Final Exhibit Price Schedule -COM 25 Jan 11.xlsx
XLSX spreadsheet 61 KB Posted
- Attached to
- Change of Occupancy Maintenance of Military Family Housing Units at Yokota Air Base, Japan
- Solicitation number
- FA520911R0001-0001
About this file
Revised Exhibits 25 Jan 11
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Basic Year: 1 Apr 11 thru 31 Mar 12 | |||||
| A001 | Perform COM Routine Repair and Replacement: | 645 | HSG UNIT | ¥0 |
| A002 | Incidental Labor (Reimbursable Materials): | |||
| Architectural Work | ||||
| A002AA | Replace/Install blinds and shades | 600 | EA | ¥0 |
| A002AB | Replace door locks with new cylinder door locks | 35 | EA | ¥0 |
| A002AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥0 |
| A002AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥0 |
| A002AE | Replace/install door | 5 | EA | ¥0 |
| A002AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥0 |
| A002AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥0 |
| A002AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥0 |
| A002AJ | Repair/replace kitchen counter tops | 2 | EA | ¥0 |
| A002AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥0 |
| A002AL | Repair/replace shoji screens | 4 | EA | ¥0 |
| Mechanical Work | ||||
| A002AM | Replace faucets/faucet diverter | 26 | EA | ¥0 |
| A002AN | Replace combination faucet for bathtub | 2 | EA | ¥0 |
| A002AP | Replace kitchen range hoods | 1 | EA | ¥0 |
| A002AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥0 |
| Electrical Work | ||||
| A002AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥0 |
| A002AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥0 |
| A002AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 199 | EA | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN A002 | ¥0 |
| A003 | Additional Maintenance Work (Unit Price Basis): | |||
| Painting: | ||||
| A003AA | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥0 |
| A003AB | Semi-gloss Base Enamel w/Surface Preparation | 668,630 | SF | ¥0 |
| A003AC | Varnish and Stain w/Surface Preparation | 119,027 | SF | ¥0 |
| Architectural Repair/Replacement | ||||
| Floor Work: | ||||
| A003AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥0 |
| A003AE | Replace/Install 2mm thick vinyl sheet flooring | 364 | SF | ¥0 |
| A003AF | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 8,371 | SF | ¥0 |
| A003AG | Replace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden) | 6,513 | SF | ¥0 |
| A003AH | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 100 | EA | ¥0 |
| A003AJ | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | SF | ¥0 |
| A003AK | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥0 |
| A003AL | Replace 6"x 6" quarry tile | 50 | EA | ¥0 |
| A003AM | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥0 |
| A003AN | Repair/Replace concrete floor edge on patio | 33 | SF | ¥0 |
| Floor Maintenance (Wax Finish) | ||||
| A003AP | Floor Maintenance (2BR/3BR) | 33 | HSG UNIT | ¥0 |
| A003AQ | Floor Maintenance (4BR/SOQ/GOQ Units) | 16 | HSG UNIT | ¥0 |
| A003AR | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 619 | HSG UNIT | ¥0 |
| Carpet Cleaning | ||||
| A003AS | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥0 |
| A003AT | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥0 |
| A003AU | Remove existing wall-to-wall carpet. | 30 | SY | ¥0 |
| A003AV | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥0 |
| A003AW | Repair/patch of wall-to-wall carpet | 189 | SY | ¥0 |
| Wall & Ceiling Work | ||||
| A003AX | Remove damaged baseboard and replace with new vinyl base | 2,752 | LF | ¥0 |
| A003AY | Replace ceiling acoustic tile | 41 | SF | ¥0 |
| A003AZ | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥0 |
| A003BA | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥0 |
| A003BB | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥0 |
| A003BC | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥0 |
| A003BD | Remove & replace ceiling access door (Garden) w/new aluminum framed door | 1 | EA | ¥0 |
| A003BE | Remove damaged rough lumber and replace with new (Garden) | 15 | BF | ¥0 |
| A003BF | Remove damaged curtain box & replace w/new paint finish curtain box (Garden) | 1 | EA | ¥0 |
| A003BG | Remove vinyl wall covering and replace with new wall covering | 348 | SF | ¥0 |
| A003BH | Remove vinyl wall covering and paint wall | 10,115 | SF | ¥0 |
| Door & Window Work: | ||||
| A003BJ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥0 |
| A003BK | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥0 |
| A003BL | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥0 |
| A003BM | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥0 |
| A003BN | Replace aluminum window railing, incl. bolts & hardware (Garden) | 1 | EA | ¥0 |
| A003BP | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥0 |
| A003BQ | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥0 |
| Cabinet Work | ||||
| A003BR | Replace damaged cabinet bottom and back | 25 | SF | ¥0 |
| A003BS | Replace damaged plastic laminated sheets | 1,589 | SF | ¥0 |
