3.Exhibit-PriceList.pdf

PDF 53 KB Posted

Attached to
Household Goods Packing and Crating Services in Kanagawa (A Bridge Sole Source BPA)
Solicitation number
FA520915T0104
Issued by

About this file

Exhibit-Price List

View the file

Other files

File Type Posted
J A_BridgeBPA15T0104_Redacted.pdf PDF
SF30_FA520915T0104-0001.pdf PDF
3.Exhibit-PriceList-rev.pdf PDF
5.Atch2_RefList.pdf PDF
4.Atch1_PWS.pdf PDF
2.SF1449_FA520915T0104.pdf PDF
0.Goverment_Policy_Ltr.pdf PDF
1.NTO.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibits to Solicitation No. FA5209-15-T-0104

(NCWT: Net hundredweight)

EXHIBIT: PRICE LIST

I. ESTIMATED QUANTITIES

The quantities shown by area of performance for each item in this Solicitation are the Government’s estimates of requirements, which may be ordered during the period of the contract.

The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Offerors must complete the “Offeror’s Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to do so will render the bid non responsive.

Government's Government's Offeror's

Estimated Maximum Minimum Acceptable Guaranteed Daily

Base Daily Requirement Daily Capability Capability (Unit: NCWT) (Unit: NCWT) (Unit: NCWT)

ZAMA

ZAMA 260 135

YOKOSUKA 1200 700

II. CONTRACTOR'S FACILITY

The Contractor's facility to be used in the performance of this contract for and in accordance with paragraph 10, Facilities, Part I of PWS shall be as identified below. The Contractor's facility shall have the size of storing a minimum of 50 containers specified at Item A010 and the corresponding items for options.

Base Location of the warehouse(s)

Approximate square footage (sq-ft) in each warehouse available for assembling, packing, and storage under this contract

III. CONTRACT AREAS OF PERFORMANCE

(a) The Government will consider all areas of performance described in paragraph (b) as including the Contractor's facility, regardless of geographical location.

(b) The Contractor shall perform services within the following defined areas of performance, which include terminals identified therein: Area within a radius of (XX) kilometers from the main gate of the Government installation (see the list below.)

Base Area within a radius of (XX) km From Drayage Beyond the Contract Areas of

Performance (Not-To-Exceed (NTE) XX km)

ZAMA 35 km Main Gate NTE 55 km

YOKOSUKA

100 km

Main Gate NTE 600 km (include on-base ATSUGI)

PERFORMANCE PERIOD (From 1 JUL 2015 to 31 DEC 2015 )

Item A002. Outbound (HHGs From Non-Temporary Storage): No requirement.

IV. SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE I

OUTBOUND SERVICES (Items A001 through A014)

Item A001. Complete Service - Outbound (HHG): Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container ASTM-D4169-01, SDDC Pamphlet 55-12) at member's/employee's residence, or at Government-furnished facility when ordered by the ordering officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on line-haul carrier’s equipment at the Government-furnished or contractor-furnished facility. When containers will not accommodate all articles of any one lot, loose articled must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize and other shipments must be paid for under Item A003.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

At member/employee Residence: Container, ASTM-D4169-01, or SDDC Pamphlet 55-12

AB.

40 116

At Government-furnished facility or Contractor’s facility: Container, ASTM- D4169-01, or SDDC Pamphlet 55-12

AA.

720 5,400

Estimated Unit Price

Total

Annual Annual

Quantity Quantity (Unit: NCWT) (Unit: NCWT)

Item A003. Complete Service-Outbound (HHG-Overflow Articles and HHGs Shipments requiring other than ASTM- D4169-01 or SDDC Pamphlet 55-12): Service must be the same as Item A001 or Item A002 except that the loose articles are drayed to Government-furnished or contractor-furnished facility when ordered by the ordering officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in ASTM-D4169-01 or SDDC Pamphlet 55-12. Overflow containers are of a lesser size than specified in ASTM- D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in ASTM-D4169-01 or SDDC Pam 55-12. One or more of these containers may be required per shipment.

AA.

No requirement 50Government-Furnished Containers:

Overseas Pack: Overflow Articles

Annual Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

Item

ZAMA YOKOSUKA

Estimated Unit Price

Total

Estimated Unit Price

Total

AD.

No requirement No requirementGovernment-Furnished Containers:

Domestic Pack: Overflow Articles

AE.

No requirement No requirementGovernment-Furnished Containers:

Domestic Pack: Oversize Articles

AC.

No requirement 24Government-Furnished Containers:

Overseas Pack: Other Shipments

AB.

