENT OPERATIONS. The Contractor shall make every effort to schedule its activities so as not to interfere with U.S. Government operations. In the event the nature of the work may become such interference necessary, the Contractor shall provide the GR with a minimum of five (5) days advance notification of the proposed work.
1.4. GENERAL INFORMATION.
1.4.1. QUALITY CONTROL. The Contractor shall develop and maintain a quality control program to ensure the services are performed in accordance with commonly accepted commercial practices. The Contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective services.
1.4.2. QUALITY ASSURANCE. The Government will evaluate the Contractor’s performance by appointing a GR to monitor performance to ensure services are received in accordance with this PWS. The U.S. Government reserves the right to increase or decrease the frequency of inspections being conducted based on the progress of the Contractor, reported concerns, or perceived issues with the performance of contracted services.
1.4.3. GOVERNMENT REMEDIES. The Contracting Officer (KO) will follow Federal
Acquisition Regulation (FAR) 52.212-4, Contract Terms and Conditions-Commercial Items for
Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
1.4.4. CONTRACTOR PERSONNEL
(a) CONTRACT MANAGER. The Contractor shall provide a contract manager who shall be responsible for all requirements in this PWS. No later than (NLT) five (5) days after contract award, the name of this person and an alternate and or alternates, who shall act for Contractor when manager is absent, shall be designated in writing to KO/GR. The Contractor shall provide telephone numbers of contract manager and alternate(s) for other than normal duty hours.
He/She must be able to read, speak, and write English. Contract manager or alternate(s) shall have full authority to act for Contractor on contract matters relating to daily operation of contract.
(b) EMERGENCY POINT(s) OF CONTACT. The Contractor shall provide a listing of
Point of Contact information (names and telephone numbers) of individuals available twenty-four (24) hours a day to call in the event emergency service is required for any aspect of this contract. The Contractor shall respond to all emergency calls within twelve (12) hours from the time the call is placed.
(c) CONTRACTOR EMPLOYEES. The Contractor personnel shall be easily recognizable as Contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the
Contractor’s company name and the employee’s name. The Contractor shall not employ personnel who have been identified to the Contractor as a potential threat to health, safety, security, general well being or operational mission of the installation or its population.
(d) REMOVAL OF CONTRACTOR’S EMPLOYEES. The Contractor shall utilize only experienced, responsible and capable employees in the performance of this contract. The
KO/GR may require that the Contractor remove from the Government job any of his/her employees who endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of the U.S. Government.
(e) THIRD COUNTRY NATIONALS (TCN). The Security Forces on each installation control access to the installation. Under certain circumstances, Third Country National (TCN) personnel may be denied entry. It is the Contractor’s responsibility to coordinate with Security
Forces at each installation when there is a question about particular circumstances.
(f) U.S. GOVERNMENT OR JAPANESE NATIONAL EMPLOYEES. The Contractor shall not hire employees of the United States Government and/or Master Labor Contract employees in violation of the Procurement Integrity Act. See FAR Section 3.104. Further, the
Contractor shall not employ any Department of Defense employee, either military or civilian, unless such person seeks and receives approval in accordance with Department of Defense
5500.7-R, Joint Ethics Regulation.
(g) MILITARY PERSONNEL. The Contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station (PCS), change in duty hours, or deployment. Military Reservists and National Guard members may be subject to recall to active duty. Abrupt absence of these personnel could adversely affect Contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for non-performance under this contract
(h) ACCOUNTING FOR CONTRACTED SERVICES REQUIREMENT. Due to a requirement at the U.S. Department of the Army (DA) level, all service related contracts are required to report personnel information on all service related contract employees needed to meet contracted service requirements. The requirements mandated by DA are stipulated in the following paragraph.
a. The Officer of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army collection site where the Contractor will report ALL
Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor is required to completely fill in all the information in the format using the following web address: https://contractormanpower.army.pentagon.mil. This required information includes:
i. Contracting Office, Contracting Officer, Contracting Officer’s Technical
Representative
ii. Contract number, including task and delivery order number
iii. Beginning and ending dates covered by reporting period
iv. Contractor’s name, address, phone number, e-mail address , identity of contractor employee entering data
v. Estimated direct labor hours (including subcontractors)
vi. Estimated direct labor dollars paid this reporting period (including subcontractors)
vii. Total payments (including subcontractors)
viii. Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each subcontractor if different)
ix. Estimated data collection cost
x. Organizational title associated with the Unit Identification Code (UIC) for the
Army Requiring Agency (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information)
xi. Locations where contractor and subcontractors perform the work (specified by zip code in the United States and nearest city, county, when in an overseas location, using standardized nomenclature provided on website)
xii. Presence of deployment or contingency contract language
xiii. Number of contractor and subcontractor employees deployed in theater this reporting period (by country)
As part of its submission, the Contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be of performance not https://contractormanpower.army.pentagon.mil/ to exceed twelve (12) months ending thirty (30) September of each government fiscal year and must be reported by thirty-one (31) October of each calendar year. The Contractor may use a direct Mark-up Language (XML) data transfer to the database server or fill in the field on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure web site without the need for separate data entries for each data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.
b. The FSC does not apply to Japanese contractors; Not Applicable (N/A) should be entered into this field.
c. The UIC for United States Army Japan Host Nation section is W6C0AA.
d. Use Camp Itami, Hyogo Japan for the locations where contractor or subcontractor performed the work.
e. No deployment of contingency contract language will be used in the contract; NA should be entered into this field.
f. No contractor of subcontractor employees will be deployed in theater for this contract; N/A should be entered into this field.