| A003BT | Replace damaged cabinet shelf | 12 | LF | ¥0 |
| Mechanical Maintenance, Repair & Replacement | ||||
| A003BU | Recoat bathtub with ceramic finish | 236 | EA | ¥0 |
| A003BV | Replace commode/water closet with new | 12 | EA | ¥0 |
| A003BW | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥0 |
| A003BX | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥0 |
| A003BY | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥0 |
| A003BZ | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥0 |
| A003CA | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥0 |
| A003CB | Replace "P" trap for lavatory or sink | 104 | EA | ¥0 |
| A003CC | Replace water tank for water closet | 1 | EA | ¥0 |
| A003CD | Replace water tank lid | 1 | EA | ¥0 |
| Electric Maintenance, Repair & Replacement: | ||||
| Other Electric Work: | ||||
| A003CE | Inspect/Check panel board to include megger test and report | 1 | EA | ¥0 |
| A003CF | Measure ground resistance of the grounding system and report | 1 | EA | ¥0 |
| A003CG | Installation of Occupant Name Tag | 591 | EA | ¥0 |
| A003CH | Install Government-furnished Window AC Unit 8,000 BTU | 1 | EA | ¥0 |
| A003CJ | Install Government-furnished Window AC Unit 18,000 BTU | 1 | EA | ¥0 |
| A003CK | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 119 | EA | ¥0 |
| A003CL | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN A003 | ¥0 |
| A004 | Cleaning Work | |||
| A004AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| A004AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| A004AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| A004AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| A004AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥0 |
| A004AF | Perform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ) | 442 | HSG UNIT | ¥0 |
| A004AG | Perform Full Cleaning GOQs | 2 | EA | ¥0 |
| A004AH | Perform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 32 | HSG UNIT | ¥0 |
| A004AJ | Perform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ) | 337 | HSG UNIT | ¥0 |
| Vacant Units and Local Move Cleaning | ||||
| A004AK | Vacant Unit Cleaning with Routine Maintenance (2/3/BR) | 97 | HSG UNIT | ¥0 |
| A004AL | Vacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ) | 43 | HSG UNIT | ¥0 |
| A004AM | Vacant Unit Cleaning without Routine Maintenance (2/3/BR) | 128 | HSG UNIT | ¥0 |
| A004AN | Vacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ) | 22 | HSG UNIT | ¥0 |
| A004AP | Perform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ) | 75 | HSG UNIT | ¥0 |
| A004AQ | Perform Local move COM Cleaning (2/3 Bedroom Units) | 70 | HSG UNIT | ¥0 |
| A004AR | Perform Local move COM Bathroom Cleaning (2/3 Bedroom Units) | 78 | HSG UNIT | ¥0 |
| A004AS | Perform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units) | 3 | HSG UNIT | ¥0 |
| A004AT | Perform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 8 | HSG UNIT | ¥0 |
| A004AU | Perform Local move COM Cleaning for GOQ | 1 | HSG UNIT | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN A004 | ¥0 | |||
| TOTAL ESTIMATED AMOUNT FOR BASIC PERIOD: | ¥0 |
&"Times New Roman,Bold"&12&UEXHIBIT A, PRICING SCHEDULE
&"Times New Roman,Regular"RFP No. FA5209-11-R-0001
EXHIBIT B
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Option 1: 1 Apr 12 thru 31 Mar 31 | |||||
| B001 | Perform COM Routine Repair and Replacement: | 645 | HSG UNIT | ¥0 |
| B002 | Incidental Labor (Reimbursable Materials): | |||
| Architectural Work | ||||
| B002AA | Replace/Install blinds and shades | 600 | EA | ¥0 |
| B002AB | Replace door locks with new cylinder door locks | 35 | EA | ¥0 |
| B002AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥0 |
| B002AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥0 |
| B002AE | Replace/install door | 5 | EA | ¥0 |
| B002AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥0 |
| B002AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥0 |
| B002AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥0 |
| B002AJ | Repair/replace kitchen counter tops | 2 | EA | ¥0 |
| B002AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥0 |
| B002AL | Repair/replace shoji screens | 4 | EA | ¥0 |
| Mechanical Work | ||||
| B002AM | Replace faucets/faucet diverter | 26 | EA | ¥0 |
| B002AN | Replace combination faucet for bathtub | 2 | EA | ¥0 |
| B002AP | Replace kitchen range hoods | 1 | EA | ¥0 |
| B002AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥0 |
| Electrical Work | ||||
| B002AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥0 |
| B002AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥0 |
| B002AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 199 | EA | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN B002 | ¥0 |
| B003 | Additional Maintenance Work (Unit Price Basis): | |||
| Painting: | ||||
| B003AA | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥0 |
| B003AB | Semi-gloss Base Enamel w/Surface Preparation | 668,630 | SF | ¥0 |
| B003AC | Varnish and Stain w/Surface Preparation | 119,027 | SF | ¥0 |