No requirement 67Government-Furnished Containers:

Overseas Pack: Oversize Articles

(to be drayed to DLA

Yokosuka)

(at member/ employee's residence)

2 2 (to be drayed to Camp Zama warehouse)

AF.

No requirement No requirementGovernment-Furnished Containers:

Domestic Pack: Other Shipments

AG.

Contractor-Furnished Containers:

Overseas Pack: Overflow Articles

6 80

(to DDYJ) (at member/ employee’s)

2 2

(at Gov’t-furnished facility)

AH.

Contractor-Furnished Containers:

Overseas Pack: Oversize Articles

4 140

(to Zama) (at Gov’t’s)

AK.

No requirement No requirementContractor-Furnished Containers:

Domestic Pack: Overflow Articles

AL.

No requirement No requirementContractor-Furnished Containers:

Domestic Pack: Oversize Articles

(to DDYJ) (at member/ employee’s)

1 5 (to Zama)

AJ.

Contractor-Furnished Containers:

Overseas Pack: Other Shipments

7 48

(at Gov’t’s)

AM.

No requirement No requirementContractor-Furnished Containers:

Domestic Pack: Other Shipments

AA.

No requirement 1Government-Furnished Containers:

Drayage Included

Total

Estimated Unit Price

Total

Annual Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

Item A004. Complete Service - Outbound (Unaccompanied Baggage (UB)): Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the line-haul carrier’s equipment. Service must be performed at member's/employee’s residence. (Service may be performed at Government-furnished facility or contractor-furnished facility when ordered by the Ordering Officer.)

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Contractor-Furnished Containers:

Drayage Included

AD.

No requirement 140Contractor-Furnished Containers:

Drayage Not Included

AC.

12 88

AB.

No requirement 1Government-Furnished Containers:

Drayage Not Included

AE.

No requirement 2

Shipboard Pack outs

Annual Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

AE. Shipboard Pack outs: When outbound services under items A001, A003 and A004 are ordered for performance at the member’s/employee’s residence located on an ocean vessel, the contractor must pick up goods outside fence perimeter. (Due to contractor’s personnel liability and safety, and for security reasons.)

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Item A005. Complete Service-Outbound (UB from Non-temporary Storage): No requirement.

Item A006. Outbound Service-UB Packed By Member/Employee: No requirement.

Item A007. Outbound Service-UB Packed By Member/Employee-Consolidated Shipments/Government Facility: No requirement.

Item A008. Expensive and Valuable Items: No requirement.

Item A009. Storage: Storage of containerized articles must be furnished when ordered by the ordering officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt or notification of completion of containerization service. Storage charges apply for 30-days period or fraction thereof. For Date of release from storage must not be considered in computation of storage charges. Charges are based on actual net weight of shipment (HHG or UB).

Storage 60 No requirement

Item A010. Containers: Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading.

*When a specific container from the SDDC Pam. 55-12 is ordered, the order will indicate the appropriate SDDC approval number.

Total

Estimated Unit Price

Total

Annual Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Annual Annual Quantity Quantity

AA.

No requirement No requirement

Container (ASTM-D4169-01)

(ea: each / cu ft: cubic feet)

Item

ZAMA YOKOSUKA

Estimated Unit

Price

Total

Estimated Unit Price

Total

Item A011. Remarking, Coopering and Assembly/Disassembly Service:

AA. Remarking of Shipments for Re-consignment: Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for re-consignment, and loading on the hauling carrier’s vehicle.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Crate

(ASTM-D6039/D6039M-02)

40 400

Container (SDDC Pamphlet 55-12)* 100 260 AC. (Unit: cu ft or fraction thereof)

(Unit: cu ft or fraction thereof)

AB. (Unit: ea) (Unit: ea)

Remarking

AB. Coopering: Services must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nail and bands shall be accomplished at no expense to the Government.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

AA.

6 12

Total

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

AB.

No requirement 1

Coopering

Unit Price

Total

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

AC & AD. Assembly/Disassembly of Government-Owned Containers: Contractor will assemble Government-owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

AD.

No requirement 1

Disassembly

AC.

No requirement 1

Assembly

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

Contract Area of Performance within a radius of 35 km within a radius of 100 km Not-to-exceed ~ a radius of 55 km a radius of 600 km

Annual Annual Quantity Quantity (Unit: per loaded 10km) (Unit: per loaded 10km)

Item A012. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Item A013. Attempted Pickup: When the initial attempt to pickup a shipment at the member's/employee's residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after Contractor’s notification, the ordering officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member's/employee at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup at the residence.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

HHG

AB.