1.4.5. INSTALLATION / BASE PASSES. Installation/Base Passes and Controlled Area
Badges for Contractor personnel are issued at no cost to the Contractor. The Contractor shall ensure each employee obtains required pass and identification items for access to Camp Itami, Hyogo, Japan. The Contractor shall return all applicable passes upon termination of employment or completion of this contract. All other government identification for terminated employees shall be returned to the issuing office within 24 hours of termination, and a certificate of receipt shall be obtained. Additionally, all Contractor personnel shall be in compliance with all
Japanese and designated location‘s Motor Vehicle Code requirements pertaining to operation requirements.
1.4.6. PERSONNEL LIST. The Contractor shall provide a complete roster of all personnel
(includes contract manager and alternate contract manager[s] as appropriate) to Contracting
Office NLT five (5) days after contract award. Roster must include name, address and telephone number of employee. The Contractor shall maintain a current listing of employees, providing updates as changes occur. The Contractor MUST Provide all personnel roster at least one (1) week prior to commencement of work to MAJ Miura, Plans & Admin Section, Engineer
Division, Logistics Department, Middle Army, TEL: 072-782-0001, Ext (中部方面総監部
装備部施設課統括班、三浦3佐).
1.4.7. INSTALLATION SAFETY/FIRE REGULATIONS. The Contractor is responsible for job site safety and fire prevention. Standard base procedures will be provided by the KO or the
GR at the job site.
1.4.8. REPORTS OF DAMAGES, DESTRUCTION, INJURY, OR DEATH
(a) The Contractor shall report all incidents of damage or destruction to property, or personal injury or death to any person, arising out of and during the performance of this contract. For the purposes of this clause, the term “property” includes equipment, material, supplies, freight, or property of any type, whether Government owned or not. The term “Contractor” includes the
Contractor, its agents, servants or employees.
(b) The Contractor shall submit these reports to the KO/GR as follows:
(1) A preliminary report shall be made as soon as practicable after the time the incident occurs. Report may be either verbal or written (delivered in person or via facsimile).
(2) A complete written report shall be submitted within ninety-six (96) hours after occurrence of the incident. A copy of this report shall be furnished to the GR.
1.4.9. HAZARDOUS MATERIALS. All hazardous materials must be contained and stored in the appropriate storage containers and/or cabinets. The Contractor shall immediately report spills or releases of hazardous materials to the KO/GR and Contracting Office. The Contractor shall be liable for containment and environmental cleanup of spill or release of such substance.
The Contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. The Contractor shall comply with environmental and hazardous materials storage and handling requirements and maintain current Material Safety Data Sheets (MSDS).
1.4.10. ENVIRONMENTAL AND HAZARDOUS MATERIAL HANDLING. The
Contractor shall comply with municipal environmental laws to protect the health and safety of employees/residents and minimize or eliminate environmental pollution.
1.4.11. DISPOSAL OF MATERIALS: All debris generated from the work shall be removed from the job site and disposed by the Contractor in accordance with the laws of Japan.
1.4.12. RESPONSIBILTY FOR DAMAGES. Any damages caused to U.S.
Government/JGSDF property during the course of performing this contract shall be restored, replaced and/or repaired to its original condition at no additional cost to the U.S. Government.
1.4.13. OFF LIMITS SIGNS. The Contractor shall provide and post “OFF LIMITS” signs in both English and Japanese and post them as appropriate or required.
1.4.14. HOURS OF OPERATION.
(a) AVAILABILITY OF FACILITIES. The facilities will be made available to the
Contractor from 0430-2000 hours, Sunday through Saturday, seven days per week to include any
U.S. or Japanese holidays. Access to the facilities outside of these hours may be authorized by the KO/GR with prior coordination by the Contractor.
(b) ON-SITE HOURS. The hours of operation for performing these services are identified in Appendix number one (#1). In the event the KO/GR requests a temporary shutdown of the jobsite, the Contractor will be notified verbally and in writing. Any U.S. Government caused delays resulting in a temporary shutdown may require an adjustment to the contract and will be coordinated through the Contracting Office.
(c) U.S. LEGAL HOLIDAYS. Recognized US legal holidays are listed below. Holiday falling on a Saturday may be observed on the preceding Friday. Holidays falling on a Sunday may be observed on the following Monday.
DATE HOLIDAY
1st January New Year’s Day
3rd
Monday in January Martin Luther King Day
3rd Monday in February President’s Day
Last Monday in May Memorial Day
4th July Independence Day
1st Monday in September Labor Day
2nd Monday in October Columbus Day
12th November Veteran’s Day
4th Thursday in November Thanksgiving Day
25th December Christmas Day
1.4.15. CONSERVATION OF UTILITIES. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that prevent waste of utilities.
1.4.16. GOVERNMENT REPRESENTATIVE (GR). The Contractor shall coordinate all aspects of this project with the GR. Completed work shall be subject to inspection and acceptance by GR. The GR shall NOT direct or redirect any Contractor action(s). This can only be done by the KO.
