06. Attachment 3-Schedule Submittal

View the file

Other files

File Type Posted
Attachment_of_Amend_0003-_Add_2_Spec_A12100.pdf PDF
Amend-FA5209-13-R-0002-0003.pdf PDF
Revised_OF_17.pdf PDF
Amendment_0002.pdf PDF
Q A-FA5209-13-R-0002.pdf PDF
Pre-Proposal_Conference-Minutes.pdf PDF
Amend_FA5209-13-R-0002-0001.pdf PDF
05._Attach_1-Contract_Spec.pdf PDF
04._Exhibits_(A_thru_E).xls XLS spreadsheet
07._Attach_4-PP_Questionnaire.pdf PDF
01._DD1707.pdf PDF
08._OF17.pdf PDF
09._Attendees_List.pdf PDF
02._Government_Policy_Letter.pdf PDF
03._SF1442.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

A-12-100

TO BE COMPLETED BY CONTRACT ADMINISTRATOR CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SECTION 01 11 00

1.12.2 Safety *

SECTION 01 11 00

1.12.3 Environmental **

SECTION 01 11 00

2.1 Memo for HM Usage

SECTION 01 11 00

1.12.4 SSHO

SECTION 01 11 00

1.12.5 Site Manager

SECTION 01 11 00

1.22.1 As-Built Drawing

SECTION 01 35 30

1.6 Accident Prevention Plan (APP)

SECTION 01 35 30

1.7 Activity Hazard Analysis (AHA)

SECTION 01 35 30

1.6.1 Crane Critical Lift Plan

SECTION 01 35 30

1.5.1.3 Crane Operators

SECTION 01 74 19

1.6 Waste Management Plan

SECTION 01 74 19

1.7 Manifest

SECTION 02 41 00

1.8 Dem / Deconst Plan

SECTION 03 15 14

2.1.1 Premolded Expansion Joint Fill

SECTION 03 30 00

1.4.1.1 Reinforcing Steel

13 X

14 X

X

11 X

10 X

9 X

8 X

7 X

X

O

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

C A

LC

U

LA

TO

N S

H

EE

TS

O

PE

R A

T.

M A

IN

T.

X

W O

R K

P R

O C

ED

U

R E

PL

A

N S

LI

C

EN

SE

S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

2 X

X

X

X6

A

A

A

A

A

D

A

A

A

A

A

A

A

E

15 X A

RFP No. FA5209-13-R-0002IDIQ for Fencing and Paving

SUBMISSION DATE:

A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI

* Safety Office Only ** Env. Div Only Page 1 of 9

A-12-100

TO BE COMPLETED BY CONTRACT ADMINISTRATOR CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

C A

LC

U

LA

TO

N S

H

EE

TS

O

PE

R A

T.

M A

IN

T.

W O

R K

P R

O C

ED

U

R E

PL

A

N S

LI

C

EN

SE

S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

RFP No. FA5209-13-R-0002IDIQ for Fencing and Paving

SECTION 03 30 00

2.3.1 Mix Design

SECTION 03 30 00

2.4.1 Cement

SECTION 03 30 00

2.5 Reinforcement

SECTION 03 30 00

2.4.4 Admixtures

SECTION 03 30 00

2.4.3 Aggregates

SECTION 03 30 00

3.9.1.1 Slump Test

SECTION 03 30 00

3.9.1.2 Compuressive Strength

SECTION 03 30 00

3.9.1.3 Air Content

SECTION 03 30 00

3.9.1.4 Ion Concentration

SECTION 04 20 00

2.1 Concrete Masonry Units (CMU)

SECTION 04 20 00

2.1 Concrete Masonry Units (CMU)

SECTION 04 20 00

2.3 Reinforcing Steel Bars and Rods

SECTION 04 20 00

3.8.1 Filling Concrete Testing

SECTION 04 20 00

3.2.1 Reinforced Concrete Masonry U

SECTION 05 50 00

2.1.1 Guard Rail Post

X D24

X D23

X D22

X D21

X A20

AX

A

X E

X

AX

A

A

X

X A

X

X

A

A

X

A

X

X

SUBMISSION DATE:

A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI

** Env. Div Only Page 2 of 9

A-12-100

TO BE COMPLETED BY CONTRACT ADMINISTRATOR CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

C A

LC

U

LA

TO

N S

H

EE

TS

O

PE

R A

T.