| Architectural Repair/Replacement | ||||
| Floor Work: | ||||
| B003AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥0 |
| B003AE | Replace/Install 2mm thick vinyl sheet flooring | 364 | SF | ¥0 |
| B003AF | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 8,371 | SF | ¥0 |
| B003AG | Replace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden) | 6,513 | SF | ¥0 |
| B003AH | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 100 | EA | ¥0 |
| B003AJ | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | SF | ¥0 |
| B003AK | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥0 |
| B003AL | Replace 6"x 6" quarry tile | 50 | EA | ¥0 |
| B003AM | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥0 |
| B003AN | Repair/Replace concrete floor edge on patio | 33 | SF | ¥0 |
| Floor Maintenance (Wax Finish) | ||||
| B003AP | Floor Maintenance (2BR/3BR) | 33 | HSG UNIT | ¥0 |
| B003AQ | Floor Maintenance (4BR/SOQ/GOQ Units) | 16 | HSG UNIT | ¥0 |
| B003AR | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 619 | HSG UNIT | ¥0 |
| Carpet Cleaning | ||||
| B003AS | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥0 |
| B003AT | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥0 |
| B003AU | Remove existing wall-to-wall carpet. | 30 | SY | ¥0 |
| B003AV | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥0 |
| B003AW | Repair/patch of wall-to-wall carpet | 189 | SY | ¥0 |
| Wall & Ceiling Work | ||||
| B003AX | Remove damaged baseboard and replace with new vinyl base | 2,752 | LF | ¥0 |
| B003AY | Replace ceiling acoustic tile | 41 | SF | ¥0 |
| B003AZ | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥0 |
| B003BA | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥0 |
| B003BB | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥0 |
| B003BC | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥0 |
| B003BD | Remove & replace ceiling access door (Garden) w/new aluminum framed door | 1 | EA | ¥0 |
| B003BE | Remove damaged rough lumber and replace with new (Garden) | 15 | BF | ¥0 |
| B003BF | Remove damaged curtain box & replace w/new paint finish curtain box (Garden) | 1 | EA | ¥0 |
| B003BG | Remove vinyl wall covering and replace with new wall covering | 348 | SF | ¥0 |
| B003BH | Remove vinyl wall covering and paint wall | 10,115 | SF | ¥0 |
| Door & Window Work: | ||||
| B003BJ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥0 |
| B003BK | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥0 |
| B003BL | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥0 |
| B003BM | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥0 |
| B003BN | Replace aluminum window railing, incl. bolts & hardware (Garden) | 1 | EA | ¥0 |
| B003BP | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥0 |
| B003BQ | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥0 |
| Cabinet Work | ||||
| B003BR | Replace damaged cabinet bottom and back | 25 | SF | ¥0 |
| B003BS | Replace damaged plastic laminated sheets | 1,589 | SF | ¥0 |
| B003BT | Replace damaged cabinet shelf | 12 | LF | ¥0 |
| Mechanical Maintenance, Repair & Replacement | ||||
| B003BU | Recoat bathtub with ceramic finish | 236 | EA | ¥0 |
| B003BV | Replace commode/water closet with new | 12 | EA | ¥0 |
| B003BW | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥0 |
| B003BX | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥0 |
| B003BY | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥0 |
| B003BZ | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥0 |
| B003CA | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥0 |
| B003CB | Replace "P" trap for lavatory or sink | 104 | EA | ¥0 |
| B003CC | Replace water tank for water closet | 1 | EA | ¥0 |
| B003CD | Replace water tank lid | 1 | EA | ¥0 |
| Electric Maintenance, Repair & Replacement: | ||||
| Other Electric Work: | ||||
| B003CE | Inspect/Check panel board to include megger test and report | 1 | EA | ¥0 |
| B003CF | Measure ground resistance of the grounding system and report | 1 | EA | ¥0 |
| B003CG | Installation of Occupant Name Tag | 591 | EA | ¥0 |
| B003CH | Install Government-furnished Window AC Unit 8,000 BTU | 1 | EA | ¥0 |
| B003CJ | Install Government-furnished Window AC Unit 18,000 BTU | 1 | EA | ¥0 |
| B003CK | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 119 | EA | ¥0 |
| B003CL | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN B003 | ¥0 |
| B004 | Cleaning Work | |||
| B004AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| B004AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| B004AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| B004AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| B004AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥0 |
| B004AF | Perform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ) | 442 | HSG UNIT | ¥0 |
| B004AG | Perform Full Cleaning GOQs | 2 | EA | ¥0 |
| B004AH | Perform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 32 | HSG UNIT | ¥0 |
| B004AJ | Perform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ) | 337 | HSG UNIT | ¥0 |
| Vacant Units and Local Move Cleaning | ||||
| B004AK | Vacant Unit Cleaning with Routine Maintenance (2/3/BR) | 97 | HSG UNIT | ¥0 |
| B004AL | Vacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ) | 43 | HSG UNIT | ¥0 |
| B004AM | Vacant Unit Cleaning without Routine Maintenance (2/3/BR) | 128 | HSG UNIT | ¥0 |
| B004AN | Vacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ) | 22 | HSG UNIT | ¥0 |
| B004AP | Perform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ) | 75 | HSG UNIT | ¥0 |
| B004AQ | Perform Local move COM Cleaning (2/3 Bedroom Units) | 70 | HSG UNIT | ¥0 |
| B004AR | Perform Local move COM Bathroom Cleaning (2/3 Bedroom Units) | 78 | HSG UNIT | ¥0 |
| B004AS | Perform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units) | 3 | HSG UNIT | ¥0 |
| B004AT | Perform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 8 | HSG UNIT | ¥0 |
| B004AU | Perform Local move COM Cleaning for GOQ | 1 | HSG UNIT | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN B004 | ¥0 | |||
| TOTAL ESTIMATED AMOUNT FOR OPTION ONE PERIOD: | ¥0 |
&"Times New Roman,Bold"&12&UEXHIBIT B, PRICING SCHEDULE
EXHIBIT C
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Option 2: 1 Apr 13 thru 31 Mar 14 | |||||
| C001 | Perform COM Routine Repair and Replacement: | 645 | HSG UNIT | ¥0 |
| C002 | Incidental Labor (Reimbursable Materials): | |||
| Architectural Work | ||||
| C002AA | Replace/Install blinds and shades | 600 | EA | ¥0 |
| C002AB | Replace door locks with new cylinder door locks | 35 | EA | ¥0 |
| C002AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥0 |
| C002AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥0 |
| C002AE | Replace/install door | 5 | EA | ¥0 |
| C002AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥0 |
| C002AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥0 |
| C002AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥0 |
| C002AJ | Repair/replace kitchen counter tops | 2 | EA | ¥0 |
| C002AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥0 |
| C002AL | Repair/replace shoji screens | 4 | EA | ¥0 |
| Mechanical Work | ||||
| C002AM | Replace faucets/faucet diverter | 26 | EA | ¥0 |
| C002AN | Replace combination faucet for bathtub | 2 | EA | ¥0 |
| C002AP | Replace kitchen range hoods | 1 | EA | ¥0 |
| C002AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥0 |
| Electrical Work | ||||
| C002AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥0 |
| C002AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥0 |
| C002AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 199 | EA | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN C002 | ¥0 |
| C003 | Additional Maintenance Work (Unit Price Basis): | |||
| Painting: | ||||
| C003AA | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥0 |
| C003AB | Semi-gloss Base Enamel w/Surface Preparation | 668,630 | SF | ¥0 |
| C003AC | Varnish and Stain w/Surface Preparation | 119,027 | SF | ¥0 |
| Architectural Repair/Replacement | ||||
| Floor Work: | ||||
| C003AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥0 |
| C003AE | Replace/Install 2mm thick vinyl sheet flooring | 364 | SF | ¥0 |
| C003AF | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 8,371 | SF | ¥0 |
| C003AG | Replace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden) | 6,513 | SF | ¥0 |
| C003AH | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 100 | EA | ¥0 |
| C003AJ | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | SF | ¥0 |
| C003AK | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥0 |
| C003AL | Replace 6"x 6" quarry tile | 50 | EA | ¥0 |
| C003AM | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥0 |
| C003AN | Repair/Replace concrete floor edge on patio | 33 | SF | ¥0 |
| Floor Maintenance (Wax Finish) | ||||
| C003AP | Floor Maintenance (2BR/3BR) | 33 | HSG UNIT | ¥0 |
| C003AQ | Floor Maintenance (4BR/SOQ/GOQ Units) | 16 | HSG UNIT | ¥0 |
| C003AR | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 619 | HSG UNIT | ¥0 |
| Carpet Cleaning | ||||
| C003AS | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥0 |
| C003AT | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥0 |
| C003AU | Remove existing wall-to-wall carpet. | 30 | SY | ¥0 |
| C003AV | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥0 |
| C003AW | Repair/patch of wall-to-wall carpet | 189 | SY | ¥0 |
| Wall & Ceiling Work | ||||
| C003AX | Remove damaged baseboard and replace with new vinyl base | 2,752 | LF | ¥0 |
| C003AY | Replace ceiling acoustic tile | 41 | SF | ¥0 |
| C003AZ | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥0 |
| C003BA | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥0 |
| C003BB | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥0 |
| C003BC | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥0 |
| C003BD | Remove & replace ceiling access door (Garden) w/new aluminum framed door | 1 | EA | ¥0 |
| C003BE | Remove damaged rough lumber and replace with new (Garden) | 15 | BF | ¥0 |
| C003BF | Remove damaged curtain box & replace w/new paint finish curtain box (Garden) | 1 | EA | ¥0 |
| C003BG | Remove vinyl wall covering and replace with new wall covering | 348 | SF | ¥0 |
| C003BH | Remove vinyl wall covering and paint wall | 10,115 | SF | ¥0 |
| Door & Window Work: | ||||
| C003BJ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥0 |
| C003BK | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥0 |
| C003BL | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥0 |
| C003BM | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥0 |
| C003BN | Replace aluminum window railing, incl. bolts & hardware (Garden) | 1 | EA | ¥0 |
| C003BP | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥0 |
| C003BQ | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥0 |
| Cabinet Work | ||||
| C003BR | Replace damaged cabinet bottom and back | 25 | SF | ¥0 |
| C003BS | Replace damaged plastic laminated sheets | 1,589 | SF | ¥0 |
| C003BT | Replace damaged cabinet shelf | 12 | LF | ¥0 |
| Mechanical Maintenance, Repair & Replacement | ||||
| C003BU | Recoat bathtub with ceramic finish | 236 | EA | ¥0 |
| C003BV | Replace commode/water closet with new | 12 | EA | ¥0 |
| C003BW | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥0 |
| C003BX | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥0 |
| C003BY | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥0 |
| C003BZ | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥0 |
| C003CA | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥0 |
| C003CB | Replace "P" trap for lavatory or sink | 104 | EA | ¥0 |
| C003CC | Replace water tank for water closet | 1 | EA | ¥0 |
| C003CD | Replace water tank lid | 1 | EA | ¥0 |
| Electric Maintenance, Repair & Replacement: | ||||
| Other Electric Work: | ||||
| C003CE | Inspect/Check panel board to include megger test and report | 1 | EA | ¥0 |
| C003CF | Measure ground resistance of the grounding system and report | 1 | EA | ¥0 |
| C003CG | Installation of Occupant Name Tag | 591 | EA | ¥0 |
| C003CH | Install Government-furnished Window AC Unit 8,000 BTU | 1 | EA | ¥0 |
| C003CJ | Install Government-furnished Window AC Unit 18,000 BTU | 1 | EA | ¥0 |
| C003CK | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 119 | EA | ¥0 |
| C003CL | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN C003 | ¥0 |
| C004 | Cleaning Work | |||
| C004AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| C004AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| C004AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| C004AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| C004AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥0 |
| C004AF | Perform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ) | 442 | HSG UNIT | ¥0 |
| C004AG | Perform Full Cleaning GOQs | 2 | EA | ¥0 |
| C004AH | Perform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 32 | HSG UNIT | ¥0 |
| C004AJ | Perform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ) | 337 | HSG UNIT | ¥0 |
| Vacant Units and Local Move Cleaning | ||||
| C004AK | Vacant Unit Cleaning with Routine Maintenance (2/3/BR) | 97 | HSG UNIT | ¥0 |
| C004AL | Vacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ) | 43 | HSG UNIT | ¥0 |
| C004AM | Vacant Unit Cleaning without Routine Maintenance (2/3/BR) | 128 | HSG UNIT | ¥0 |
| C004AN | Vacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ) | 22 | HSG UNIT | ¥0 |
| C004AP | Perform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ) | 75 | HSG UNIT | ¥0 |
| C004AQ | Perform Local move COM Cleaning (2/3 Bedroom Units) | 70 | HSG UNIT | ¥0 |
| C004AR | Perform Local move COM Bathroom Cleaning (2/3 Bedroom Units) | 78 | HSG UNIT | ¥0 |
| C004AS | Perform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units) | 3 | HSG UNIT | ¥0 |
| C004AT | Perform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 8 | HSG UNIT | ¥0 |
| C004AU | Perform Local move COM Cleaning for GOQ | 1 | HSG UNIT | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN C004 | ¥0 | |||
| TOTAL ESTIMATED AMOUNT FOR OPTION TWO PERIOD: | ¥0 |
&"Times New Roman,Bold"&12&UEXHIBIT C, PRICING SCHEDULE
EXHIBIT D
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Option 3: 1 Apr 14 thru 31 Mar 15 | |||||
| D001 | Perform COM Routine Repair and Replacement: | 645 | HSG UNIT | ¥0 |
| D002 | Incidental Labor (Reimbursable Materials): | |||
| Architectural Work | ||||
| D002AA | Replace/Install blinds and shades | 600 | EA | ¥0 |
| D002AB | Replace door locks with new cylinder door locks | 35 | EA | ¥0 |
| D002AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥0 |
| D002AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥0 |
| D002AE | Replace/install door | 5 | EA | ¥0 |
| D002AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥0 |
| D002AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥0 |
| D002AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥0 |
| D002AJ | Repair/replace kitchen counter tops | 2 | EA | ¥0 |
| D002AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥0 |
| D002AL | Repair/replace shoji screens | 4 | EA | ¥0 |
| Mechanical Work | ||||
| D002AM | Replace faucets/faucet diverter | 26 | EA | ¥0 |
| D002AN | Replace combination faucet for bathtub | 2 | EA | ¥0 |
| D002AP | Replace kitchen range hoods | 1 | EA | ¥0 |
| D002AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥0 |
| Electrical Work | ||||
| D002AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥0 |
| D002AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥0 |
| D002AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 199 | EA | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN D002 | ¥0 |
| D003 | Additional Maintenance Work (Unit Price Basis): | |||
| Painting: | ||||
| D003AA | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥0 |
| D003AB | Semi-gloss Base Enamel w/Surface Preparation | 668,630 | SF | ¥0 |
| D003AC | Varnish and Stain w/Surface Preparation | 119,027 | SF | ¥0 |
| Architectural Repair/Replacement | ||||
| Floor Work: | ||||
| D003AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥0 |
| D003AE | Replace/Install 2mm thick vinyl sheet flooring | 364 | SF | ¥0 |
| D003AF | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 8,371 | SF | ¥0 |
| D003AG | Replace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden) | 6,513 | SF | ¥0 |
| D003AH | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 100 | EA | ¥0 |
| D003AJ | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | SF | ¥0 |
| D003AK | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥0 |
| D003AL | Replace 6"x 6" quarry tile | 50 | EA | ¥0 |
| D003AM | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥0 |
| D003AN | Repair/Replace concrete floor edge on patio | 33 | SF | ¥0 |
| Floor Maintenance (Wax Finish) | ||||
| D003AP | Floor Maintenance (2BR/3BR) | 33 | HSG UNIT | ¥0 |
| D003AQ | Floor Maintenance (4BR/SOQ/GOQ Units) | 16 | HSG UNIT | ¥0 |
| D003AR | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 619 | HSG UNIT | ¥0 |
| Carpet Cleaning | ||||
| D003AS | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥0 |
| D003AT | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥0 |
| D003AU | Remove existing wall-to-wall carpet. | 30 | SY | ¥0 |
| D003AV | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥0 |
| D003AW | Repair/patch of wall-to-wall carpet | 189 | SY | ¥0 |
| Wall & Ceiling Work | ||||
| D003AX | Remove damaged baseboard and replace with new vinyl base | 2,752 | LF | ¥0 |
| D003AY | Replace ceiling acoustic tile | 41 | SF | ¥0 |
| D003AZ | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥0 |
| D003BA | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥0 |
| D003BB | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥0 |
| D003BC | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥0 |
| D003BD | Remove & replace ceiling access door (Garden) w/new aluminum framed door | 1 | EA | ¥0 |
| D003BE | Remove damaged rough lumber and replace with new (Garden) | 15 | BF | ¥0 |
| D003BF | Remove damaged curtain box & replace w/new paint finish curtain box (Garden) | 1 | EA | ¥0 |
| D003BG | Remove vinyl wall covering and replace with new wall covering | 348 | SF | ¥0 |
| D003BH | Remove vinyl wall covering and paint wall | 10,115 | SF | ¥0 |
| Door & Window Work: | ||||
| D003BJ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥0 |
| D003BK | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥0 |
| D003BL | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥0 |
| D003BM | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥0 |
| D003BN | Replace aluminum window railing, incl. bolts & hardware (Garden) | 1 | EA | ¥0 |
| D003BP | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥0 |
| D003BQ | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥0 |
| Cabinet Work | ||||
| D003BR | Replace damaged cabinet bottom and back | 25 | SF | ¥0 |
| D003BS | Replace damaged plastic laminated sheets | 1,589 | SF | ¥0 |
| D003BT | Replace damaged cabinet shelf | 12 | LF | ¥0 |
| Mechanical Maintenance, Repair & Replacement | ||||
| D003BU | Recoat bathtub with ceramic finish | 236 | EA | ¥0 |
| D003BV | Replace commode/water closet with new | 12 | EA | ¥0 |
| D003BW | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥0 |
| D003BX | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥0 |
| D003BY | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥0 |
| D003BZ | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥0 |
| D003CA | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥0 |
| D003CB | Replace "P" trap for lavatory or sink | 104 | EA | ¥0 |
| D003CC | Replace water tank for water closet | 1 | EA | ¥0 |
| D003CD | Replace water tank lid | 1 | EA | ¥0 |
| Electric Maintenance, Repair & Replacement: | ||||
| Other Electric Work: | ||||
| D003CE | Inspect/Check panel board to include megger test and report | 1 | EA | ¥0 |
| D003CF | Measure ground resistance of the grounding system and report | 1 | EA | ¥0 |
| D003CG | Installation of Occupant Name Tag | 591 | EA | ¥0 |
| D003CH | Install Government-furnished Window AC Unit 8,000 BTU | 1 | EA | ¥0 |