1.4.17. CONTRACTING OFFICER AUTHORITY. Only the KO has authority to enter into, administer, terminate or modify the terms and conditions herein. Any changes made by persons other than the KO will be considered an Unauthorized Commitment and subject to Ratification
Actions in accordance with the Federal Acquisition Regulation part 1.602-3.
SECTION 2
GOVERNMENT FURNISHED PROPERTY AND SERVICES
2. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
2.1. UTILITIES. Water, electricity, and sewage as determined necessary to fulfill the needs of this contract will be provided to the Contractor without cost.
2.2. SUPPLIES. The U.S. Government will provide consumable supplies to the Contractor for use on this contract. These items include toilet paper, paper hand towels, cleaning solvent
(Simple Green or like cleaning solvent) and bleach.
2.3. SECURITY FORCES AND FIRE PROTECTION. Upon request for assistance, the following units will provide services on base as necessary:
(a) Base Security Forces: Telephone 110
(b) Base Fire Department: Telephone 119
(c) Base Emergency: Telephone 119
Phone numbers to be verified at exercise site.
SECTION 3
APPENDICES
3. APPENDICES
1. Rental of Portable Latrines and Sewage Removal Services
2. Portable Latrines Location Map
APPENDIX No. 1
RENTAL OF PORTABLE LATRINES & SEWAGE REMOVAL SERVICES
Period of Performance: 20 Nov 2015 – 13 Dec 2015
Quantity and Type of portable latrines required under this contract: 14 Sets (western style latrine with/and urinal stand) with lighting and 6 EA (western style latrine for Female) with lighting.
Scope of Required Services: The Contractor shall deliver 14 sets of western style portable latrines with/and urinal stands with lighting and 6 ea of western style latrines with lighting to
Camp Itami, Hyogo, Japan at 10:00 hours on 20 Nov 2015. The Contractor shall remove portable latrines on 13 Dec 2015, beginning 10:00 hours. Prior to delivery of portable latrines, the Contractor must coordinate with the designated GR to receive instruction for snow removal, location, placement, and possible relocation of portable latrines. The Government reserves the right to request relocation of portable latrines up to one (1) time during the contract period without additional costs to the Government.
a. The Contractor shall clean and disinfect the interior of the portable latrines and ensure mud, dirt, waste, and trash is removed daily, not later than 10:00 hours including weekends and Japanese holiday.
b. The Contractor shall provide service of removal of non-water borne sewage to comply with Japanese and local regulations. The Contractor shall empty the sewage out of the portable latrines every time they perform sewage removal service. The latrines should not overflow at any time and shall be kept in a sanitary condition. The sewage removal service is not required on Sunday unless emergency sewage removal service is needed.
c. The Contractor shall replace the toilet paper as necessary (government will provide supplies).
d. The Contractor shall provide small trash can in each latrine and empty them every day.
e. The Contractor shall provide wireless auto-motion censored light (battery type or equivalent) inside of the each portable latrine.
f. The Contractor shall ensure that non-water borne sewage does not freeze.
g. The Contractor shall provide emergency contact numbers and points of contact for emergency cleaning and sewage removal.
h. The Contractor shall conduct a final cleaning of the portable latrines on 13 Dec 2015.
Delivery/ Pick-up Information:
Type of Portable Latrines Qty Delivery Date
& Time
Pick-up Date
& Time
Location
Western Style with/and urinal stand
7 Set 20 Nov 13
1000 hours
13 Dec 13
1000 hours
West side of CP
(グラウンド西側)
Western Style with/and urinal stand
7 Set 20 Nov 13
1000 hours
13 Dec 13
1000 hours
East side of CP
(グラウンド東側)
Western Style 3 EA 20 Nov 13
1000 hours
13 Dec 13
1000 hours
West side of CP
(グラウンド西側)
Western Style 3 EA 20 Nov 13
1000 hours
13 Dec 13
1000 hours
East side of CP
(グラウンド東側)
Special Instructions: All Portable latrines shall be placed 100 ft away from the US Forces/
JGSDF sleeping tents. The Contractor must coordinate with Camp Itami Gyomu-tai and approved local sewage disposal facilities prior to performance start date. The local sewage disposal facilities will provide the invoice to the Contractor based on the actual amount of sewage removal after the completion. The Contractor must immediately settle the account.
GOVERNMENT REPRESENTATIVE (GR): The primary authorized U.S. Government
Representative for this contract is Mr. Kengo Watanabe, USARJ G3, Exercise Logistics Planner at (DSN) 263-3963 or 080-5199-4221. The authorized KO for this contract is Mr. Masaki Sato, th
Contracting Squadron, Yokota Air Base, Tokyo Japan at 042-551-6120 or DSN 225-7544.
File details come from the government source that posted it. Updated .