M A

IN

T.

W O

R K

P R

O C

ED

U

R E

PL

A

N S

LI

C

EN

SE

S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

RFP No. FA5209-13-R-0002IDIQ for Fencing and Paving

SECTION 05 50 00

2.1.2 Guard Rail for Vehicle Barries

SECTION 05 50 00

2.1.3 Cable Barrier

SECTION 05 50 00

2.1.1 Guard Rail Post

SECTION 05 50 00

2.1.2 Guard Rail for Vehicle Barries

SECTION 05 50 00

2.1.3 Cable Barrier

SECTION 05 50 00

2.2.3.2 Pretreatment, Priming and Pa

SECTION 05 50 00

3.1 manufacturer's instructions

SECTION 10 14 01

3.1 Approved Detail Drawings

SECTION 10 14 01

2.1 Exterior Traffic Signage

SECTION 10 14 01

2.2 traffic plate

SECTION 10 14 01

3.1 Installation

SECTION 31 23 00

1.5.1 Shoring and Sheeting Plan

SECTION 31 23 00

3.9.1.2 CBR of soil in laboraratory

SECTION 31 23 00

3.9.1.1 Test of soil compaction using

SECTION 31 23 00

3.9.1.3 CBR of in-situ soil X C45

X44 C

X C43

42 X A

A41 X

40 X A

A39 X

38 X A

AX37

36 X A

A

A

X

A

X

X

A

A

X

X

SUBMISSION DATE:

A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI

** Env. Div Only Page 3 of 9

A-12-100

TO BE COMPLETED BY CONTRACT ADMINISTRATOR CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

C A

LC

U

LA

TO

N S

H

EE

TS

O

PE

R A

T.

M A

IN

T.

W O

R K

P R

O C

ED

U

R E

PL

A

N S

LI

C

EN

SE

S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

RFP No. FA5209-13-R-0002IDIQ for Fencing and Paving

SECTION 31 23 00

3.9.1.4 Soil density by the sand replc

SECTION 31 23 00

3.9.1.5 Plate Load Test on soil for ro

SECTION 32 01 19

1.5.2.2 Manufacturer's Recommenda

SECTION 32 11 23

1.6 Plant, Equipment, and Tools

SECTION 32 11 23

1.4.1.1 Sieve Analysis

SECTION 32 11 23

1.4.1.2 Liquid Limit and Plasticity In

SECTION 32 11 23

1.4.1.3 Wear Test

SECTION 32 11 23

1.4.1.4 Compaction Test

SECTION 32 11 23

1.4.1.5 Thickness Test

SECTION 32 11 23

1.4.1.6 California Bearing Ratio (CB

SECTION 32 12 10

3.6 Sampling and Testing

SECTION 32 12 17

1.3.1 Job-mix formula

SECTION 32 12 17

2.2 Asphalt cement binder

SECTION 32 12 17

2.3 Mix design

SECTION 32 12 17

2.4.1 Specific gravity test of asphalt X60 C

X A59

58 X A

X A57

X56 C

X A55

X54 A

X A53

X52 A

X A51

X50 A

A49 X

48 X A

X C47

X46 C

SUBMISSION DATE:

A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI

** Env. Div Only Page 4 of 9

A-12-100

TO BE COMPLETED BY CONTRACT ADMINISTRATOR CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

C A

LC

U

LA

TO

N S

H

EE

TS

O

PE

R A

T.

M A

IN

T.