2 1

UB

AA.

2 1

HHG

AB.

1 1

UB

AA.

1 1

Annual Annual Quantity Quantity

(Unit:

ea shpmt)

(Unit:

ea shpmt)

Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).

Unit Price

Total

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

Item A014. Additional Services: The Contractor must provide additional services not included above, but required for satisfactory completion of the services ordered under this contract.

AA & AB. Moving and Placing Pianos or Organs: When moving and placing pianos or organs are involved for outbound services under Item A001, the Contractor shall be paid the unit price listed hereunder in addition to the rate of Item A001.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

AC. When the piano or organ is to be moved from the second floor or above, the following rate shall be added to the rate under Item A014AA or A014AB for each floor covered. However, this additional rate does not apply when a building elevator is available.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Grand Piano

AB.

2 2 Upright Piano or Organ

AA.

1 1

Estimated Unit Price

Total

Annual Annual Quantity Quantity (Unit: per service)

(Unit: per service)

Second floor or above

AD. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.

Note: The contractor must bill the Government for the requested/required third party services as a separate charge on the invoice supported by two (2) copies of the paid receipt/invoice from the third party.

(*TBD: To Be Determined)

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

AC

1 1

Unit Price

Total

Annual Annual Quantity Quantity (Unit: per pick-up)

(Unit: per pick-up)

Indefinite Third Party

AE & AF. Additional Pickup: In conjunction with Item A001, A003, and A004, add a rate for one (1) additional pickup point for one (1) shipment within the performance area.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

AD.

1 *TBD Indefinite 1 TBD

HHG

AF.

1 1

UB

AE.

1 1

b. c.

AG. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is arranged by the contractor with the authorization of the ordering officer.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Indefinite Crane

AH. Overtime: Rates at Item A001, A002 and A003 shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART, I para. A.3.b.)

Item

ZAMA YOKOSUKA

Estimated

Rate

Total

Estimated

AG.

2 TBD Indefinite 1 TBD

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

5,934 0.13%

AH.

No requirement a. 8 %

Rate

Total

Annual Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

ESTIMATED TOTAL OF SCHEDULE I (OUTBOUND)

Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).

AREA TOTAL

ZAMA

YOKOSUKA

d.

Overtime

(a) Estimated Annual Quantity 20 = (c) 0.13% of (b) Total Estimated Quantity of A001, A002 and A003

(d) Extended Amount for Overtime = Total Extended Amount for "A001, A002 and A003" x Estimated Annual Qty (0.13%) x Rate (%)

RECAPITULATION SCHEDULE I

SCHEDULE II

INBOUND SERVICES (Items A015 through A030)

Item A015. Complete Service - Inbound (HHGs): Service must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers to government-furnished or contractor-furnished facility and return, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, drayage to member's/employee's residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, un-servicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates and debris from member's/employee's residence and drayage of empty containers to Government facility or Contractor’s facility.

Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

Complete Service – Inbound (HHGs) 448 3,240

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Annual

Annual Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

Item A020. Complete Service - Inbound (UB): Service must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers to Government-furnished or contractor-furnished facility, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, drayage of UB containers to member's/employee's residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Item A016. Complete Service - Inbound (HHG): No requirement.

Item A017. Complete Service - Inbound (HHG): No requirement.

Item A018. Inbound Service-Contractor Facility (HHG): No requirement.

Item A019. Complete Service – Expensive and Valuable Items: No requirement.

Item A021. Complete Service - Inbound (Unaccompanied Baggage): No requirement.

Item A022. Inbound Service – Contractor Facility (Unaccompanied Baggage): No requirement.

Item A023. Storage: Storage of containerized articles must be furnished when ordered by the ordering officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt or notification of arrival of shipment. Storage charges apply for 30-days period or fraction thereof. Date of release from storage must not be considered in computation of storage charges. Charges are based on actual net weight of shipment (HHG or UB).

Complete Service – Inbound (UB)

25 100

Estimated Unit Price

Total

Annual Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

AA. Remarking of Shipment for Re-consignment: Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to Government-furnished or contractor-furnished facility, unloading from the delivering carrier’s vehicle, handling into Government-furnished or contractor-furnished facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for re-consignment loading on the hauling carrier’s vehicle.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Storage 20 No requirement

Item A024. Remarking, Coopering, and Assembly/Disassembly Service:

AB.

No requirement 1

Coopering

Unit Price

Total

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

Remarking

AB. Coopering: Services must consist of repair of containers not to exceed 30% of total area of shipping container or cost of repairs will not exceed 50% of the container replacement cost. Minor repair, such as replacement of bolts, nail and bands shall be accomplished at no expense to the Government.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

AA.