| D003CJ | Install Government-furnished Window AC Unit 18,000 BTU | 1 | EA | ¥0 |
| D003CK | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 119 | EA | ¥0 |
| D003CL | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN D003 | ¥0 |
| D004 | Cleaning Work | |||
| D004AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| D004AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| D004AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| D004AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| D004AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥0 |
| D004AF | Perform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ) | 442 | HSG UNIT | ¥0 |
| D004AG | Perform Full Cleaning GOQs | 2 | EA | ¥0 |
| D004AH | Perform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 32 | HSG UNIT | ¥0 |
| D004AJ | Perform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ) | 337 | HSG UNIT | ¥0 |
| Vacant Units and Local Move Cleaning | ||||
| D004AK | Vacant Unit Cleaning with Routine Maintenance (2/3/BR) | 97 | HSG UNIT | ¥0 |
| D004AL | Vacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ) | 43 | HSG UNIT | ¥0 |
| D004AM | Vacant Unit Cleaning without Routine Maintenance (2/3/BR) | 128 | HSG UNIT | ¥0 |
| D004AN | Vacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ) | 22 | HSG UNIT | ¥0 |
| D004AP | Perform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ) | 75 | HSG UNIT | ¥0 |
| D004AQ | Perform Local move COM Cleaning (2/3 Bedroom Units) | 70 | HSG UNIT | ¥0 |
| D004AR | Perform Local move COM Bathroom Cleaning (2/3 Bedroom Units) | 78 | HSG UNIT | ¥0 |
| D004AS | Perform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units) | 3 | HSG UNIT | ¥0 |
| D004AT | Perform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 8 | HSG UNIT | ¥0 |
| D004AU | Perform Local move COM Cleaning for GOQ | 1 | HSG UNIT | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN D004 | ¥0 | |||
| TOTAL ESTIMATED AMOUNT FOR OPTION THREE PERIOD: | ¥0 |
&"Times New Roman,Bold"&12&UEXHIBIT D, PRICING SCHEDULE
EXHIBIT E
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Option 4: 1 Apr 15 thru 31 Mar 16 | |||||
| E001 | Perform COM Routine Repair and Replacement: | 645 | HSG UNIT | ¥0 |
| E002 | Incidental Labor (Reimbursable Materials): | |||
| Architectural Work | ||||
| E002AA | Replace/Install blinds and shades | 600 | EA | ¥0 |
| E002AB | Replace door locks with new cylinder door locks | 35 | EA | ¥0 |
| E002AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥0 |
| E002AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥0 |
| E002AE | Replace/install door | 5 | EA | ¥0 |
| E002AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥0 |
| E002AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥0 |
| E002AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥0 |
| E002AJ | Repair/replace kitchen counter tops | 2 | EA | ¥0 |
| E002AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥0 |
| E002AL | Repair/replace shoji screens | 4 | EA | ¥0 |
| Mechanical Work | ||||
| E002AM | Replace faucets/faucet diverter | 26 | EA | ¥0 |
| E002AN | Replace combination faucet for bathtub | 2 | EA | ¥0 |
| E002AP | Replace kitchen range hoods | 1 | EA | ¥0 |
| E002AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥0 |
| Electrical Work | ||||
| E002AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥0 |
| E002AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥0 |
| E002AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 199 | EA | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN E002 | ¥0 |
| E003 | Additional Maintenance Work (Unit Price Basis): | |||
| Painting: | ||||
| E003AA | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥0 |
| E003AB | Semi-gloss Base Enamel w/Surface Preparation | 668,630 | SF | ¥0 |
| E003AC | Varnish and Stain w/Surface Preparation | 119,027 | SF | ¥0 |
| Architectural Repair/Replacement | ||||
| Floor Work: | ||||
| E003AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥0 |
| E003AE | Replace/Install 2mm thick vinyl sheet flooring | 364 | SF | ¥0 |
| E003AF | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 8,371 | SF | ¥0 |
| E003AG | Replace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden) | 6,513 | SF | ¥0 |
| E003AH | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 100 | EA | ¥0 |
| E003AJ | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | SF | ¥0 |
| E003AK | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥0 |
| E003AL | Replace 6"x 6" quarry tile | 50 | EA | ¥0 |
| E003AM | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥0 |
| E003AN | Repair/Replace concrete floor edge on patio | 33 | SF | ¥0 |
| Floor Maintenance (Wax Finish) | ||||
| E003AP | Floor Maintenance (2BR/3BR) | 33 | HSG UNIT | ¥0 |
| E003AQ | Floor Maintenance (4BR/SOQ/GOQ Units) | 16 | HSG UNIT | ¥0 |
| E003AR | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 619 | HSG UNIT | ¥0 |
| Carpet Cleaning | ||||
| E003AS | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥0 |
| E003AT | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥0 |
| E003AU | Remove existing wall-to-wall carpet. | 30 | SY | ¥0 |
| E003AV | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥0 |
| E003AW | Repair/patch of wall-to-wall carpet | 189 | SY | ¥0 |
| Wall & Ceiling Work | ||||
| E003AX | Remove damaged baseboard and replace with new vinyl base | 2,752 | LF | ¥0 |
| E003AY | Replace ceiling acoustic tile | 41 | SF | ¥0 |
| E003AZ | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥0 |
| E003BA | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥0 |
| E003BB | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥0 |
| E003BC | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥0 |
| E003BD | Remove & replace ceiling access door (Garden) w/new aluminum framed door | 1 | EA | ¥0 |
| E003BE | Remove damaged rough lumber and replace with new (Garden) | 15 | BF | ¥0 |
| E003BF | Remove damaged curtain box & replace w/new paint finish curtain box (Garden) | 1 | EA | ¥0 |
| E003BG | Remove vinyl wall covering and replace with new wall covering | 348 | SF | ¥0 |
| E003BH | Remove vinyl wall covering and paint wall | 10,115 | SF | ¥0 |
| Door & Window Work: | ||||
| E003BJ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥0 |
| E003BK | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥0 |
| E003BL | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥0 |
| E003BM | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥0 |
| E003BN | Replace aluminum window railing, incl. bolts & hardware (Garden) | 1 | EA | ¥0 |
| E003BP | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥0 |
| E003BQ | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥0 |
| Cabinet Work | ||||
| E003BR | Replace damaged cabinet bottom and back | 25 | SF | ¥0 |
| E003BS | Replace damaged plastic laminated sheets | 1,589 | SF | ¥0 |
| E003BT | Replace damaged cabinet shelf | 12 | LF | ¥0 |
| Mechanical Maintenance, Repair & Replacement | ||||
| E003BU | Recoat bathtub with ceramic finish | 236 | EA | ¥0 |
| E003BV | Replace commode/water closet with new | 12 | EA | ¥0 |
| E003BW | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥0 |
| E003BX | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥0 |
| E003BY | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥0 |
| E003BZ | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥0 |
| E003CA | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥0 |
| E003CB | Replace "P" trap for lavatory or sink | 104 | EA | ¥0 |
| E003CC | Replace water tank for water closet | 1 | EA | ¥0 |
| E003CD | Replace water tank lid | 1 | EA | ¥0 |
| Electric Maintenance, Repair & Replacement: | ||||
| Other Electric Work: | ||||
| E003CE | Inspect/Check panel board to include megger test and report | 1 | EA | ¥0 |
| E003CF | Measure ground resistance of the grounding system and report | 1 | EA | ¥0 |
| E003CG | Installation of Occupant Name Tag | 591 | EA | ¥0 |
| E003CH | Install Government-furnished Window AC Unit 8,000 BTU | 1 | EA | ¥0 |
| E003CJ | Install Government-furnished Window AC Unit 18,000 BTU | 1 | EA | ¥0 |
| E003CK | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 119 | EA | ¥0 |
| E003CL | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN E003 | ¥0 |
| E004 | Cleaning Work | |||
| E004AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| E004AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| E004AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| E004AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| E004AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥0 |
| E004AF | Perform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ) | 442 | HSG UNIT | ¥0 |
| E004AG | Perform Full Cleaning GOQs | 2 | EA | ¥0 |
| E004AH | Perform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 32 | HSG UNIT | ¥0 |
| E004AJ | Perform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ) | 337 | HSG UNIT | ¥0 |
| Vacant Units and Local Move Cleaning | ||||
| E004AK | Vacant Unit Cleaning with Routine Maintenance (2/3/BR) | 97 | HSG UNIT | ¥0 |
| E004AL | Vacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ) | 43 | HSG UNIT | ¥0 |
| E004AM | Vacant Unit Cleaning without Routine Maintenance (2/3/BR) | 128 | HSG UNIT | ¥0 |
| E004AN | Vacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ) | 22 | HSG UNIT | ¥0 |
| E004AP | Perform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ) | 75 | HSG UNIT | ¥0 |
| E004AQ | Perform Local move COM Cleaning (2/3 Bedroom Units) | 70 | HSG UNIT | ¥0 |
| E004AR | Perform Local move COM Bathroom Cleaning (2/3 Bedroom Units) | 78 | HSG UNIT | ¥0 |
| E004AS | Perform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units) | 3 | HSG UNIT | ¥0 |
| E004AT | Perform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 8 | HSG UNIT | ¥0 |
| E004AU | Perform Local move COM Cleaning for GOQ | 1 | HSG UNIT | ¥0 |
| TOTAL ESTIMATED AMOUNT FOR CLIN E004 | ¥0 | |||
| TOTAL ESTIMATED AMOUNT FOR OPTION FOUR PERIOD: | ¥0 |
&"Times New Roman,Bold"&12&UEXHIBIT E, PRICING SCHEDULE
File details come from the government source that posted it. Updated .