W O

R K

P R

O C

ED

U

R E

PL

A

N S

LI

C

EN

SE

S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

RFP No. FA5209-13-R-0002IDIQ for Fencing and Paving

SECTION 32 12 17

2.4.1 Coarse aggregate tests

SECTION 32 12 17

2.4.1 Weight of slag test

SECTION 32 12 17

2.4.1 Fine aggregate tests

SECTION 32 12 17

3.5.1.1 Aggregates tests

SECTION 32 12 18

3.15 Contractor Quality Control

SECTION 32 12 18

2.4.1 Open Graded Asphalt Job Mix

SECTION 32 12 18

2.4.2 Job Mix Formula for Slurry Gro

SECTION 32 12 18

2.1.1 Coarse Aggregate

SECTION 32 12 18

2.1 Coarse and Fine Aggregates

SECTION 32 12 18

2.1.3 Open-Graded Mix Aggregate

SECTION 32 12 18

2.2 Bituminous Material

SECTION 32 12 18

2.1.4 Slurry Grout Sand

SECTION 32 13 13

2.1.3 Aggregate

SECTION 32 13 13

2.1.5.1 Dowel

SECTION 32 13 13

2.1.6 Curing materials A75 X

74 X A

A73 X

X72 A

X A71

X70 A

X A69

X68 A

X A67

66 X A

A65 X

X64 A

X A63

X62 A

X A61

SUBMISSION DATE:

A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI

** Env. Div Only Page 5 of 9

A-12-100

TO BE COMPLETED BY CONTRACT ADMINISTRATOR CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

C A

LC

U

LA

TO

N S

H

EE

TS

O

PE

R A

T.

M A

IN

T.

W O

R K

P R

O C

ED

U

R E

PL

A

N S

LI

C

EN

SE

S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

RFP No. FA5209-13-R-0002IDIQ for Fencing and Paving

SECTION 32 13 13

2.1.8 Crushed Stone for Water Perme

SECTION 32 13 13

2.1.4 Admixtures

SECTION 32 13 13

2.1.1 Cementitious materials

SECTION 32 13 13

2.3 mix design

SECTION 32 13 13

2.1.3 Aggregate

SECTION 32 13 13

3.6.2 Concrete slump tests

SECTION 32 13 13

3.6.4 Air content tests

SECTION 32 13 13

3.6.3 Compressive Strength Tests

SECTION 32 13 13

1.4.1 Ready-mixed concrete plant

SECTION 32 13 13

1.4.3 Batch tickets

SECTION 32 16 13

2.3 Concrete

SECTION 32 16 13

2.1 Precast concrete curb and gutter

SECTION 32 16 13

2.2 Precast reinforced concrete gutter

SECTION 32 16 13

3.8 Field Quality Control

SECTION 32 17 23

2.1.1 Paints for Roads and Streets90 X A

X E89

88 X A

A87 X

86 X A

EX85

84 AX

X C83

X82 C

X C81

X80 A

X A79

78 X A

A77 X

76 X A

SUBMISSION DATE:

A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI

** Env. Div Only Page 6 of 9

A-12-100

TO BE COMPLETED BY CONTRACT ADMINISTRATOR CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

C A

LC

U

LA

TO

N S

H

EE

TS

O

PE

R A

T.

M A

IN

T.