6 1

AC.

No requirement 2

Assembly

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

AC & AD. Assembly/Disassembly of Government-Owned Containers: Contractor will assemble Government-owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

AD.

No requirement 2

Disassembly

Annual Annual Quantity Quantity

(Unit:

ea shpmt)

(Unit:

ea shpmt)

Item A025. Attempted Delivery: When the initial attempt to deliver a shipment at the member's/employee's residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after Contractor’s notification, the ordering officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the Contractor left a notice of attempted delivery at the residence.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Item A026. Reweighing: Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

HHG

AB.

1 1

UB

AA.

1 1

HHG

AB.

2 1

UB

AA.

1 1

Annual Annual Quantity Quantity

(Unit:

ea shpmt)

(Unit:

ea shpmt)

Contract Area of Performance within a radius of 35 km within a radius of 100 km Not-to-exceed ~ a radius of 55 km a radius of 600 km

Annual Annual Quantity Quantity (Unit: per loaded 10km) (Unit: per loaded 10km)

Item A027. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

HHG

AB.

2 1

UB

AA.

2 1

Annual Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

Item A028. Partial Withdrawal: Service must be the same as Item A015 or A020, except a partial removal of the items from the outer container will be performed at the Government-furnished or contractor-furnished facility. Articles not removed from the shipment will remain at the Government-furnished or contractor-furnished facility.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

AC.

No requirement No requirement

UB Drayage Included

AD.

No requirement No requirement UB Drayage Not Included

HHG Drayage Included

AB.

No requirement 10 HHG Drayage Not Included

AA.

1 4

Unit Price

Total

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).

Item A029. Additional Services: The Contractor must provide additional services not included above, but required for satisfactory completion of the services ordered under this contract.

AA & AB. Moving and Placing Pianos or Organs: When moving and placing pianos or organs are involved for inbound services under Item A015, the Contractor shall be paid the unit price listed hereunder in addition to the rate of Item A015.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

AC. When the piano or organ is to be moved on the second floor or above, the following rate shall be added to the rate under Item A029AA or A029AB for each floor covered. However, this additional rate does not apply when a building elevator is available.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Grand Piano

AB.

1 2 Upright Piano or Organ

AA.

1 1

Second floor or above

AC.

1 1

Unit Price

Total

Annual Annual Quantity Quantity (Unit: per service)

(Unit: per service)

AD. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.

Note: The contractor must bill the Government for the requested/required third party services as a separate charge on the invoice supported by two (2) copies of the paid receipt/invoice from the third party.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

Unit Price

Total

Annual Annual Quantity Quantity (Unit: per pick-up)

(Unit: per pick-up)

Indefinite Third Party

AE & AF. Additional Delivery: In conjunction with Item A015, add a rate for one (1) additional delivery point for one (1) shipment within the performance area.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

AD.

1 TBD Indefinite 1 TBD

AG. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is arranged by the contractor with the authorization of the ordering officer.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

HHG

AF.

1 1

UB

AE.

2 1

Indefinite Crane

AH. Customs Clearance: The Contractor will clear customs when shipments become frustrated.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

AG.

1 TBD Indefinite 1 TBD

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

Customs Clearance

AH.

2 1

Unit Price

Total

Annual Annual Quantity Quantity

(Unit:

ea shpmt)

(Unit:

ea shpmt)

b. c.

a.

AJ. Overtime: Rates at Item A015 and A020 shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART I, para. A.3.b.)

Item

ZAMA YOKOSUKA

Estimated

Rate

Total

Estimated

3,340 0.12%

AJ.

No requirement 4 % d.

Rate

Total

Annual Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

ESTIMATED TOTAL OF SCHEDULE II (INBOUND)

Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).

AREA TOTAL

ZAMA

YOKOSUKA

Overtime

(a) Estimated Annual Quantity 10 = (c) 0.12% of (b) Total Estimated Quantity of A015 and A020

(d) Extended Amount for Overtime = Total Extended Amount for "A015 and A020" x Estimated Annual Qty (0.12%) x Rate (%)

Item A030. Reserved.

RECAPITULATION SCHEDULE II

SCHEDULE III

INTRA-CITY AND INTRA-AREA MOVES (Items A031 through A034)

Item A031. Complete Service for Intra-City and Intra-Area Moves: Service must include a premove survey, servicing of appliances, packaging and packing at member's/employee's residence to protect household goods properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in member's/employee’s new residence as directed by member/employee or member's/employee’s designated representative and removal of all empty containers and materials from residence.

Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

Complete Service – Intra- City and Intra-Area Moves

1,600 4,600

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Annual

Unit Price

Total

Annual Annual Quantity Quantity (Unit: per pick-up)

(Unit: per pick-up)

Item A032. Attempted Pickup or Delivery: When the initial attempt to pickup or deliver a shipment at the member's/employee’s residence is unsuccessful, charges apply provided the Contractor notified the ordering officer via telephone and provided that after Contractor’s notification, the ordering officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the Contractor left a notice of attempted pickup or delivery at the residence.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

Annual Annual Quantity Quantity (Unit: per loaded 10km) (Unit: per loaded 10km)

Item A033. Drayage Beyond the Contract Area of Performance: Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed XX kilometers (Refer to table below). Kilometers must be computed on the shortest highway distance commencing with the applicable point of pick-up to the outer boundary of the contract area of performance. Note: Contract area of performance: Refer to table below.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Attempted Pickup

AB.

1 1 Attempted Delivery

AA.

1 1

Drayage Beyond the Contract Area of Performance

Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).

Item A034. Additional Services: The Contractor must provide additional services not included above, but required for satisfactory completion of the services ordered under this contract.

A033.

4 1

Contract Area of Performance within a radius of 35 km within a radius of 100 km Not-to-exceed ~ a radius of 55 km a radius of 600 km

AA & AB. Moving and Placing Pianos or Organs: When moving and placing pianos or organs between residences are involved for local moves under Item A031, the contractor shall be paid the unit price listed hereunder in addition to the rate of Item A031.

Grand Piano

AB.

6 2

Annual Quantity Quantity (Unit: ea) (Unit: ea)

AA.

1 1

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Annual

Total

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

Upright Piano or Organ

AC. When the piano or organ is to be moved to or moved from the second floor or above, the following rate shall be added to the rate under Item A034AA or A034AB for each floor covered. However, this additional rate does not apply when a building elevator is available.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Unit Price

Total

Annual Annual Quantity Quantity (Unit: per service)

(Unit: per service)

To/from second floor or above

AD. Services Performed by Third Party: Third party services as specified in PWS PART I, paragraph A.6.

Note: The contractor must bill the Government for the requested/required third party services as a separate charge on the invoice supported by two (2) copies of the paid receipt/invoice from the third party.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

AC.

4 1

Unit Price

Total

Annual Annual Quantity Quantity (Unit: per pick-up)

(Unit: per pick-up)

Indefinite Third Party

AE. Additional Pickup and Delivery: In conjunction with Item A031, add a rate for one (1) additional pickup point or one

(1) additional delivery point for one (1) shipment within the performance area.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated

AD.

1 TBD Indefinite 1 TBD

AE.

4 No requirement

Pickup or Delivery

b. c.

Annual Annual Quantity Quantity (Unit: ea) (Unit: ea)

AF. Crane: Items of unusual heavy furniture. Except pianos and organs, may require service by a third party which is arranged by the contractor with the authorization of the ordering officer.

Item

ZAMA YOKOSUKA

Estimated

Unit Price

Total

Estimated Unit Price

Total

Rate

Total

Annual Annual Quantity Quantity

(Unit: NCWT) (Unit: NCWT)

Indefinite Crane

AG. Overtime: Rates at Item A031shall be increased by the following percentage (%) for services ordered to be accomplished during other than regular working hours (PWS PART I, para. A.3.b.)

Item

ZAMA YOKOSUKA

Estimated

Rate

Total

Estimated

AF.

1 TBD Indefinite 1 TBD

AREA TOTAL

ZAMA

YOKOSUKA

d.

Overtime

(a) Estimated Annual Quantity 10 = (c) 0.09% of (b) Total Estimated Quantity of A031

(d) Extended Amount for Overtime = Total Extended Amount for A031 x Estimated Annual Qty (0.09%) x Rate (%)

RECAPITULATION SCHEDULE III

4,600 0.09%

AG.

No requirement a. 4 %

ESTIMATED TOTAL OF SCHEDULE I, II, AND III

Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).

(Insert this amount at CLINs in SF1449)

0001 ZAMA

0002 YOKOSUKA

ESTIMATED TOTAL OF SCHEDULE III

(INTRA-CITY AND INTRA-MOVES)

Notes: All data deliverables specified on the DD 1423 will be provided not separately priced (NSP).

RECAPITULATION SCHEDULE I, II, AND III

CLIN AREA TOTAL

File details come from the government source that posted it. Updated .