06._12-1112 _Contract_Drawings.pdf
PDF 1 MB Posted
- Attached to
- Project No. : ZNRE 12-1112, Paint Exterior Finish, B689, Main Gym, Yokota Air Base Japan
- Solicitation number
- FA5209-15-T-0112
About this file
06. Contract Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 02.DD1707.pdf | ||
| 05._Bldg._689_LBP_Result.pdf | ||
| 03._SF18_FA520915T0112.pdf | ||
| 06._12-1112 _Contract_Drawings.pdf | ||
| 01.Government_Policy_Ltr-Maj_Kapise.pdf | ||
| 04._12-1112_SPEC.pdf | ||
| 08._OF-17.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
374 TH AIRLIFT WING
374 TH CIVIL ENGINEER SQUADRON
YOKOTA AIR BASE JAPAN
(1971)
6' 00" W
APPROX. MAG. DEC.
NORTH
TRUE
SCALE IN FEET
TITLE
SITE PLAN
SHE. NO
DRAWING INDEX
A-1
REF. NO
T-1
PROJECT NO. DRAWING NO. 8776
PAINT EXTERIOR BLDG689, MAIN GYM
ZNRE 12-1112
FIRST AND SECOND FLOOR PLAN.
3 A-2 ELEVATION PLANS.
SHEET OF
DATEREV BYDESCRIPTION
PACIFIC AIR FORCES HEADQUARTERS FIFTH AIR FORCE
374th AIRLIFT WING BASE CIVIL ENGINEER
YOKOTA AIR BASE, JAPAN
DEPARTMENT OF THE AIR FORCE
B
89'-3"
27200.00
12650.00
COURT #1 BELOW
RACQUETBALL
COURT #2 BELOW
RACQUETBALL
OFFICE
TEST ROOM BELOW
RELAXATION &
RELAXATION &
ELECTRICAL/
TELECOM
JANITOR
F'
A'
F'
A'
DN
DN
COURT BELOW
BASKETBALL
B
B
B
BB
B
A2
A4
A4
B
B
B
22'-10 1/2"22'-10 1/2 "22'-10 1/2 "23'-1 1/2 "
BASKETBALL
COURT BELOW
COURT #4 BELOW
RACQUETBALL
COURT #3 BELOW
RACQUETBALL
AEROBICS/ YOGA
STRETCHING/ WARM-UP
ADA TOILET
107A
ROOM
STEAM GENERATOR
122A
RACQUETBALL
COURT #4
RACQUETBALL
COURT #3
WOMEN’S
TOILET
WOMEN’S
STEAM ROOM
WOMEN’S
SAUNA ROOM
LOBBY
FRONT
COUNTER
JUICE BAR/
PRO SHOP
CONFERENCE
ROOM
MEN'S
TOILET
EXISTING
GYMNASIUM
NON-SUPERVISED
CHILD PLAY AREA
BOY’S
TOILET
GIRL’S
TOILET
MEN’S
LOCKER TOILET
WEST
CORRIDOR
MEN’S
DV TOILET
SHOWER
MEN’S
DV SHOWER
MEN’S
SAUNA
MEN’S
STEAM
MEN’S
LOCKER ROOM
STORAGE
MEN’S
DV LOCKER
STORAGE
ROOM
WOMEN’S
DV LOCKER
WOMEN’S
LOCKER ROOM
WOMEN’S
SHOWER
WOMEN’S
TOILET ROOM
WOMEN’S
DV TOILET
WOMEN’S
DV SHOWER
CORRIDOR
STORAGE
EAST
B
54321
7 8 10 6'6 9
41'-6"
34'-5 1/2 "
30'-2"
170.00
6 1/2 "
64'-7 1/2 "
6'-3"
1900.00 12650.0010500.00
19700.00
9200.00
27963.00
91'-9 "
7047.00 6972.00 6972.00 6972.00
E MECHANICAL
ROOM
LAUNDRY/
ISSUE ROOM
VESTIBULE
G
FIRST FLOOR PLAN
1:200
SECOND FLOOR PLAN
1:200
B
B
B
B
B
F
E
D
C
B
A
G
F
E
D
C
B
A
H
BELOW
SPINNING ROOM
OFFICE
MANAGER’S
RACQUETBALL
COURT #2
SPINNING
ROOM
EXISTING
OFFICE
RACQUETBALL
COURT #1
TEST ROOM
H
41'-6"
SHEET OF
DATEREV BYDESCRIPTION
PACIFIC AIR FORCES HEADQUARTERS FIFTH AIR FORCE
374th AIRLIFT WING BASE CIVIL ENGINEER
M
M
SEE PARTIAL NORTH ELEVATIONSEE PARTIAL NORTH ELEVATIONSEE PARTIAL NORTH ELEVATION
M
M
NEW
LBP= LEAD BASE PAINT AREA
LEGEND:
LBP, ALL METAL COLUMN/BEAM (TYP)LBP, ALL METAL COLUMN/BEAM (TYP)
LBP, HAND RAIL LBP, METAL DOOR
LBP, METAL DOOR
LBP, ALL METAL COLUMN/BEAM (TYP)
LBP, METAL BRACE (TYP)
LBP, ALL METAL COLUMN/BEAM (TYP)
LBP, METAL BRACE
LBP, METAL BRACE
LBP, ALL METAL COLUMN/BEAM (TYP)
LBP, METAL BRACE
LBP, ALL METAL COLUMN/BEAM (TYP)
SHEET OF
DATEREV BYDESCRIPTION
PACIFIC AIR FORCES HEADQUARTERS FIFTH AIR FORCE
374th AIRLIFT WING BASE CIVIL ENGINEER
File details come from the government source that posted it. Updated .