W O

R K

P R

O C

ED

U

R E

PL

A

N S

LI

C

EN

SE

S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

RFP No. FA5209-13-R-0002IDIQ for Fencing and Paving

SECTION 32 17 23

2.1.2 Paints for Heliport

SECTION 32 17 23

2.1.3 Reflective Media for Heliport, R

SECTION 32 17 23

2.1.1 Paints for Roads and Streets

SECTION 32 17 23

2.1.2 Paints for Heliport

SECTION 32 17 23

2.1.3 Reflective Media for Heliport, R

SECTION 32 31 13

1.5 Installation Drawings

SECTION 32 31 13

2.1 Fence Assembly

SECTION 32 31 13

2.9 Gate Assembly

SECTION 32 31 13

2.12 Inner Fence and Gate

SECTION 32 31 13

2.10 Reinforced chain link security fe

SECTION 32 31 13

2.11.1 Temporary Enclosure

SECTION 32 31 13

3.6 Grounding

SECTION 32 31 13

2.1 Fence Assembly

SECTION 32 31 13

2.11.2 Gate Hardware and Accessori

SECTION 32 31 13

2.12 Inner Fence and Gate

AX95

94 AX

AX93

92 X A

A91 X

96 X A

97 X A

98 X A

99 X A

100 X A

101 X A

102 X A

103 X A

104 X A

105 X A

SUBMISSION DATE:

A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI

** Env. Div Only Page 7 of 9

A-12-100

TO BE COMPLETED BY CONTRACT ADMINISTRATOR CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

C A

LC

U

LA

TO

N S

H

EE

TS

O

PE

R A

T.

M A

IN

T.

W O

R K

P R

O C

ED

U

R E

PL

A

N S

LI

C

EN

SE

S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

RFP No. FA5209-13-R-0002IDIQ for Fencing and Paving

SECTION 32 31 13

2.10 Reinforced chain link security fe

SECTION 32 31 13

2.13 Concrete

SECTION 32 31 13

3.5 hardware assembly

SECTION 32 31 13

3.6 Grounding

SECTION 32 31 13

2.14 High Zinc Dust Content Paint

SECTION 32 31 13

3.1 Fence Installation

SECTION 32 31 13

3.7 Manufacturer's Material Safety D

SECTION 32 92 23

2.1 Sods

SECTION 32 92 23

2.4 Fertilizer

SECTION 32 96 01

1.3.1 Work Plan

SECTION 32 96 01

1.3.5 Photographs

SECTION 33 05 16

2.1 Precast concrete pole

SECTION 33 05 16

2.2 Polyethylene Golf Nets

SECTION 33 05 16

2.1 Precast concrete pole

SECTION 33 05 16

2.2 Polyethylene Golf Nets

106 X A

107 X A

108 X A

109 X A

110 X A

111 X A

112 X A

113 X A

114 X A

115 X A

116 X A

117 X A

118 X A

119 X A

120 X A

SUBMISSION DATE:

A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI

** Env. Div Only Page 8 of 9

A-12-100

TO BE COMPLETED BY CONTRACT ADMINISTRATOR CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

C A

LC

U

LA

TO

N S

H

EE

TS

O

PE

R A

T.

M A

IN

T.

W O

R K

P R

O C

ED

U

R E

PL

A

N S

LI

C

EN

SE

S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

RFP No. FA5209-13-R-0002IDIQ for Fencing and Paving

SECTION 33 05 16

2.3 Other accessories

SECTION 33 05 16

2.4 Painting of Steel Pile and Concre

SECTION 33 05 16

3.2.1 Concrete pole manufacturer's in

SECTION 33 05 16

3.2.2 Golf net manufacturer's installa

SECTION 33 05 16

3.3 Winch manufacturer's maintenace

SECTION 33 05 16

3.4 Manufacturer's Material Safety D

SECTION 33 40 00

2.1 Pipes for storm drains

SECTION 33 40 00

2.3.1 Prefaricated Reinforced Concre

SECTION 33 40 00

2.3.2 Precast Cocnrete Gutter Inlet

SECTION 33 40 00

2.3.3 Frame and Cover for Gratings

SECTION 33 40 00

2.1 Pipes for storm drains

SECTION 33 40 00

2.3.1 Prefaricated Reinforced Concre

SECTION 33 40 00

2.3.2 Precast Cocnrete Gutter Inlet

SECTION 33 40 00

2.3.3 Frame and Cover for Gratings

SECTION 33 40 00

3.9.2 Operational Test

121 X A

122 X A

123 X A

124 X A

125 X A

126 X A

127 X A

128 X A

129 X A

130 X A

131 X A

132 X A

133 X A

A134 X

135 X D

SUBMISSION DATE:

A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI